10-SENECA PARK TENNIS - drawings.pdf
PDF 3 MB Posted
- Attached to
- Seneca Park Tennis Courts Renovations
- Solicitation number
- RFP260174
- Issued by
- Bath County, Kentucky
About this file
Seneca Park Tennis Courts Renovations - Construction Documents Summary
This is a set of construction drawings and specifications for the Seneca Park Tennis Courts Renovation Project, prepared by Element Site, a landscape architecture and civil engineering firm, for Louisville Metro Parks & Recreation. The project encompasses the renovation of existing tennis courts at 3151 Pee Wee Reese Road, Louisville, Kentucky, on a site totaling 1.41 acres (61,480.50 square feet) within the broader 63.68-acre Seneca Park. The scope of work includes asphalt milling and resurfacing, installation of acrylic sport court surfaces, replacement of vinyl-coated black chain link perimeter and interior fencing, tennis net installation with concrete footings, court striping with blended 36-foot, 60-foot, and 78-foot court configurations for both tennis and pickleball use, concrete sidewalk/pad construction, and comprehensive erosion prevention and sediment control (EPSC) measures. The construction documents consist of multiple sheets including site plans, erosion control plans, site improvements plans, site details, and court striping plans, all prepared for the bid set phase as of November 11, 2025.
The construction drawings specify detailed requirements for surface preparation, materials, and installation standards. The asphalt paving must maintain 3.5% air voids with a dense, smooth finish to prevent surface irregularities, utilizing a two-course system with leveling and surface courses. Court surfacing shall be 100% acrylic sport surface in blue for playing areas and green for out-of-bounds areas, utilizing Sportmaster Sport Surfaces systems or approved equivalents, with all lines painted 2 inches wide (except 3-inch baselines) in white. All fence components, including 4-inch diameter terminal posts, 2.5-inch diameter line posts, and 9-gauge 1.75-inch mesh fabric, must be vinyl-coated black. Tennis net posts require concrete footings with minimum 3,000 PSI strength, and the contractor must implement full EPSC controls including silt fencing, inlet protection, construction entrances, and maintenance logs throughout the construction period until permanent vegetation is established. The contractor is responsible for verifying all utility locations, protecting existing trees and vegetation within the construction limits, and coordinating all activities with Louisville Metro Parks & Recreation prior to work commencement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7-Seneca Form B.pdf | ||
| 14-Submission Instructions - RFP260174.pdf | ||
| 8-Seneca Form C.pdf | ||
| 12-Seneca Bid Form.pdf | ||
| 3-GFE Docs.xlsx | XLSX spreadsheet | |
| 1-VENDOR INFORMATION CREATESUPPLIER02112026REV3.pdf | ||
| 11-Seneca Tennis - BID SET SPECS.pdf | ||
| 4-Acknowledgement Preference (Constr) 1.pdf | ||
| 9-Seneca Form D.pdf | ||
| 6-Seneca Form A.pdf | ||
| 2-Procurement - LMCO ban the box.pdf | ||
| 13-RFP260174 Specifications.pdf | ||
| 5-W9 2024.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER
SCHEDULE OF DRAWINGS
1018 East Jefferson Street, Louisville, KY 40206 | P 502.489.4221 www.element-site.com landscape architecture + civil engineering + planning
CONSULTANTS
Lexington | Louisville | Murray
SENECA PARK TENNIS COURTS
RENOVATION PROJECT
CONSTRUCTION DOCUMENTS
SITE PLAN NOT TO SCALE
Contact: Liz Piper, RLA
CVR COVER & SCHEDULE OF DRAWINGS
L1.0 EROSION PREVENTION & SEDIMENT CONTROL NOTES
L1.1 EROSION PREVENTION & SEDIMENT CONTROL PLAN + SITE DEMOLITION PLAN
L2.0 SITE IMPROVEMENTS PLAN
L3.0 SITE DETAILS
L3.1 COURT STRIPING PLAN
Date:
Drawn by:
Checked by:
Revision:
Revision:
Revision:
Revision:
RE
N
O V
A
TIO
N P
RO
JE
C T
P ee
W ee
R ee se R
D
Lo ui sv ille
, K en tu ck y
Se ne ca P ar k
Te nn is C ou rts so ut h br oa d w ay le xin gt on
, k y p.
.3
.6 f.
9.
9.
e . j ef fe rs on st re et lo ui sv ille
, k y p.
.4
.4 w w w
.e le m en t-s ite
.c om
CVR
BID SET
la nd sc ap e ar ch ite ct ur e+ ci vi l e ng in ee rin g+ pl an ni ng
LOUISVILLE METRO
PARKS & RECREATION
1297 TREVILIAN WAY
LOUISVILLE, KY 40213
YFP
EDP
08-29-2025
11-11-2025 USTA
PEE WEE REESE RD
ROCK CREEK DR
I-64
LEXINGTON RD
C
ANNO
NS LN
G
ARDEN DR
I-64
SENECA GOLF
COURSE
SITE LOCATION MAP
*NOT TO SCALE
PROJECT SITE
ROCK CREEK DR
PEE WEE REESE RD
BEALSBRANCH DR
C
IR
C
LE
H
IL
L D
R
EPSC
NOTESThe new look for Digging Safely in Kentucky
Call 811 Before You Dig.
A. CONTACT MSD INSPECTOR FOR A PRECONSTRUCTION MEETING BEFORE
INSTALLING ANY BMP'S
B. INSTALL & MAINTAIN PERIMETER SILT FENCE IN ACCORDANCE WTIH MSD DWG
EF-09-02 (SEE DETAIL A/L1.0 AND B/L1.0). SILT FENCING SHALL BE INSTALLED PRIOR TO THE
BEGINNING OF GRADING OPERATIONS AND MAINTAINED THROUGHOUT THE
CONSTRUCTION PERIOD UNTIL PERMANENT VEGETATION IS ESTABLISHED. REFER TO PLAN
FOR APPROXIMATE LOCATIONS.
C. WHERE CONSTRUCTION TRAFFIC LEAVES PAVED SURFACES INSTALL & MAINTAIN
CONSTRUCTION ENTRANCES IN ACCORDANCE WITH MSD DWG EF-01-03 (DETAIL D/L7.0).
LIMIT CONSTRUCTION ACCESS TO THE SITE TO THE LOCATION INDICATED AS AN ACCESS
DRIVEWAY.
D. COMMENCE SITE DEMOLITION, GRADING, AND CONSTRUCTION ACTIVITIES.
INSTALL PLANNED SURFACE STABILIZATION FEATURES AS WORK IS COMPLETED.
E. REMOVE ALL TEMPORARY BMP'S UPON FINAL INSPECTION AND APPROVAL BY
GOVERNING AUTHORITIES.
F. INSPECT ALL SEDIMENT CONTROL BMP'S EVERY 7 DAYS AND AFTER EVERY RAINFALL
EVENT GREATER THAN 1/2".
G. ALL SEDIMENT CONTROL BMP'S SHALL BE CLEANED WHEN SEDIMENT REACHES 1/3
THE HEIGHT OF THE STRUCTURE.
EPSC SEQUENCE & SCHEDULE:
Check daily & maintain throughout construction period
Permanent feature.
Maintain until permanent vegetation is established.
Immed. after rough grading, lawn & landcape areas.
Temporary Seeding
Maintain until permanent vegetation is established.
Install at beginning of grading operations.
Silt Fencing and Socks
TIMING / DURATIONCONTROL
BMP SCHEDULE
Rock/Silt Fence Exist. Inlet Protection Maintain until permanent vegetation is established.
Install at beginning of grading operations.
Sod/Seed Immediately after finish grading.
Construction Access Drives
Install at beginning of grading operations.
1. THE APPROVED EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) PLAN SHALL BE IMPLEMENTED PRIOR TO ANY LAND-DISTURBING ACTIVITY ON THE CONSTRUCTION SITE. ANY MODIFICATIONS TO THE APPROVED EPSC PLAN MUST BE REVIEWED AND APPROVED BY MSD'S PRIVATE DEVELOPMENT REVIEW OFFICE. EPSC BMP'S (BEST MANAGEMENT PRACTICES) SHALL BE INSTALLED PER THE PLAN AND MSD
STANDARDS.
2. DETENTION BASINS, IF APPLICABLE, SHALL BE CONSTRUCTED FIRST AND SHALL PERFORM AS SEDIMENT BASINS DURING CONSTRUCTION
UNTIL THE CONTRIBUTING DRAINAGE AREAS ARE SEEDED AND STABILIZED.
3. ACTIONS MUST BE TAKEN TO MINIMIZE THE TRACKING OF MUD AND SOIL FROM CONSTRUCTION AREAS ONTO PUBLIC ROADWAYS. SOIL
TRACKED ONTO THE ROADWAY SHALL BE REMOVED DAILY.
4. SOIL STOCKPILES SHALL BE LOCATED AWAY FROM STREAMS, PONDS, SWALES, AND CATCH BASINS. STOCKPILES SHALL BE SEEDED, MULCHED, AND ADEQUATELY CONTAINED THROUGH THE USE OF SILT FENCE.
5. SEDIMENT-LADEN GROUNDWATER ENCOUNTERED DURING TRENCHING, BORING OR OTHER EXCAVATION ACTIVITIES SHALL BE PUMPED TO A SEDIMENT TRAPPING DEVICE PRIOR TO BEING DISCHARGED INTO A STREAM, POND, SWALE, OR CATCH BASIN.
6. WHERE CONSTRUCTION OR LAND DISTURBING ACTIVITY WILL OR HAS TEMPORARILY CEASED ON ANY PORTION OF A SITE, TEMPORARY SITE STABILIZATION MEASURES SHALL BE REQUIRED AS SOON AS PRACTICABLE, BUT NO LATER THAN 14 DAYS AFTER THE ACTIVITY HAS CEASED.
7. TIE BACK DISTANCES ON SILT FENCE ARE TO BE ADEQUATE TO ALLOW FOR A MINIMUM 2 FEET OF STORAGE.
8. ALL ROADSIDE SWALES / DITCHES AND IMMEDIATE CONTRIBUTING DRAINAGE TO THEM MUST BE STABILIZED AS THE SWALES / DITCHES ARE
BEING CONSTRUCTED TO AVOID SEDIMENT RUNOFF ONTO ADJOINING PROPERTIES.
9. THE EROSION PREVENTION AND SEDIMENT CONTROL DEVICES SHOWN ON THIS PLAN SET ARE INTENDED TO BE THE MINIMUM CONTROL MEASURES. ADDITIONAL EPSC DEVICES MAY NEED TO BE INSTALLED AS NECESSARY BY THE CONTRACTOR TO PREVENT EROSION AND
SEDIMENTATION.
10. AT THE END OF EACH WORKDAY THE SITE SHALL BE CLEANED OF SEDIMENT AND DEBRIS. DISTURBED AREAS SHALL HAVE SILT CONTROL INSTALLED OR SHALL BE STABILIZED SO THAT SEDIMENT WILL NOT GET OFFSITE OR INTO THE STORM SYSTEM DURING A RAIN EVENT.
MSD STANDARD EPSC NOTES:
A. THE EXISTING TOPOGRAPHIC AND SITE INFORMATION SHOWN HAS BEEN PROVIDED FROM A SURVEY BY ENDRIS ENGINEERING, PSC. THIS INFORMATION IS PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR THE ACCURACY
OF THE INFORMATION SHOWN THEREON. CONTRACTOR TO VERIFY ALL INFORMATION SHOWN.
B. THE CONTRACT DRAWINGS SHOW THE APPROXIMATE LOCATION OF EXISTING AND PROPOSED UTILITY LINES. THESE LINES HAVE BEEN IDENTIFIED AND LOCATED AS ACCURATELY AS POSSIBLE USING AVAILABLE INFORMATION. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL ACTUAL UTILITY LOCATIONS AND TAKING ALL DUE CAUTION IN EXCAVATION ACTIVITIES.
C. THE DESIGNATED CONCRETE WASH OUT PIT SHALL BE CLEANED AND ALL CONCRETE AND ASSOCIATED DEBRIS SHALL BE REMOVED AND
HAULED OFF SITE AT THE CONCLUSION OF ALL CONCRETE CONSTRUCTION WORK.
D. STOCKPILED TOPSOIL SHALL BE PROTECTED FROM WIND AND WATER EROSION BY TEMPORARY VEGETATIVE SEEDING. IN ADDITION, PROVIDE SILT FENCING AT THE PERIMETER OF STOCKPILES TO PREVENT SEDIMENT RUNOFF. MAINTAIN VEGETATIVE COVER AND SILT FENCING
UNTIL TOPSOIL STOCKPILES ARE REMOVED.
E. THE CONTRACTOR SHALL OBTAIN A STORM WATER PERMIT / SUBMIT A NOTICE OF INTENT (NOI) TO THE KENTUCKY DIVISION OF WATER AND ANY APPLICABLE PERMITS FROM STATE AND LOCAL GOVERNING AGENCIES. IN ADDITION, THE CONTRACTOR SHALL PROVIDE ALL CONSTRUCTION AND MAINTENANCE SHOWN ON THIS PLAN AS PART OF THE CONTRACT SCOPE OF WORK.
F. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING AN ON SITE MAINTENANCE LOG OF ALL EROSION CONTROL FEATURES AND BMP'S.
DURING THE ENTIRE CONSTRUCTION PERIOD, THE CONTRACTOR'S SUPERINTENDENT OR OTHER DULY AUTHORIZED FIELD REPRESENTATIVE SHALL INSPECT ALL BMP'S AS LISTED IN THE LOG BOOK, NOTE THE CONDITION AND PERFORMANCE OF EACH BMP AND TAKE CORRECTIVE ACTION
FOR EACH BMP AS REQUIRED.
G. BEST MANAGEMENT PRACTICES (BMP) MANUAL: IN ADDITION TO THIS PLAN, THE CONTRACTOR SHALL COMPLY WITH THE MANUAL ENTITLED 'KENTUCKY BEST MANAGEMENT PRACTICES FOR CONSTRUCTION ACTIVITIES,' CURRENT EDITION, PREPARED BY THE KENTUCKY DIVISION OF CONSERVATION AND OF WATER. THE CONTRACTOR SHALL ALSO COMPLY WITH THE KENTUCKY EROSION PREVENTION AND SEDIMENT CONTROL FIELD GUIDE, CURRENT EDITION. THE CONTRACTOR SHALL MAKE APPROPRIATE MODIFICATIONS TO THIS PLAN AS NECESSARY TO ACHIEVE THE PLAN GOAL OF MINIMIZING EROSION AND SEDIMENTATION. ANY SUCH CHANGES ARE SUBJECT TO REVIEW BY THE LANDSCAPE
ARCHITECT.
H. DURING THE CONSTRUCTION PERIOD THE CONTRACTOR WILL PROMPTLY REPAIR, REBUILD, REPLACE, CLEAN OUT OR OTHERWISE MODIFY ANY BMP'S THAT REQUIRE ATTENTION OR THAT DO NOT PERFORM AS REQUIRED. THE CONTRACTOR WILL NOTE IN THE MAINTENANCE LOG
WHAT MAINTENANCE OR RECONSTRUCTION WAS REQUIRED AND ANY ACTION TAKEN.
I. TO REDUCE EROSION, MUD AND DUST FROM EXPOSED SOIL AREAS, TEMPORARY SEEDING SHALL BE DONE ON EXPOSED SOILS. FOR ANY BMP'S THAT DO NOT APPEAR TO PERFORM AS DESIGNED, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER (A/E) FOR REVIEW. IF THE A/E AND OR STATE AND LOCAL GOVERNING AGENCY DETERMINE THAT A BMP NEEDS TO BE REDESIGNED OR REPLACED WITH ANOTHER MORE APPROPRIATE BMP BECAUSE OF ACTUAL FIELD PERFORMANCE OR OTHERWISE, UPON APPROVAL OF THE OWNER, THE A/E WILL MAKE THOSE DESIGN CHANGES AND PROVIDE TO THE CONTRACTOR FOR CONSTRUCTION. IF THIS REQUIRES MEASURABLE ADDITIONAL WORK ABOVE THE
SPECIFIED SCOPE OF WORK, THE CONTRACTOR MAY REQUEST A CHANGE ORDER FOR THE WORK.
J. UPON COMPLETION OF THE PROJECT, AND ONCE FINAL VEGETATIVE COVER HAS BEEN ESTABLISHED TO THE SATISFACTION OF THE A/E THE CONTRACTOR WILL REMOVE ALL BMP'S AND SUBMIT A NOTICE OF TERMINATION (NOT) TO THE DIVISION OF WATER & APPLICABLE STATE
AND LOCAL GOVERNING AGENCIES.
K. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING INLET PROTECTION FOR ALL EXISTING AND PROPOSED STORM STRUCTURES WITHIN THE
LIMIT OF CONSTRUCTION.
L. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACTIVITIES AND AVAILABILITY OF SITE WITH THE OWNER PRIOR TO BEGINNING
WORK AT ANY GIVEN SITE.
M. ALL ROADS AND DRIVES USED TO ACCESS THE SITE SHALL BE KEPT CLEAN AND FREE OF MUD & SILT DURING THE CONSTRUCTION PERIOD.
PERIODIC INSPECTION BY GOVERNING OFFICIALS WILL OCCUR. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING AND MAINTAINING THE
VEHICLE WASH DOWN AREAS INDICATED ON THIS PLAN.
EPSC GENERAL NOTES:
M
IN
NOTES:
INSTALLATION:
1. STONE FILL BAGS SHALL BE WOVEN POLYPROPYLENE BAGS WITH
APPROXIMATE DIMENSION SOF 181
2" BY 28". THE BAGS SHALL BE FILLED 12 TO 23
FULL WITH KTC #57 STONE. TIE THE ENDS OF FILLED BAGS USING EITHER
DRAW STRINGS OR WIRE TIES.
2. INTERWEAVE THE LOOSE ENDS OF THE BAGS SO THAT THE GAPS BETWEEN
BAGS ARE FILLED AND THE ENDS OF THE BAGS ARE SEALED. COMPLETELY
SURROUND THE INLET WITH A MINIMUM OF TWO (2) ROWS OF BAGS TO A
MINIMUM OF 12" IN HEIGHT.
3. INSTALL AT ALL EXISTING STORM INLETS AND OUTLET STRUCTURES AND AT
ALL NEWLY CONSTRUCTED STORM INLETS AND OUTLET STRUCTURES UNTIL
PERMANENT STABILIZATION HAS BEEN ESTABLISHED.
INSPECTION & MAINTENANCE:
1. INSPECTIONS SHOULD BE MADE EVERY SEVEN (7) CALENDAR DAYS AND
WITHIN 24 HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 12" OR
MORE OF PRECIPITATION. ANY NEEDED REPAIRS SHOULD BE HANDLED
IMMEDIATELY.
2. IF SEDIMENT ACCUMULATES, REMOVE IT FROM THE FACE OF THE BAGS
BEFORE IT ACCUMULATES TO A HEIGHT EQUAL TO 13 THE STRUCTURE HEIGHT.
ANY NEEDED REPAIRS SHOULD BE HANDLED IMMEDIATELY. TAKE CARE NOT
TO DAMAGE OR UNDERCUT THE BAGS WHEN REMOVING SEDIMENT.
REMOVE AND REPLACE ANY DAMAGED BAGS AND DISPOSE OF THEM
PROPERLY.
3. STORM DRAIN INLET PROTECTION STRUCTURES SHOULD BE REMOVED ONLY
AFTER THE DISTURBED AREAS ARE PERMANENTLY STABILIZED. REMOVE ALL
CONSTRUCTION MATERIAL AND SEDIMENT AND DISPOSE OF THEM
PROPERLY.
4. GRADE THE DISTURBED AREA TO THE ELEVATION OF THE DROP INLET
STRUCTURE CREST. USE APPROPRIATE PERMANENT STABILIZATION METHODS
TO STABILIZE BARE AREA AROUND THE INLET.
18 1/2" x 28" WOVEN
POLYPROPYLENE BAGS - FILL
1/2 - 2/3 FULL W/ #57 STONE
SURROUND INLET W/ TWO
COURSES OF BAGS, MIN.
PLAN VIEW
INTERWEAVE BAG ENDS TO
CLOSE GAPS BETWEEN BAGS
AND TO SEAL BAGS
12" HEIGHT REQ. IS WAIVED IN CASES WHERE IT
WILL CAUSE FLOOD DAMAGE IF THE STONE
BAGS ARE OVERTOPPED
ELEVATION VIEW
AVOID DAMAGE TO TREE ROOTS IN WOODLAND AREAS. NOTIFY
OWNER AND LANDSCAPE ARCHITECT IMMEDIATELY OF POTENTIAL
CONFLICTS PRIOR TO INSTALLATION.
NOTES:
1. THE FENCE SHOULD BE PLACED ACROSS THE SLOPE ALONG A LINE OF UNIFORM ELEVATIONS (PERPEDICULAR TO THE DIRECTION OF FLOW). THE FENCE SHOULD BE LOCATED AT LEAST 10 FT FROM THE TOE OF SLOPES TO PROVIDE SEDIMENT STORAGE AND ACCESS FOR MAINTENANCE AND CLEANOUT.
2. A FLAT BOTTOM TRENCH APPROX. 4 INCHES WIDE AND 8 INCHES DEEP, OR V-SHAPED TRENCH 8 INCHES DEEP SHOULD BE EXCAVATED. ON THE DOWN-SLOPE SIDE OF THE TRENCH, DRIVE THE 1.33LBS/LINEAR FT STEEL POSTS AT LEAST 12 INCHES INTO THE GROUND, SPACING THEM NO FURTHER THAN 6 FT APART.
3. POSTS SHOULD BE INSTALLED, WITH 1 TO 2 INCHES OF THE POST PROTRUDING ABOVE THE TOP OF THE FABRIC AND NO MORE THAN 3 FEET OF THE POST SHOULD PROTRUDE ABOVE THE GROUND. THE MINIMUM FENCE HEIGHT ABOVE THE GROUND SHALL BE 18 INCHES. THE MAXIMUM FENCE HEIGHT ABOVE THE GROUND
SHALL BE 24 INCHES.
4. FASTEN THE 6 INCH X 6 INCH 14 GAGE WIRE MESH TO THE UP-SLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1 INCH LONG, TIE WIRES OR
HOG RINGS. EXTEND THE MESH 6 INCHES INTO THE TRENCH.
5. THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL AND CUT TO THE LENGTH OF THE BARRIER TO AVOID THE USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHOULD BE WRAPPED TOGETHER ONLY AT A SUPPORT POST WITH BOTH ENDS SECURELY FASTENED TO THE POST, WITH A MINIMUM 6
INCH OVERLAP.
6. EXTRA-STRENGTH FILTER CLOTH (50 LBS/LINEAR INCH MINIMUM TENSILE STRENGTH) SHALL USE PLASTIC WIRE TIES TO ATTACH THE FABRIC TO THE POST AND WIRE.
EXTEND 12 INCHES OF THE FABRIC INTO THE TRENCH.
7. PLACE THE BOTTOM 12 INCHES OF THE FILTER FABRIC INTO THE 8 INCH DEEP TRENCH, EXTENDING THE REMAINING 4 INCHES TOWARDS THE UP-SLOPE SIDE OF THE
TRENCH AND BACKFILL THE TRENCH WITH SOIL OR GRAVEL AND COMPACT.
INSPECTION & MAINTENANCE:
1. INSPECTIONS SHOULD BE MADE EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24 HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 12" OR MORE OF PRECIPITATION. CHECK FOR AREAS WHERE RUNOFF HAS ERODED A CHANNEL BENEATH THE FENCE, OR WHERE THE FENCE WAS CAUSED TO SAG OR COLLAPSE
BY RUNOFF OVERTOPPING THE FENCE.
2. IF THE FABRIC TEARS, BEGINS TO DECOMPOSE, OR IN ANY WAY BECOMES IN EFFECTIVE, REPLACE THE AFFECTED SECTION OF FENCE IMMEDIATELY.
3. SEDIMENT MUST BE REMOVED WHEN IT REACHES 13 THE HEIGHT OF THE FENCE, ESPECIALLY IF HEAVY RAINS ARE EXPECTED.
4. REINFORCED SILT FENCE SHOULD BE REMOVED 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER TEMPORARY BMPS ARE NO LONGER NEEDED.
TRAPPED SEDIMENT SHOULD BE REMOVED OR STABILIZED ON SITE. DISTURBED AREAS RESULTING FROM FENCE REMOVAL SHALL BE PERMANENTLY STABILIZED.
FABRIC ATTACHMENT DETAIL
FILTER FABRIC
LATH (ATTACH
WITH 1-1/2"
STAPLES)
POST
MAXIMUM SPACING = 6 FT.
SPACING BASED ON LOAD
2" X 2"
HARDWOOD
POSTS
FILTER FABRIC
2" WIDE LATH
BACKFILL TRENCH WITH
COMPACTED EARTH
USE EITHER FLAT-BOTTOM OR
V-BOTTOM TRENCH SHOWN BELOW BURY FABRIC
SILT FENCE INSTALLATION
RUNOFF
18" TO 24"
18" MIN.
FILTER FABRIC
LATH
COMPACTED
EARTH
RUNOFF
8"
FILTER
FABRIC
4"
FLAT BOTTOM TRENCH DETAIL
18" TO 24"
18" MIN.
FILTER FABRIC
LATH
COMPACTED
EARTH
RUNOFF
8"
FILTER
FABRIC
4"
'V' - BOTTOM TRENCH DETAIL
STABILIZED CONSTRUCTION ENTRANCE DETAIL
N.T.S.
D
(MSD STD DWG ER-01-03)
DIVERT ALL SURFACE RUNOFF AND
DRAINAGE FROM THE STONE PAD TO A
SEDIMENT TRAP OR BASIN OR OTHER
SEDIMENT TRAPPING STRUCTURE.
INSTALL A CULVERT PIPE ACROSS
THE ENTRANCE WHEN NEEDED TO
PROVIDE POSITIVE DRAINAGE
COARSE AGGREGATE KTC NO. 3
STONE, 6" MINIMUM DEPTH
6" MIN.
100' MIN.
PUBLIC
ROAD
UNDERLINING GEOTEXTILE FABRIC
NOTES:
1. STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WILL BE LEAVING A
CONSTRUCTION SITE AND MOVING DIRECTLY ONTO A PUBLIC ROAD.
2. IF WASHING IS USED, PROVISIONS MUST BE MADE TO INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFFSITE. WASHDOWN FACILITIES SHALL BE REQUIRED AS DIRECTED BY MSD. WASHDOWN AREAS IN GENERAL MUST BE ESTABLISHED WITH CRUSHED GRAVEL AND DRAIN INTO A SEDIMENT TRAP OR SEDIMENT BASIN.
3. CONSTRUCTION ENTRANCES SHOULD BE USED IN CONJUNCTION WITH THE STABILIZATION OF CONSTRUCTION ROADS
TO REDUCE THE AMOUNT OF MUD PICKED UP BY VEHICLES.
INSTALLATION:
1. REMOVE ALL VEGETATION AND ANY OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA.
2. DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM STONES TO A SEDIMENT TRAP OR BASIN.
3. INSTALL A GEOTEXTILE FABRIC PRIOR TO PLACING ANY STONE.
4. INSTALL A CULVERT PIPE ACROSS THE ENTRANCE WHEN NEEDED TO PROVIDE POSITIVE DRAINAGE.
5. THE ENTRANCE SHALL CONSIST OF KTC #3 STONE WITH A MINIMUM THICKNESS OF 6 INCHES.
6. MINIMUM DIMENSIONS OF THE ENTRANCE SHALL BE 24 FEET WIDE BY 100 FEET LONG, AND MAY BE MODIFIED AS
NECESSARY TO ACCOMMODATE SITE CONSTRAINTS.
INSPECTION & MAINTENANCE:
1. INSPECT ENTRANCES EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24 HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 12 INCH OR MORE OF PRECIPITATION, OR AFTER HEAVY USE. CHECK FOR MUD AND SEDIMENT BUILDUP AND PAD INTEGRITY. MAKE DAILY INSPECTIONS DURING PERIODS OF WET WEATHER. MAINTENANCE IS REQUIRED MORE FREQUENTLY IN WET WEATHER CONDITIONS. RESHAPE THE STONE PAD AS NEEDED FOR DRAINAGE AND RUNOFF
CONTROL.
2. WASH OR REPLACE STONES AS NEEDED AND AS DIRECTED BY THE INSPECTOR. THE STONE IN THE ENTRANCE SHOULD BE WASHED OR REPLACED WHENEVER THE ENTRANCE FAILS TO REDUCE MUD BEING CARRIED OFF-SITE BY VEHICLES.
FREQUENT WASHING WILL EXTEND THE USEFUL LIFE OF STONE.
3. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING.
FLUSHING SHOULD ONLY BE USED WHEN THE WATER CAN BE DISCHARGED TO A SEDIMENT TRAP OR BASIN.
4. REPAIR ANY BROKEN PAVEMENT IMMEDIATELY.
5. INSPECT AND CLEAN SEDIMENT TRAPS IMMEDIATELY FOLLOWING EACH RAINFALL.
6. DISPOSE OF SEDIMENT IN A SUITABLE AREA IN SUCH A MANNER THAT IT WILL NOT ERODE.
7. REMOVE STABILIZED CONSTRUCTION ENTRANCES AS SOON AS THEY ARE NO LONGER NEEDED TO PROVIDE ACCESS TO
THE SITE. BRING THE DISTURBED AREA TO GRADE, AND STABILIZE IT USING APPROPRIATE PERMANENT STABILIZATION
METHODS.
TEMPORARY SILT FENCE
(MSD STD DWG EF-09-02) INLET PROTECTIONN.T.S. A
C
REFER TO EPSC PLANS L1.0 & L1.1
REFER TO EPSC PLANS L1.0 & L1.1
FLOW
FILTER SOCK DETAIL B
NOTES:
1. ENDS OF ROLLS TO BE TURNED SLIGHTLY UPHILL
2. 2" SQ. STAKES SHALL BE MIN. 36" LONG FOR 12" DIA.
ROLL. IF LARGER ROLL, SIZE ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS. STAKES SHALL
NOT EXTEND ABOVE THE ROLL MORE THAN 2".
3. FILL MATERIAL TO MEET FILTREXX SPECIFCATIONS OR
APPROVED EQUAL.
4. WOOD STAKES TO BE LOCATED AT ENDS OF ROLL AND
THEN SPACED AT 10' O.C. OR PER MANUFACTURER.
WOOD STAKE, LOCATE EVERY
10' OR PER MANUFACTURER'S
RECOMMENDATION
IN
M
IN
IM
UM
12" FILTREXX SILTSOXX OR
APPROVED EDQUAL
* TO BE USED IN LIEU OF SILT FENCE WITHIN DRIPLINE OF TREES
NOT TO SCALE
WORK AREA AREA TO BE PROTECTED
* FILTER SOCK TO BE USED IN LIEU OF SILT FENCE WITHIN DRIPLINE OF TREES. SEE DETAIL B/L1.0.
(MSD STD DWG EF-03-02)N.T.S.
REFER TO EPSC PLANS L1.0 & L1.1
Date:
Drawn by:
Checked by:
Revision:
Revision:
Revision:
Revision:
RE
N
O V
A
TIO
N P
RO
JE
C T
P ee
W ee
R ee se R
D
Lo ui sv ille
, K en tu ck y
Se ne ca P ar k
Te nn is C ou rts so ut h br oa d w ay le xin gt on
, k y p.
.3
.6 f.
9.
9.
e . j ef fe rs on st sv ille
, k y p.
.4
.4 w w w
.e le m en t-s ite
.c om
L1.0
BID SET
la nd sc ap e ar ch ite ct ur e+ ci vi l e ng in ee rin g+ pl an ni ng
LOUISVILLE METRO
PARKS & RECREATION
1297 TREVILIAN WAY
LOUISVILLE, KY 40213
YFP
EDP
08-29-2025
11-11-2025 USTA
RO
C
K C
REEK DR
C
IRC
LE HILL RD
PEE WEE REESE RD
SF
SILT FENCING, SEE NOTES AND DETAILS
A&B/L0.0. WHERE SILT FENCING IS
WITHIN THE DRIP LINE OF TREES,
SUBSTITUTE FIBER ROLLS TO MINIMIZE
ROOT DISTURBANCE. KEEP & MAINTAIN
ALL SILT FENCING IN PLACE UNTIL
VEGETATIVE COVER IS ESTABLISHED.
LIMITS OF CONSTRUCTION.
EXISTING IMPERVIOUS SURFACE: 61,480.50 SF / 1.41 ACRES
PROPOSED IMPERVIOUS SURFACE: 61,480.50 SF / 1.41 ACRES
TOTAL AREA OF PARK: 2,774,018.41 SF / 63.68 ACRES
TOTAL AREA OF PROJECT SITE: 61,480.50 SF / 1.41 ACRES
EROSION PREVENTION & SEDIMENT CONTROL + DEMO PLAN
The new look for Digging Safely in Kentucky
Call 811 Before You Dig.
EPSC PLAN +
DEMO
STORMWATER DATA:
15 60
900SCALE 1" = 30'-0"
DRAINAGE DIRECTION
VEHICLE WASH DOWN AREA SEE NOTES
FOR REQUIREMENTS
Date:
Drawn by:
Checked by:
Revision:
Revision:
Revision:
Revision:
RE
N
O V
A
TIO
N P
RO
JE
C T
P ee
W ee
R ee se R
D
Lo ui sv ille
, K en tu ck y
Se ne ca P ar k
Te nn is C ou rts so ut h br oa d w ay le xin gt on
, k y p.
.3
.6 f.
9.
9.
e . j ef fe rs on st sv ille
, k y p.
.4
.4 w w w
.e le m en t-s ite
.c om
L1.1
BID SET
la nd sc ap e ar ch ite ct ur e+ ci vi l e ng in ee rin g+ pl an ni ng
LOUISVILLE METRO
PARKS & RECREATION
1297 TREVILIAN WAY
LOUISVILLE, KY 40213
YFP
EDP
08-29-2025
11-11-2025 USTA
EXISTING TREE TO BE
PROTECTED - SEE NOTES AND
DETAIL A/L1.1 FOR TREE
PROTECTION FENCING
REQUIREMENTS.
MILL EXISTING PAVEMENT,
FULL DEPTH.
EPSC & DEMOLITION LEGEND
CONSTRUCTION ACCESS DRIVE, SEE
NOTES & DETAIL D/L0.0
DEMOLITION NOTES:
A. THE EXISTING TOPOGRAPHIC AND SITE INFORMATION SHOWN HAS BEEN PROVIDED FROM A SURVEY BY
ENDRIS ENGINEERING. THIS INFORMATION IS PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR.
THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION SHOWN
THEREON. CONTRACTOR TO VERIFY ALL INFORMATION SHOWN.
B. THE CONTRACT DRAWINGS SHOW THE APPROXIMATE LOCATION OF EXISTING AND PROPOSED UTILITY LINES. THESE LINES HAVE BEEN IDENTIFIED AND LOCATED AS ACCURATELY AS POSSIBLE USING AVAILABLE INFORMATION. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL ACTUAL UTILITY
LOCATIONS.
C. SAWCUT EDGES OF EXISTING PAVEMENT WHERE NEW PAVEMENT ABUTS AND / OR EXISTING PAVEMENT
IS INDICATED TO BE REMOVED.
D. CONTRACTOR TO PROTECT ALL EXISTING TREES TO REMAIN. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT IF ANY TREES ARE DAMAGED ON OR OFF SITE. NO MATERIALS ARE TO BE STORED UNDER A TREE IN ANY CIRCUMSTANCE. THE CONTRACTOR SHALL MAINTAIN TREE PROTECTION FENCING WHERE INDICATED AND FOR ALL EXISTING TREES WITHIN THE LIMITS OF THE CONSTRUCTION FENCING. TREE PROTECTION FENCING SHALL BE CONSTRUCTED OF SAFETY FENCE WITH STEEL 'T' SECTION FENCE POSTS SPACED AT 6' MAXIMUM; LIMIT OF FENCE TO ALIGN WITH CANOPY / DRIP EDGE OF TREES TO AVOID
DAMAGE TO EXISTING TREES DURING CONSTRUCTION.
E. CONTRACTOR SHALL PROTECT ALL SURROUNDING AREAS. CONTRACTOR SHALL REPAIR ANY DAMAGES TO OFF OR ON SITE PROPERTY THAT IS NOT LISTED TO BE REMOVED AT NO ADDITIONAL COST TO
OWNER.
F. SEE SPECIFICATIONS FOR OTHER DEMOLITION AND SITE CLEARING REQUIREMENTS.
G. CONTRACTOR SHALL PROTECT ALL UTILITY STRUCTURES. ANY DAMAGES TO UTILITIES ON OR OFF SITE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR REPAIR AT NO ADDITIONAL COST TO OWNER.
THE CONTRACTOR SHALL SALVAGE AND REINSTALL ALL EXISTING UTILITY MARKERS IN NEW PAVEMENT.
H. PROTECT ALL EXISTING VEGETATION AND TREE LINES THROUGHOUT CONSTRUCTION; CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ANY EXISTING PLANTINGS DAMAGED BY CONSTRUCTION
ACTIVITIES.
I. EPSC SHALL BE INSTALLED PRIOR TO ANY DEMOLITION OCCURING. REFER TO SHEETS L1.0 THROUGH L1.1.
1. REMOVE ALL EXISTING TENNIS COURT PERIMETER AND INTERIOR FENCING.
2. REMOVE ALL EXISTING TENNIS COURT NETTING AND APPURTENANCES
3. PROTECT EXISTING FURNISHINGS TO REMAIN. IF NECESSARY, REMOVE SITE FURNISHINGS
FOR DURATION OF PROJECT AND REINSTALL UPON COMPLETITION.
4. CONSTRUCTION ACCESS DRIVE, SEE DETAIL D/LX.X
EPSC & DEMOLITION KEYNOTES:
EXISTING UTILITY LEGEND
UNDERGROUND TELEPHONE/CABLE
UNDERGROUND ELECTRIC
CHAIN LINK FENCE
GAS LINE
WATER LINE
SIGNS
SANITARY MANHOLE
STORM MANHOLE
LIGHT POLE (LP)
CLEAN OUT (c/o)
SANITARY SEWER (PER PLAN
- NOT LOCATED)
UNDERGROUND TELEPHONE/CABLE
(PER PLAN NOT LOCATED)
GAS LINE (PER PLAN
- NOT LOCATED)
EXISTING ELECTRICAL BOXES TO
REMAIN. PROTECT IN PLACE DURING
CONSTRUCTION
TREE PROTECTION
N.T.S. A
CROWN DRIP LINE OR OTHER LIMIT OF TREE
PROTECTION AREA. SEE
DEMOLITION PLAN FOR FENCE ALIGNMENT.
4' -0
TREE PROTECTION
FENCE: 4' HIGH
SNOW FENCE ATTACHED TO
STEEL POSTS
INSTALLED AT 8' O.C.
COARSE MULCH.
NOTES:
1. SEE SPECIFICATIONS FOR ADDITIONAL TREE
PROTECTION REQUIREMENTS.
2. NO PRUNING SHALL BE PERFORMED EXCEPT BY
APPROVED ARBORIST.
3. NO EQUIPMENT SHALL OPERATE INSIDE THE
PROTECTIVE FENCING INCLUDING DURING FENCE
INSTALLATION AND REMOVAL.
4. SEE SITE PREPARATION PLAN FOR ANY
MODIFICATIONS WITHIN THE TREE PROTECTION
AREA.
MAINTAIN EXISTING
GRADE WITH THE TREE
PROTECTION FENCE
UNLESS OTHERWISE
INDICATED ON THE PLANS.
540.7
+540.7
+ 541.7
+ 540.7 + 540.7
541.7 +
540.7
540.7 +540.7+
541.7
540.7 +
PEE WEE REESE RD
541.7
541.7
541.7
540.7
540.7
SITE IMPROVEMENTS PLAN
10 40
600SCALE 1" = 20'-0"
SITE IMPROVEMENTS
PLAN
SITE IMPROVEMENTS LEGEND
+93.0
991 PROPOSED CONTOUR
PROPOSED SPOT ELEVATION
DRAINAGE DIRECTION
MATCH EXISTING GRADEME
SITE IMPROVEMENTS KEY NOTES:
SITE IMPROVEMENTS NOTES:
A. THE EXISTING TOPOGRAPHIC AND SITE INFORMATION SHOWN HAS BEEN PROVIDED FROM A
SURVEY BY ENDRIS ENGINEERING. THIS INFORMATION IS PROVIDED FOR THE CONVENIENCE OF
THE CONTRACTOR. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OF THE
INFORMATION SHOWN. CONTRACTOR TO VERIFY ALL INFORMATION SHOWN.
B. DIMENSIONS GIVEN IN RELATIONSHIP TO BUILDINGS OR OTHER SITE ELEMENTS ARE MEASURED PERPENDICULAR FROM THE OUTSIDE FACE OF BRICK, STONE, OR CONCRETE UNLESS OTHERWISE
INDICATED. DIMENSIONS GIVEN AT ROADWAYS ARE FROM FACE OF CURB TO FACE OF CURB
UNLESS OTHERWISE NOTED. DIMENSIONS ARE REFERENCED AT 90° ANGLES UNLESS OTHERWISE
INDICATED. RADII ARE 5’ UNLESS OTHERWISE INDICATED.
C. THE DRAWINGS SHOW THE APPROXIMATE LOCATION OF EXISTING AND PROPOSED UTILITY LINES.
THESE LINES HAVE BEEN IDENTIFIED AND LOCATED AS ACCURATELY AS POSSIBLE USING
AVAILABLE INFORMATION; CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL ACTUAL
LOCATIONS.
D. CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL INVOLVED UTILITY COMPANIES AND
PUBLIC AGENCIES, COORDINATING WITH THEM ALL CONSTRUCTION ACTIVITIES, REQUIRED
PERMITTING, AND VERIFYING ALL SITE UTILITIES PRIOR TO CONSTRUCTION ACTIVITY.
E. PROTECT EXISTING TREES AND ITEMS TO REMAIN WITHIN THE LIMIT OF CONTRACT FROM
DAMAGE DURING CONSTRUCTION UNLESS OTHERWISE INDICATED FOR REMOVAL.
F. PROVIDE EXPANSION JOINTS WHEREVER NEW PAVEMENT ABUTS EXISTING PAVEMENT, BUILDING
FACE, WALL FACE, OR OTHER STRUCTURE.
G. CONTRACTOR SHALL MAINTAIN STORM DRAINAGE SYSTEMS TO FUNCTION THROUGHOUT THE
CONSTRUCTION PERIOD.
H. PROPOSED GRADES SHOWN ARE FINISHED GRADES. ADJUST RIM ELEVATIONS OF ALL EXISTING
STRUCTURES TO MATCH PROPOSED FINISHED GRADES.
I. ALL EXISTING LAWN AREAS DISTURBED BY CONSTRUCTION (INCLUDING GRADING, EARTHWORK, AND SITE UTILITY WORK) ARE TO BE SEEDED UNLESS OTHERWISE INDICATED. EXTEND LIMITS OF SEEDING TO INCLUDE ALL DISTURBED AREAS. SEE SPECIFICATIONS “LAWNS AND GRASSES” FOR
REQUIREMENTS.
PROVIDE EROSION CONTROL BLANKET FOR ALL SEEDED SLOPES 4:1 OR STEEPER. SEE
SPECIFICATIONS SECTION 329200 “TURF AND GRASSES” AND EPSC PLAN FOR REQUIREMENTS.
ALL DRAINAGE SWALES SHALL BE SODDED WITH MIN. 6’ WIDE SOD FOR FULL LENGTH OF SWALE.
J. GRADE ALL NEW PAVEMENTS TO DRAIN. GRADE ALL NEW WALKS AT MAX. 2% CROSS SLOPE.
GRADE ALL NEW WALKS TO MAX. 5% LONGITUDINAL SLOPE UNLESS OTHERWISE NOTED AS
RAMPS.
K. CONTRACTOR SHALL PROVIDE ALL NECESSARY CONTROL POINT, SURVEY, LAYOUT, AND
CONSTRUCTION STAKING FOR CONSTRUCTION PURPOSES.
L. DIGITAL FILES WILL BE PROVIDED TO THE AWARDED CONTRACTOR FOR LAYOUT PURPOSES.
M. REFER TO SPECIFICATIONS / PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS.
N.
Date:
Drawn by:
Checked by:
Revision:
Revision:
Revision:
Revision:
RE
N
O V
A
TIO
N P
RO
JE
C T
P ee
W ee
R ee se R
D
Lo ui sv ille
, K en tu ck y
Se ne ca P ar k
Te nn is C ou rts so ut h br oa d w ay le xin gt on
, k y p.
.3
.6 f.
9.
9.
e . j ef fe rs on st sv ille
, k y p.
.4
.4 w w w
.e le m en t-s ite
.c om
L2.0
BID SET
la nd sc ap e ar ch ite ct ur e+ ci vi l e ng in ee rin g+ pl an ni ng
LOUISVILLE METRO
PARKS & RECREATION
1297 TREVILIAN WAY
LOUISVILLE, KY 40213
YFP
EDP
08-29-2025
11-11-2025 USTA
COURT SURFACING. SEE KEYNOTES AND DETAILS L3.0
NEW FENCING, SEE KEYNOTES 4 & 5
1. MATCH EXISTING GRADES AT PAVEMENT EDGES.
2. REPAIR ALL CRACKS AND INSTALL NEW ASPHALT COURT SURFACE COURSE. SEE STRIPING PLAN L3.1 AND DETAIL H/L3.0. AND SPECIFICATIONS SECTION 321216 ASPHALT PAVING FOR ADDITIONAL
INFORMATION.
3. NEW ACRYLIC SPORT COURT SURFACING SYSTEM. SEE STRIPING PLAN L3.1 AND DETAIL H/L3.0. AND
SPECIFICATIONS SECTION 321823 'SPORT COURT SURFACE' FOR ADDITIONAL INFORMATION.
4. NEW VINYL COATED BLACK CHAIN LINK PERIMETER FENCE. SEE DETAIL B/L3.0. AND SPECIFICATIONS
SECTION 323113 CHAIN LINK FENCES AND GATES FOR ADDITIONAL INFORMATION.
5. NEW VINYL COATED BLACK CHAIN LINK INTERIOR FENCE. SEE DETAIL B/L3.0. AND SPECIFICATIONS
SECTION 323113 CHAIN LINK FENCES AND GATES FOR ADDITIONAL INFORMATION.
6. NEW TENNIS COURT AND NETS. PROVIDE STRIPING AS SHOWN. SEE DETAIL SHEET L3.0 AND STRIPING
PLAN L3.1.
7. PROVIDE 48" OPENING IN PERIMETER FENCE.
A
PP
RO
X.
S
LO
PE
A
PPRO
X. 1%
SLO
PE
A
PP
RO
X.
S
LO
PE
A
PP
RO
X.
S
LO
PE
4 4
6 6 6 6
6 6
6 6
TENNIS COURT ASPHALT MIX SPECIAL NOTES:
1. MAINTAIN 3.5% AIR VOIDS; ENSURE DENSE, SMOOTH FINISH TO PREVENT
IRREGULARITIES TELEGRAPHING THROUGH (BOTH COURSES)
2. SURFACE LAYER: INCREASE TSR >85% FOR LONG-TERM MOISTURE RESISTANCE.
3. QC TESTING: FIELD DENSITY AND SMOOTHNESS SHOULD BE DOCUMENTED
BEFORE SURFACING; DEVIATIONS >¼" OVER 10' SHOULD BE CORRECTED.
4. JOINT CONSTRUCTION: FOLLOW ASBA SECTION 4.3.4 - STAGGER
LONGITUDINAL JOINTS, COMPACT HOT TO HOT, AVOID OVERLAPPING COLD
JOINTS.
5. SURFACE MIX VMA (15.8-17.7%) EXCEEDS ASBA MINIMUM (≥14%); BASE MIX
(13.3%) IS SLIGHTLY LOW BUT ACCEPTABLE.
SURFACE SHALL BE 100% ACRYLIC COLOR SURFACE BY SPORTMASTER OR
APPROVED EQUAL. SEE SPECS.
SITE DETAILS
Date:
Drawn by:
Checked by:
Revision:
Revision:
Revision:
Revision:
RE
N
O V
A
TIO
N P
RO
JE
C T
P ee
W ee
R ee se R
D
Lo ui sv ille
, K en tu ck y
Se ne ca P ar k
Te nn is C ou rts so ut h br oa d w ay le xin gt on
, k y p.
.3
.6 f.
9.
9.
e . j ef fe rs on st sv ille
, k y p.
.4
.4 w w w
.e le m en t-s ite
.c om
L3.0
BID SET
la nd sc ap e ar ch ite ct ur e+ ci vi l e ng in ee rin g+ pl an ni ng
LOUISVILLE METRO
PARKS & RECREATION
1297 TREVILIAN WAY
LOUISVILLE, KY 40213
YFP
EDP
08-29-2025
11-11-2025 USTA
ANOT USED
NTS
"-2
4" (T
YP
15" DIA.
CL CL
NET
LINE
NET
LINE
CENTER STRAP ANCHOR, ALIGN PIN WITH TENNIS NET
CONCRETE FOOTING (BELOW PAVEMENT)
PIPE TYPE CENTER STRAP ANCHOR SET 1/4"
MAX. ABOVE COURT SURFACE
SEE TENNIS COURT PAVEMENT SECTION DETAIL
CONCRETE FOOTING - 3,500 PSI
COMPACTED CRUSHED STONE BASE
PLAN
SECTION
NOTE:
TOP OF THE CONCRETE FOUNDATION SHOULD BE ROUND TO
PREVENT RADIAL CRACKING.
15" DIA. (TYP.)
TENNIS NET CENTER STRAP FN.T.S. ANCHOR FOUNDATION
SECTION - ASPHALT COURT NET EN.T.S. POST FOUNDATION
PLAN - FENCE POST FOUNDATION GN.T.S.
CL
T
EN
N
IS
C O
UR
T
T
EN
N
IS
C O
UR
T
N
ET
6"
30"
TENNIS: 3" DIA. NET POST
PICKLEBALL: 2-5/8" DIA.
NET POST
NET TIGHTENER -
INTERNAL TYPE
NET
COURT PAVEMENT
SEE DETAIL
NET POST SET IN NET POST
MANUFACTURER'S P.V.C.
SLEEVE
6" DIA. P.V.C. PIPE
SLEEVE - GROUT NET
CONCRETE FOOTING
COMPACTED SUBGRADE
NOTE:
TOP OF THE CONCRETE FOUNDATION SHOULD
BE ROUND TO PREVENT RADIAL CRACKING.
P
IC
KL
EB
A
LL
C O
UR
T
CL
NOTE:
ALL TENNIS COURT DIMENSIONS ARE TO THE
CENTERLINE OF FENCE POST.
FENCE FABRIC LINE
FOUNDATION BELOW
PAVING LIMIT
COURT SURFACE
LEVELING COURSE AND ALL-WEATHER
SURFACING TO HERE
12" 2"
P
IC
KL
EB
A
LL
C O
UR
T
SECTION - FENCE POST FOUNDATION CN.T.S.
CONCRETE
FOOTING
6"
BOTTOM TENSION
WIRE
COMPACTED
SUBGRADE
TOP OF FOOTING BELOW
COURT SURFACE
COURT PAVEMENT, SEE
DETAIL
FENCE POST
12"
NOTE:
SLOPE ALL AREAS OUTSIDE FENCE AWAY FROM COURTS.
FENCE FABRIC SHALL BE ON THE COURT SIDE OF FENCE.
EXPANSION JOINT
AND SEALER12"
(TYP.)
NOTES:
1. EXTEND LIMITS OF ASPHALT 12"
FROM THE ℄ OF FENCE POST (TYP.).
2. EXTENDED AREA SHALL BE COATED
THE SAME AS OUT OF BOUNDS
AREAS OF THE PLAYING AREA
(RESURFACER AND COLOR
COATING).
FINISHED GRADE, SEE LAYOUT & MATERIALS PLAN L4.0
SIDEWALK/FENCE POST SECTION DN.T.S. SEE SITE IMPROVEMENTS PLAN
TENNIS COURT PAVEMENT SECTION HN.T.S.
6"
2.
M
IN
D
EP
TH
2"
COMPACTED SUBGRADE
DENSE GRADED AGGREGATE
(D.G.A.) BASE
COMPACTED ASPHALT LEVELING
COURSE
COMPACTED ASPHALT SURFACE
COURSE
LIQUID APPLIED ACRYLIC SURFACE SYSTEM
TENNIS COURT ASPHALT MIX SPECIAL NOTES:
1. MAINTAIN 3.5% AIR VOIDS; ENSURE DENSE, SMOOTH FINISH TO PREVENT
IRREGULARITIES TELEGRAPHING THROUGH (BOTH COURSES)
2. SURFACE LAYER: INCREASE TSR >85% FOR LONG-TERM MOISTURE RESISTANCE.
3. QC TESTING: FIELD DENSITY AND SMOOTHNESS SHOULD BE DOCUMENTED
BEFORE SURFACING; DEVIATIONS >¼" OVER 10' SHOULD BE CORRECTED.
4. JOINT CONSTRUCTION: FOLLOW ASBA SECTION 4.3.4 - STAGGER
LONGITUDINAL JOINTS, COMPACT HOT TO HOT, AVOID OVERLAPPING COLD
JOINTS.
5. SURFACE MIX VMA (15.8-17.7%) EXCEEDS ASBA MINIMUM (≥14%); BASE MIX
(13.3%) IS SLIGHTLY LOW BUT ACCEPTABLE.
SURFACE SHALL BE 100% ACRYLIC COLOR SURFACE BY SPORTMASTER OR
APPROVED EQUAL. SEE SPECS.
SEE SITE IMPROVEMENTS PLAN
1. ALL FENCE MATERIAL TO BE VINYL COATED BLACK. ALL
POSTS, HARDWARE, AND OTHER COMPONENTS SHALL BE
BLACK TO MATCH.
2. FENCE FABRIC SHALL BE INSTALLED ON THE COURT SIDE OF
THE FENCE.
12" (TYP.)
3,000 PSI CONCRETE
FOOTING (TYP.)
'-0
" T
EN
N
IS
30'-0" MAX. (TYP.)
EQUAL 10'-0" MAX. (TYP.) EQUAL 10'-0" MAX. (TYP.)
CHAIN LINK FENCE
9 GA. 1 3/4" MESH
1 5/8" O.D. TOP RAIL
4" O.D. TERMINAL POST
2 1/2" O.D. LINE POST TENSION BAR (TYP.)
TERMINAL POST (TYP.)LINE POST (TYP.)
4' -0
SEE FENCE POST
FOUNDATION DETAIL
4'-0" MIN.
4-3" MIN.
BOTTOM RAIL, KNUCKLED
SELVAGE PROVIDED TOP
AND BOTTOM
CHAIN LINK SPORT COURT PERIMETER FENCE
N.T.S. B
THREAD TENSION BAR
THROUGH FENCE AND
ATTACH TO TERMINAL
POSTS WITH BANDS OF
CLIBPS SPACED 15" MAX.
ON CENTER.
GAPS BETWEEN FENCING,
POST AND GATES MAXIMUM
OF 1-3/4"
SEE COURT PAVEMENT
SECTION DETAIL
VARIES,
SEE PLANS
VARIES,
SEE PLANS
HOLD FENCE 8"
OFF EDGE OF COURT
SEE SITE IMPROVEMENTS PLAN
12" DIA. (TYP.)
COMPACTED SUBGRADE
6" (T
YP
4.5' 27.0' 4.5' 12.0' 4.5' 27.0' 4.5'12.0' 12.0' 12.0' 4.5' 12.0'4.5' 27.0'4.5' 27.0' 4.5' 12.0' 4.5' 27.0' 4.5'
36.0'
13.5' 13.5'
3.0' 3.0'
120.0'
4.0'
TYP.
18.0' 21.0'
21.0' 18.0'
21.0' 21.0'
13.5' 13.5'
12.0'
18'-2"
TO
O
UTSID
E
ED
G E O
F LIN
ES
9.0'
13.5'
TO CL
3.0'
21.0' 78.0'
21.0'
COURT STRIPING
PLAN
Date:
Drawn by:
Checked by:
Revision:
Revision:
Revision:
Revision:
RE
N
O V
A
TIO
N P
RO
JE
C T
P ee
W ee
R ee se R
D
Lo ui sv ille
, K en tu ck y
Se ne ca P ar k
Te nn is C ou rts so ut h br oa d w ay le xin gt on
, k y p.
.3
.6 f.
9.
9.
e . j ef fe rs on st sv ille
, k y p.
.4
.4 w w w
.e le m en t-s ite
.c om
L3.1
BID SET
la nd sc ap e ar ch ite ct ur e+ ci vi l e ng in ee rin g+ pl an ni ng
LOUISVILLE METRO
PARKS & RECREATION
1297 TREVILIAN WAY
LOUISVILLE, KY 40213
YFP
EDP
08-29-2025
11-11-2025 USTA
ABLENDED COURT STRIPING PLAN
1"=20' SEE SITE IMPROVEMENTS PLAN
4" CENTER
MARK(TYP)
COURT LAYOUT AND MATERIALS NOTES:
1. ALL LINES SHALL BE 2 INCHES IN WIDTH, WITH THE EXCEPTION OF THE BASELINE, WHICH SHALL BE 3 INCHES.
2. ALL STRIPES SHALL BE 2” THICK, COLOR TO BE WHITE.
3. THE DISTANCE BETWEEN COURTS AND/OR FENCE SHALL BE 12’-0”.
4. THE COURT SURFACE SHALL BE 100% ACRYLIC SPORT SURFACE OVER ASPHALT, TO INCLUDE SURFACING AND COLOR COATINGS. FINAL LAYOUT OF INNER AND OUTER COATING COLORS AND LINE PAINT TO BE DETERMINED BY SHOP DRAWING SUBMITTALS. THE BASIS OF DESIGN PRODUCT SYSTEM IS SPORTMASTER SPORT SURFACES TENNIS COURT SYSTEM OR EQUAL APPROVED
AT TIME OF BID. ALL PRODUCTS TO BE FROM A SINGLE MANUFACTURER’S LINE.
5. FINAL LAYOUT OF INNER AND OUTER COATING COLORS AND LINE PAINT TO BE DETERMINED BY SHOP DRAWING SUBMITTALS.
SUBMIT SAMPLES FROM MANUFACTURER’S FULL RANGE OF COLOR FOR SELECTION AND APPROVAL BY OWNER AND LANDSCAPE
ARCHITECT.
6. THE COLOR SCHEME SHALL BE BLUE WITHIN THE PLAYING AREA (SUCH AS LATEX-ITE U.S. BLUE OR SEALMASTER BLUE) AND GREEN IN THE OUT-OF-BOUNDS AREA (SUCH AS LATEX-ITE U.S. GREEN OR SEALMASTER FOREST GREEN). PROVIDE COLOR SAMPLES FROM
MANUFACTURER'S FULL RANGE FOR FINAL SELECTION BY OWNER / LANDSCAPE ARCHITECT.
7. SEE SPECIFICATION 32 18 23 ‘TENNIS SURFACE’ FOR ADDITIONAL REQUIREMENTS, INCLUDING TOLERANCES FOR ASPHALT
PAVING.
8. ALL NETS SHALL BE DOUGLAS PREMIER ROUND NET POSTS WITH POLYESTER POWDERCOAT FINISH AND DOUGLAS NETS, OR
APPROVED EQUIVALENT PRODUCTS.
BLENDED COURTS NOTES:
A. BLENDED 36 FOOT AND 60 FOOT TENNIS PLAYING LINES CHALL BE TEXTURED LINE PAINT
WITHIN THE SAME FAMILY AS THE 78 FOOT COURT COLOR.
B. ALL BLENDED 36 FOOT AND 60 FOOT TENNIS PLAYING LINES SHALL TERMINATE 3 INCHES
FROM TEH 78 FOOT COURT LINES.
C. ALL BLENDED 36 FOOT AND 60 FOOT TENNIS PLAYING LINES SHALL BE 1-1/2" WIDE.
D. ALL BLENDED 36 FOOT AND 60 FOOT TENNIS PLAYING LINES SHALL BE MEASURED TO THE
OUTSIDE EDGE OF THE PLAYING LINE, WITH THE EXCEPTION OF THE CENTER LINES WHICH
SHALL BE MEASURED OUT TO CENTER.
E. THE CENTER MARK FOR THE 36 FOOT COURT SHALL BE SET 2 INCHES OFF THE 78 FOOT
COURT DOUBLES SIDELINE AND SHALL BE 2 INCHES LONG BY 1-1/2" WIDE.
36/60 FOOT LINES 60 FOOT LINES 36/60 FOOT LINES
12' TO FENCE OR BETWEEN COURTS (TYP.)
DOUGLAS DPT-37 NET POST (TYP.)
3" BASELINE (TYP.)
36/60 FOOT LINES 60 FOOT LINES 36/60 FOOT LINES
78' COURT NETLINE
60' COURT SINGLES LINE
78' COURT SINGLES LINE
78' COURT SERVICE LINE
4" LONG CENTER MARK FOR 60' COURT
4" LONG CENTER MARK FOR 78' COURT
78' COURT BASELINE
36' COURT SIDELINE
PORTABLE NET LOCATION (BY OTHERS)
2" LONG CENTER MARK FOR 36' COURT
60' COURT SINGLES LINE
78' COURT SINGLES LINE
78' COURT SERVICE LINE
4" LONG CENTER MARK FOR 60' COURT
4" LONG CENTER MARK FOR 60' COURT
2" LONG CENTER MARK FOR 36' COURT
4' GATES, TYP.
4' OPENINGS, TYP.
PORTABLE NET LOCATION (BY OTHERS)
78' COURT BASELINE
36' COURT SIDELINE
78' COURT NETLINE
COURT FENCE SEE DETAIL B/L3.0COURT FENCE SEE DETAIL B/L3.0
COURT FENCE SEE DETAIL B/L3.0
| 2523-Metro Seneca Park PHD-CVR |
| 2523-Metro Seneca Park PHD-L1.0 |
| 2523-Metro Seneca Park PHD-L1.1 |
| 2523-Metro Seneca Park PHD-L2.0 |
| 2523-Metro Seneca Park PHD-L3.0 |
| 2523-Metro Seneca Park PHD-L3.1 |
File details come from the government source that posted it. Updated .