10. Factor 4 Cost Breakdown Worksheet.docx

DOCX document 25 KB Posted

Attached to
Z1DA-- Modernize Elevators P1, P2, S3 & S4, Building 1 | 570-24-801 | Fresno VA Medical Center
Solicitation number
36C26124R0060
Issued by

About this file

This document is a Cost Breakdown Worksheet for Solicitation No. 36C26124R0060, which is a request to modernize elevators P1, P2, S3, and S4 in Building 1 at the Fresno VA Medical Center. The worksheet provides a detailed cost breakdown for various construction divisions, including materials, labor, equipment, and other costs. The total proposal amount is provided at the end of the worksheet.

The related federal contract opportunity is a firm-fixed price requirement with a 365-calendar day period of performance from the notice to proceed. The purpose is to provide all materials, labor, tools, equipment, transportation, supervision, project management, administrative support, and specialized expertise to modernize the traction elevator system, including upgrading the passenger and service elevators to meet specified technical requirements. Proposals are due by August 30, 2024 at 10:00am PT to the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 21.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 36C26124R0060 Attachment - Cost Breakdown Worksheet

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL

Division 01 - General Requirements

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 02 – Existing Conditions
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 07 – Thermal and Moisture Protection
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 09 - Finishes
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 13- Special Construction
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 14- Conveying Equipment
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 26- Electrical
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 27 Communications
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
SUB TOTAL
$
$
$
$
$
Overhead
$
$
$
$
$
Profit
$
$
$
$
$
Bonds and Insurance
$
$
$
$
$
TOTAL Proposal
$
$
$
$
$

*NOTE: All other costs may be included as a separate item and must be specified in this breakdown.