This document is a Scope of Work for a flooring replacement project at Westlake High School involving the Varsity Weight Room. The project requires complete removal and replacement of existing flooring with high-performance athletic flooring in the lower level of the school, specifically measuring a minimum of 18mm thick and requiring approval from the Athletic Director. The vendor will be responsible for delivery, installation, assembly, and off-premises trash removal, with a preferred completion timeline during December or Christmas break (Dec 19 – Jan 5) and a hard deadline of March 1, 2025. The project includes replacing transitional thresholds between new and existing flooring and collaborative equipment positioning with the school's Athletic Director.

The flooring specifications require RFS Flooring with 18M PUR-bonded SBR granules and EPDM color flecks, meeting stringent performance standards including impact resistance, slip resistance, force reduction, and energy restitution. The flooring must pass specific ASTM testing requirements, with a coefficient of friction >0.95 and a 5-year warranty. Additional project considerations include access during regular business hours, no truck loading dock availability, and the expectation that the vendor will work closely with the school to finalize equipment layout based on site conditions and training needs. Projected machinery layouts for both the upstairs Exercise Room and downstairs Varsity Weight Room are included as reference documents to guide installation.

View the file

Other files

File Type Posted
12-ASD100225DS Description and Scope.pdf PDF
3-Westlake Logo Example2.png PNG image
10-Vendor Prerequisites for RFP.pdf PDF
1-Westlake Logo Example1.png PNG image
5-ASD TERMS AND CONDITIONS 5.9.25.pdf PDF
4-Westlake Logo Example3.png PNG image
9-Schedule C Cost Sheet.xlsx XLSX spreadsheet
2-Westlake Colors.png PNG image
6-Schedule A - Certification of Proposal Form.pdf PDF
8-Schedule C - Cost Evaluation.pdf PDF
7-Schedule B - Technical Criteria.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The floor is to be removed and replaced in the Varsity Weight Room (not including the teacher office). The location is in the lower level of the school.

Vendor is responsible for removal of the existing flooring and installation of new, high-performance athletic flooring, prior to equipment installation. Flooring must be a minimum of 18mm thick and approved by the Athletic Director. Vendor is responsible for replacing or adding transitional thresholds between the new flooring and existing flooring in doorways.

Flooring Specs should meet or exceed these standards.

RFS Flooring 18M PUR-bonded SBR granules and EPDM color flecks

Impact Resistance 14 N/m according to EN1517

Slip Resistance Pass according to ASTM F2772

Force Reduction 19.70% according to ASTM F2772

Energy Restitution 80.20% according to ASTM F2772

Coefficient of Friction >0.95 according to ASTM D2047

Warranty 5 Years

Vendors will be responsible for delivery, installation and assembly, and off premises trash removal.

It is the intent that this project be completed as soon as possible, preferably during December or Christmas break (Dec 19 – Jan 5) when students are not in school, and no later than March 1, 2025.

The building will be available during regular business hours unless otherwise approved by the Athletic Director

There is no truck loading dock at the school

A preferred equipment list and layout has been provided for reference. However, the awarded vendor will be expected to work collaboratively with the Westlake High School Athletic Director to finalize the exact layout and equipment positioning based on site conditions and training needs.

Exercise Room (Upstairs) Projected

Machinery Layout

Varsity Weight Room (Downstairs)

Projected Machinery Layout