This is a Quality Assurance Surveillance Plan (QASP) for a federal contract administered by the U.S. Department of Agriculture, Agricultural Research Service (ARS) at the Beltsville Agricultural Research Center (BARC). The QASP establishes a systematic framework for monitoring contractor performance against defined standards and acceptable quality levels throughout the contract period.
The document identifies key government personnel responsible for surveillance: the Contracting Officer (CO) from ARS ensures overall contract compliance and safeguards U.S. interests, while the Contracting Officer's Representative (COR), David Johnson (Facility Security Officer, 301-504-0147), manages technical administration and maintains quality assurance documentation. The contractor is responsible for all quality control actions necessary to meet contract terms. The QASP defines five performance measures: Quality Performance (100% compliance with PWS requirements and OEM specifications verified through random inspection of qualification documents and equipment testing), Qualifications of Personnel (100% current value-added reseller (VAR) certification with no deviations accepted, verified through random inspection of qualification documents), Customer Service and Systems Maintenance and Repair (100% on-time attendance and availability verified through periodic sampling and access control reports), and Safety (100% immediate verbal and written incident reporting within 24 hours with no deviations accepted, verified through direct observation). Surveillance methods include periodic quarterly inspections by federal security personnel, daily physical presence verification, random sampling of up to ten CPRS records semi-annually, user complaint validation, and annual certification document review. The COR provides quarterly written performance reports to the CO using a five-tier rating system (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory) that feeds into past performance evaluation. When performance fails to meet acceptable quality levels, the CO issues formal written notification and the COR may prepare a Contract Discrepancy Report (CDR) requiring contractor corrective action plans, with the CO making final determinations on adequacy.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
a. What will be monitored?
b. How monitoring will take place.
c. Who will conduct the monitoring?
d. How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor through contract modification. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO). The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
Organization or Agency: US Department of Agriculture, Agricultural Research Service (ARS)
b. Contracting Officer’s Representative (COR). The COR is responsible for technical administration of the contract and shall ensure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: David Johnson, Facility Security Officer, (301) 504-0147
Organization or Agency: ARS, Beltsville Agricultural Research Center (BARC)
3. CONTRACTOR REPRESENTATIVES
The following employee(s) of the contractor serve as the contractor’s program manager(s) for this contract.
Primary:
Alternate:
4. PERFORMANCE STANDARDS
The contractor is responsible for the performance of ALL terms and conditions of the contract. CORs will provide contract progress reports quarterly to the CO reflecting performance on this plan and all other aspects of the resultant contract. The performance standards outlined in this QASP shall be used to determine the level of contractor performance in the elements defined. Performance standards define desired services.
The Government performs surveillance to determine the level of Contractor performance to these standards.
The Performance Requirements are listed below in Section 6. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the standard and assign a rating. At the end of the performance period, these ratings will be used, in part, to establish the past performance of the contractor on the contract.
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. For this service, 100% direct observation will not be performed by the
COR.
b. PERIODIC OBSERVATION. Quarterly periodic inspections will be completed by federal employees assigned to the Security Services Unit and reported to the COR. Physical presence is checked daily by the COR to see if contractor is present on the BARC campus and providing the services as required by the contract. Additional monitoring is provided through records management documentation and acceptance tests performed after completion of contractor work.
c. VALIDATED USER/CUSTOMER COMPLAINTS. Discussion with personnel receiving an identification badge and who have reported facility access challenges will be randomly polled quarterly or as needed by the COR.
d. RANDOM SAMPLING. Patient charts will be randomly sampled semi-annually by the COR reviewing up to ten (10) randomly selected CPRS records to verify required documentation and for resident supervision.
e. Verification and/or documentation provided by Contractor. COR will review certification requirements; documentation to be verified annually.
PERFORMANCE
MEASURES
Reference Performance
Requirement
Standard Acceptable Quality Level
Surveillance Method
Quality Performance 4.1.; 4.2.;
4.3.; 4.4.;
4.5.; 4.6.
Onsite technician must provide services in accordance with the PWS requirements and Original Equipment Manufactures specifications.
100% of tasks provided within OEM standards.
100% Random Inspection of qualification documents and testing of equipment.
Qualifications of Personnel
4.1.1.;
4.4.6.; 6.2.;
6.2.1.; 6.4
Personnel must have current value-added reseller (VAR) certification and must meet the qualifications in accordance with the PWS requirements.
100% VAR certified and qualified to perform services required in PWS.
100%, No deviations accepted.
Random Inspection of qualification documents.
Customer Service and systems maintenance and repair
9.1.; 9.2. Contract technician must be on time, onsite, and available providing services in accordance with PWS requirements.
100% attendance on time and available to perform services.
Contract technician is on-time and available to perform services 100% of the time.
Periodic Sampling by observation and through access control systems reports.
Safety 10.3. Safety incidents shall be reported immediately. All incidents must be reported in writing within 24 hours.
All (100%) safety incidents are immediately reported to the COR and Contractor management and in writing within 24 hours of the incident.
100% of safety incidents are immediately reported verbally and in writing within 24 hours of the incident. No acceptable deviations.
Direct observation.
6. RATINGS - Metrics and methods are designed to determine the rating for a given standard and acceptable quality level. The following ratings shall be used:
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT.
However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also there should have been NO significant weaknesses identified.
VERY GOOD: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also there should have been NO significant weaknesses identified.
SATISFACTORY: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also there should have been NO significant weaknesses identified.
MARGINAL: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g.
Management, Quality, Safety or Environmental Deficiency Reports, or letters).
7. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file.
When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action.
c. The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
See CDR below.
CONTRACT DISCREPANCY REPORT
1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS
DISCREPANCY
3. TO: (Contracting Officer) 4. FROM: (Name of COR)
5. DATES
a. CDR PREPARED b. RETURNED BY
CONTRACTOR:
c. ACTION COMPLETE
6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)
7. SIGNATURE OF COR Date:
8. SIGNATURE OF CONTRACTING OFFICER Date:
9a. TO (Contracting Officer) 9b. FROM (Contractor)
10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO
PREVENT RECURRENCE. (Cite applicable quality control program procedures or new procedures.
Attach continuation sheet(s) if necessary.)
11. SIGNATURE OF CONTRACTOR REPRESENTATIVE Date:
12. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
13. GOVERNMENT ACTIONS (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary.)
14. CLOSE OUT
NAME TITLE SIGNATURE DATE
CONTRACTOR NOTIFIED
COR
CONTRACTING OFFICER
8. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement. The frequency of measurement is defined in the contract or otherwise in this document. The government (COR or CO) will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Reporting. The COR shall communicate with the Contractor and will provide written reports to the Contracting Officer quarterly (or as outlined in the contract or COR delegation) to review Contractor performance.