1-Proposal 02-KeyPersonnel.docx
DOCX document 43 KB Posted
- Solicitation number
- 26-0125
- Issued by
- Tarrant County, Frankston Town, Texas
About this file
This file is a key personnel proposal template document for the City of Fort Worth's reconstruction project of Bonds Ranch Road from Wagley Robertson to Hawks Landing (CPN 103278). The project involves the reconstruction of an existing two-lane road into a four-lane divided neighborhood connector, including intersection improvements with traffic signals at Wagley Robertson Road and Fossil Springs Drive, extension of Wagley Robertson Road north of Bonds Ranch Road, installation of approximately 5,800 linear feet of storm drain, 750 linear feet of water line (16" and 36"), 350 linear feet of sanitary sewer (12"), major drainage channel grading at outfalls, street lighting, pavement markings, signing, and utility adjustments throughout the corridor. The template requires bidders to identify and provide detailed credentials and experience documentation for key personnel positions including Project Manager, Project Superintendent, Project Quality Control Manager, Project/Field Engineer, Project Safety Manager, and On-Site Representative, along with positions for Paving Superintendent, Water Superintendent, and Traffic Signal Superintendent.
The document functions as a standardized proposal submission template requiring bidders to complete comprehensive experience tables for each key personnel position. For each proposed team member, bidders must provide education credentials, formal training, certifications, years of experience with the offeror and in the specific role, number of similar projects completed, percentage of time available for the project, current project assignments, and up to three previous similar projects with detailed descriptions. Additionally, bidders must provide reference information for each key personnel member, including name, title, organization, contact information, and the candidate's role on the referenced project, with submission indicating approval to contact references.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Proposal 01-ProjectExperience.docx | DOCX document | |
| 7-00 41 01 Bid Proposal Workbook.xlsx | XLSX spreadsheet | |
| 4-Proposal 03-Safety.docx | DOCX document | |
| 5-103278-Bonds Ranch Rd ProjectManual-Final 102 .pdf | ||
| 2-00 11 14 Invitation to Offerors CSP 02.10.2026.pdf | ||
| 8-Submission Instructions - 26-0125.docx | DOCX document | |
| 6-103278-Bonds Ranch Rd Plans-Final 102 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix CSP Proposal Tables Table 6– Proposed Key Personnel Summary
| Position or Role |
| Individual’s Name or Company’s Name |
Project Manager
Project Superintendent
Project Quality Control Manager
Project/Field Engineer (Lead Person or Company Name)
Project Safety Manager
On-Site Representative
Paving Superintendent
Water Superintendent
Traffic Signal Superintendent
Blank: Write-In Additional Personnel
Blank: Write-In Additional Personnel
If Key Personnel are to fulfill more than one of the roles listed above, provide their name next to all roles. Do not leave a role blank.
Table 7 – Experience of Proposed Project Manager Project Manager Credentials
Name of Project Manager
Education
Formal Training Certifications
Experience as a Project Manager
Years of Experience with this Offeror
Years of Experience as Project Manager
Number of Similar Projects as Project Manager
Number of Similar Projects in Other Positions
Number of Projects with the Proposed Team
Percentage of Time Available to Work on This Project
Current Projects
| Name of Project |
| Role/Position on Project |
| Percent of Time Dedicated to Project |
Previous Project Experience
List Up to 3 Similar Projects as a Project Manager or Other Position
Project Number 1
Position or Role
Project Location and Description
Project Number 2
Position or Role
Project Location and Description
Project Number 3
Position or Role
Project Location and Description
Reference Information
Listing names indicates approval to contacting the named individuals as a reference.
Reference Number 1
Name
Title/ position
Organization
Telephone
Project
Candidate role on project
Reference Number 2
Name
Title/ position
Organization
Telephone
Project
Candidate role on project
Table 8 – Experience of Project Superintendent Superintendent Credentials
Name of Superintendent
Education
Formal Training Certifications
Experience as a Superintendent
Years of Experience with this Offeror
Years of Experience as Superintendent
Number of Similar Projects as Superintendent
Number of Similar Projects in Other Positions
Number of Projects with the Proposed Team
Percentage of Time Available to Work on This Project
Current Projects
| Name of Project |
| Role/Position on Project |
| Percent of Time Dedicated to Project |
Previous Project Experience
List Up to 3 Similar Projects as a Superintendent or Other Position
Project Number 1
Position or Role
Project Location and Description
Project Number 2
Position or Role
Project Location and Description
Project Number 3
Position or Role
Project Location and Description
Reference Information
Listing names indicates approval to contacting the named individuals as a reference.
Reference Number 1
Name
Title/ position
Organization
Telephone
Project
Candidate role on project
Reference Number 2
Name
Title/ position
Organization
Telephone
Project
Candidate role on project
Table 9 – Experience of Project Quality Control Manager Project Quality Control Manager Credentials
Name of Quality Control Manager
Education
Formal Training Certifications
Experience as a Quality Control Manager
Years of Experience with this Offeror
Years of Experience as Quality Control Manager
Number of Similar Projects as Quality Control Manager
Number of Similar Projects in Other Positions
Number of Projects with the Proposed Team
Percentage of Time Available to Work on This Project
Current Projects
| Name of Project |
| Role/Position on Project |
| Percent of Time Dedicated to Project |
1.
2.
3.
4.
5.
Previous Project Experience
List Up to 3 Similar Projects as a Quality Control Manager or Other Position
Project Number 1
Position or Role
Project Location and Description
Project Number 2
Position or Role
Project Location and Description
Project Number 3
Position or Role
Project Location and Description
Reference Information
Listing names indicates approval to contacting the named individuals as a reference.
Reference Number 1
Name
Title/ position
Organization
Telephone
Project
Candidate role on project
Reference Number 2
Name
Title/ position
Organization
Telephone
Project
Candidate role on project
Table 10 – Experience of Safety Manager Project Safety Manager Credentials
Name of Safety Manager
Education
Formal Training Certifications
Experience as an Inspector
Years of Experience with this Offeror
Years of Experience as a Safety Manager
Number of Similar Projects as a Safety Manager
Number of Similar Projects in Other Positions
Number of Projects with the Proposed Team
Percentage of Time Available to Work on This Project
Current Projects
| Name of Project |
| Role/Position on Project |
| Percent of Time Dedicated to Project |
Previous Project Experience
List Up to 3 Similar Projects as a Safety Manager or Other Position
Project Number 1
Position or Role
Project Location and Description
Project Number 2
Position or Role
Project Location and Description
Project Number 3
Position or Role
Project Location and Description
Reference Information
Listing names indicates approval to contacting the named individuals as a reference.
Reference Number 1
Name
Title/ position
Organization
Telephone
Project
Candidate role on project
Reference Number 2
Name
Title/ position
Organization
Telephone
Project
Candidate role on project
CITY OF FORT WORTH Bonds Ranch Road from Wagley Robertson to Hawks Landing
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103278
Revised 09/10/2025
File details come from the government source that posted it. Updated .