10. Factor 4 Cost Breakdown Worksheet.docx
DOCX document 25 KB Posted
- Attached to
- Z1DA-- Modernize Elevators P1, P2, S3 & S4, Building 1 | 570-24-801 | Fresno VA Medical Center
- Solicitation number
- 36C26124R0060
About this file
This document is a Cost Breakdown Worksheet for Solicitation No. 36C26124R0060, which is a request to modernize elevators P1, P2, S3, and S4 in Building 1 at the Fresno VA Medical Center. The worksheet provides a detailed cost breakdown for various construction divisions, including materials, labor, equipment, and other costs. The total proposal amount is provided at the end of the worksheet.
The related federal contract opportunity is a firm-fixed price requirement with a 365-calendar day period of performance from the notice to proceed. The purpose is to provide all materials, labor, tools, equipment, transportation, supervision, project management, administrative support, and specialized expertise to modernize the traction elevator system, including upgrading the passenger and service elevators to meet specified technical requirements. Proposals are due by August 30, 2024 at 10:00am PT to the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 21.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA- Fire Alarm Work Fresno Elevators_Redacted.pdf | ||
| 36C26124R0060 0002 RFI Responses.docx | DOCX document | |
| CA202400018 8 23 2024.pdf | ||
| RFI Respones Fresno Modernize Elevators.pdf | ||
| FA 3 thru FA 9 Drawings.pdf | ||
| Pre-Proposal Site Visit Sign-in 8 7 24.pdf | ||
| 36C26124R0060 0001 Sign Visit Sign in Sheet.docx | DOCX document | |
| 36C26124R0060_ Solicitation.docx | DOCX document | |
| 6. REQUEST FOR INFORMATION RFI_ FORM Blank.docx | DOCX document | |
| 3. SOW Attach C Elevator As_Builts.pdf | ||
| 2. SOW Attach B Bldg. 1 As-Builts.pdf | ||
| 1. SOW Attach A Specifications.pdf | ||
| 4. Pre-Proposal Site Visit Information.pptx | PPTX presentation | |
| 8. Factor 1 Key Personnel Resumes Evaluation.docx | DOCX document | |
| 7. CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx | DOCX document | |
| 5. DBA WD CA202400018 07 26 2024.pdf | ||
| 9. Factor 3 Past Performance Questionnaire.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 36C26124R0060 Attachment - Cost Breakdown Worksheet
| DESCRIPTION |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
Division 01 - General Requirements
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 02 – Existing Conditions |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 07 – Thermal and Moisture Protection |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 09 - Finishes |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 13- Special Construction |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 14- Conveying Equipment |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 26- Electrical |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division 27 Communications |
| MATERIAL |
| LABOR |
| EQUIPMENT |
| OTHER |
| TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| $ |
| Division Total |
| $ |
| $ |
| $ |
| $ |
| $ |
| SUB TOTAL |
| $ |
| $ |
| $ |
| $ |
| $ |
| Overhead |
| $ |
| $ |
| $ |
| $ |
| $ |
| Profit |
| $ |
| $ |
| $ |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| $ |
| $ |
| $ |
| TOTAL Proposal |
| $ |
| $ |
| $ |
| $ |
| $ |
*NOTE: All other costs may be included as a separate item and must be specified in this breakdown.