11-SBE Subcontractors Material Suppliers List SBE-1 Form.pdf

PDF 99 KB Posted

Attached to
Low Pressure Sewer System Installations and Repairs (WORCS-2)
Solicitation number
IFB-26-00346
Issued by
Hillsborough County, Florida

About this file

This is a Small Business Encouragement (SBE) subcontractor and material supplier disclosure form for Hillsborough County, Florida in connection with a Low Pressure Sewer System Installations and Repairs contract (WORCS-2) valued at approximately $4,410,000.00. The form requires bidders to identify all registered SBE subcontractors and material suppliers they intend to utilize on the project, including the specific scope of work or work item number and estimated dollar amount for each subcontracted element. The County has established a 5% SBE participation goal for this solicitation. Bidders must ensure that all listed SBEs are registered with Hillsborough County or possess reciprocal eligibility with supporting documentation as specified in the solicitation documents. Failure to complete the SBE-1 form requirements may result in rejection of the entire bid.

The form distinguishes between registered SBE subcontractors performing work and registered SBE material suppliers, which receive partial credit at fifty percent (50%) toward the project's SBE participation goal since they furnish but do not manufacture supplies. Bidders must also list all non-SBE subcontractors and material suppliers with their respective scopes of work and estimated dollar amounts. For work order or term contract solicitations, estimated dollar amounts may be omitted if applicable. This form serves as a critical compliance document in the bid submission process and directly impacts a contractor's eligibility for award consideration under the County's Small Business Encouragement Program.

View the file

Other files

File Type Posted
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
8-Insurance Certificate.doc.doc DOC document
19-IFB-26-00346 LPSS Design Drawings Signed-sealed 12-9-2020.pdf PDF
23-Agreement - Construction - Term Contract.pdf PDF
21-IFB-26-00346 Contract Terms and Conditions.pdf PDF
16-IFB-26-00346 Insurance Requirements.pdf PDF
22-Bid Bond.pdf PDF
24-Payment Bond.pdf PDF
17-IFB-26-00346 Supplemental Specifications.pdf PDF
7-Change Order Form.pdf.pdf PDF
14-Subcontractor Letter of Intent .pdf PDF
20-IFB-26-00346 LPSS Electrical Drawings 10-11-18.pdf PDF
9-Substitute W9 Form.pdf.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
4-Application for Payment.pdf.pdf PDF
10-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
5-Subcontractors Statement of Satisfaction.pdf.pdf PDF
12-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
18-IFB-26-00346 Section 01312 Measurement Payment100%.pdf PDF
15-SBE Goal Participation SBE-1 Form Tutorial.mp4 MP4 file
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
25-Performance Bond.pdf PDF
3-Allowance Authorization Release Form.pdf.pdf PDF
6-Consent of Surety to Final Payment.pdf.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBE – 1 FORM

(Revised 12/2025)

HILLSBOROUGH COUNTY

SMALL BUSINESS ENCOURAGEMENT PROGRAM

SUBCONTRACTORS/MATERIAL SUPPLIERS LIST (SBE-1 FORM)

BID NO.: BIDDER NAME:

List all registered Small Business Enterprise (SBE) subcontractors/material suppliers1 to be utilized on this project.

Include business name, scope of work/work item number to be performed, and estimated dollar amount of each item.

If the solicitation is a “Work Order/Term Contract”, the “Estimated Dollar Amount” may be left blank. All SBEs that are listed as “registered” must either be registered with Hillsborough County or have reciprocal eligibility

(provide supporting documentation) as specifically set forth in the County’s solicitation document.

A Bidders failure to complete the requirements of this page may result in their entire Bid being rejected.

Registered SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated

Dollar Amount

1Material Suppliers: Registered SBE firms that furnish supplies for projects, but do not manufacture the supplies, will be partially credited at fifty percent (50%) towards the project’s SBE participation goal.

List all other subcontracted scopes of work or work item numbers to be performed by non-registered SBE subcontractors/material suppliers on this project and estimated dollar amount of each item:

Non-SBE Subcontractors/Material Suppliers Scope of Work / Work Item Number Estimated

Dollar Amount

File details come from the government source that posted it. Updated .