This is a Statement of Work (SOW) for moving government equipment from two buildings to a renovated facility at Dyess Air Force Base in Abilene, Texas, dated 26 March 2026.
The contractor shall relocate equipment and furniture from Buildings 7233 and 4230 to Building 6015 within five calendar days, with equipment delivery on Day 1, occupant packing completion by Day 3, and contractor move operations on Days 4-5. Items to be moved include 4 cabinets, 61 chairs, 12 couches, 1 credenza, 11 desks, 2 floor lamps, 5 microwaves, 40 monitors, 17 printers, 4 refrigerators, 10 safes, 5 shelves, 10 heavy-duty shredders, 1 large metal cabinet, 10 portable air conditioning units, 8 standing desks, 23 tables, 2 time zone clocks, 5 televisions, wall art, fixtures, area rugs, and 150 boxes of office supplies. The contractor must supply 75 large boxes (18"x18"x24"), 75 medium boxes (18"x18"x16"), and packing materials, provided at least three days before the move. The contractor is responsible for securing, loading, transporting all items following safety guidelines, protecting building structures and parking areas from damage, removing all debris upon completion, and conducting a final joint inspection with the Government Representative and Contracting Officer. Building 7233 and 6015 are two-story structures with multiple stairwells; Building 6015 has an elevator but no loading dock; Building 7233 has no elevator or loading dock; Building 4230 is one-story with no loading dock and is located directly behind Building 6015. The distance between Buildings 7233 and 6015 is 0.5 miles.
The SOW includes comprehensive requirements for safety and health compliance with OSHA standards (29 CFR 1910 and 1926), Texas Workman Compensation laws, and Corps of Engineers Safety Manual 385-1-1. Contractors must obtain advance approval for welding, cutting, or brazing operations via AF Form 592 with 24-hour notice, maintain confined-space permits, and implement fire watch procedures. Government-furnished services include reasonable utilities and work space; use of existing toilet facilities; general security and fire protection; and emergency phone access. Standard working hours are 7:30 AM to 4:30 PM, Monday through Friday, excluding federal holidays, with five calendar days' advance notice required to the Contracting Officer Representative for alternative schedules. Extensive security requirements apply at Dyess AFB, including mandatory identification cards (Dyess Form 173), background checks through the Texas Law Enforcement Terminal System, Trusted Agent sponsorship for day laborers, vehicle identification markings, valid driver's licenses, state registration, vehicle inspection, and current insurance for all contractor vehicles and personnel. All contractor employees must obtain base identification passes prior to work initiation, and all identification must be returned upon contract completion or employee termination; failure to return badges results in withholding of final payment. Contractors must also register in the Emergency Mass Notification System and maintain after-hours contact information for all personnel whose normal place of duty is on the Department of Defense installation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW, 26 March 2026
1. DESCRIPTION OF SERVICES: The contractor shall provide all labor, equipment, tools, packing material, supervision, and all other necessary items to move government equipment, identified below from Bldg.7233 and Bldg. 4230 bldg to 6015 Dyess AFB, TX. The purpose of this move is to relocate to renovated Bldg.
6015.
1.1 The contractor shall mobilize man power & equipment to Dyess Air Force Base in Abilene, TX on a pre-determined date.
1.2 The contractor shall check-in at the Tye Gate and then proceed to Bldg. 7233 and 4230.
1.3 The items to be moved include 4 cabinets, 61 chairs, 12 couches, 1 credenza, 11 desks, 2 floor lamps, 5 microwaves, 40 monitors of varying sizes, 17 printers, 4 refrigerators, 10 safes, 5 shelves, 10 heavy duty shredders, 1 large metal Cabinet, 10 portable a/c units, 8 standing desks, 23 tables, 2 time zone clocks, 5
TVs, multiple miscellaneous wall art and fixtures, area rugs, and 150 boxes of office supplies.
1.4 The contractor shall provide 75 large boxes (18"x18"x24"), 75 medium boxes (18"x18"x16"), paper and tape for the 150 boxes provided. These boxes and materials will be provided at least 3 days in advance of the scheduled move. The occupants of the buildings will pack and label all boxes with room numbers for Bldg. 6015.
1.5 The contractor shall secure load & transport all furniture and equipment to Bldg. 6015 within the base following all applicable safety and transit guidelines. The distance between Bldg. 7233 and 6015 is .5 miles. Both 7233 and 6015 buildings are 2 story with multiple stairwells. Bldg. 6015 has an elevator but no loading dock, Bldg. 7233 has no elevator and no loading dock. Bldg. 4230 is located directly behind Bldg. 6015 and is a one-story building with no loading dock.
1.6 The contractor shall lay appropriate protective materials if needed to protect the existing building, interim building and asphalt in the parking lots. Absolute care will be taken to ensure that newly paved road, parking lot, and thoroughfare adjacent to the building will be kept up to original proceedings. If any tire marks or floor damage is created, the contractor will be liable to fix them prior to closing out the contract.
1.7 The contractor shall remove and clean any debris and refuse left upon completion of the move if any and all pertain to their furnishing of the move from Bldg. 4230 & 7233 to Bldg. 6015.
1.8 The contractor shall have five (5) days to complete all work associated with the contract. Day 1 will begin on the date of supplies delivered, day 3 packing by building occupants will be complete, day 4 and 5 will be contractors move dates to Bldg. 6015
1.9 Upon completion of performance, the contractor shall notify the Government Representative (GR) identified in the contract. The Government Representative will coordinate a final joint inspection and walk-through of all associated buildings (Bldg. 7233, 4230, and 6015) with the contractor and Contracting Officer. The purpose of this inspection is to verify the completion of all work and ensure conformance to all requirements listed within this Statement of Work before final acceptance by the Government.
2. HAZARDOUS CONDITIONS. During the course of performing work under this contract, should the contractor find conditions existing that prevent the performance of task specified; the Contracting Officer shall be immediately notified. A confined-space permit must be obtained through the proper authorities before entering any confined space.
3. GOVERNMENT FURNISHED SERVICES. The Government will provide reasonable utilities and work space for the contractor to perform the requested duties. There are no covered or secure storage areas available.
The contractor will provide all equipment and storage media necessary to perform tasks.
3.1. Toilet Facilities. Use of existing toilet facilities in the immediate work area only will be permitted.
Contractor personnel will ensure facility cleanliness is maintained at all times.
3.2 Security Police and Fire Protection. The government will provide general on-base security police and fire protection service. Security police phone extension is 696-2131 for emergencies, and 696-4100 for routine calls. Fire protection emergency phone is 911 from any on-base phone, 696-2117 from a cell phone.
3.3. Telephone. The government shall not provide telephone services. If available, contractor may use government phones in a case of emergencies or during field and site work. No long distance telephone calls will be authorized.
4. HOURS OF OPERATION. Working hours for the contractor will normally be between the hours of 7:30
AM and 4:30 PM excluding Saturdays, Sundays, and Federal holidays. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must make his/ her request to the Contracting Officer Representative (COR) five (5) calendar days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces. If such force is reasonably available, the COR may authorize the contractor to perform work during periods other than normal duty hours/days.
5. SAFETY AND HEALTH. All holes/pits/trenches/manway openings, etc, that are to be left open shall be surrounded with a 48 inch high mesh fence with highly visible orange plastic coating. The fence shall be securely anchored with tension wires and posts as required to prevent sagging and located a minimum of 3 feet from the opening so as to prevent an individual, should they fall across the fencing, from falling into the opening. Holes shall also be covered, when not being worked in, with three quarter inch plywood or a metal grating that will prevent small children from entering the hole.
5.1. OSHA Requirements. All Contractor operations shall be conducted and performed in accordance with
Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, project identified national standards, military manuals, instructions, pamphlets, standards and handbooks, and with the
Corps of Engineers (COE) Safety Manual 385-1-1, dated 03 Sep 96.
5.2. State Requirements. All companies who conduct business within the state of Texas must, in accordance with Texas Workman Compensation laws (Texas House Bill 62), have an approved company safety policy and an Accident Prevention Plan. The plan, approved by the Texas Workman Compensation Commission
(TWCC), shall be submitted For Information Only (FIO) in accordance with paragraph SUBMITTAL
REQUIREMENTS. In addition to meeting the TWCC requirements; the plan must also include the requirements of COE Safety Manual 385-1-1.
5.3. Welding, Cutting, and Brazing: Contractor shall obtain required advance approval for any process that includes welding, soldering, brazing, cutting with or use of a torch, or any other operation that involves a flame or equipment that produces a high degree of heat. Approval must be requested 24 hours in advance via an AF Form 592. Assigned COR will assist in filling out and processing the AF Form 592 when/if required. Operations shall not commence until the Dyess Fire Department approves the AF Form 592 and assigns a control number. Contractor shall put a fire watch in place and shall have appropriate fire extinguishers on-site at the location of the work. Contractor shall coordinate work start to allow an on-site inspection by Dyess Fire Prevention personnel prior to any portion of the work that requires the AF Form
592.
5. . Confined Space: Contractors shall obtain all necessary approvals and permits for entry into confined space prior to work start.
6. Disposition of Waste, Excess, Scrap, and Salvage Materials. The title to all waste, excess, scrap, and salvage materials generated as a direct result of this contract is vested in the Contractor - unless specifically excepted below.
Further (unless listed below in exceptions), these materials shall be disposed of off the Base by the Contractor in accordance with all applicable Federal, State, and Local Regulations. Following is a list of materials (Exceptions) that will be generated as a result of this contract and shall be turned-into the Government at a location at Dyess AFB designated by the Contracting Officer:
Exceptions: None.
7. Radiation Permits and Authorizations. Contractors contemplating the use of devices containing radioactive materials (i.e., soil moisture/density probes) or non-ionizing radiation producing equipment (radio frequency radiation emitters or lasers) while performing work on this contract must obtain written authorization/permit from the Dyess AFB Radiation Safety Officer (RSO), 7 ADOS/SGGB. To obtain the required authorization permit, an application to bring a radioactive device on Dyess AFB must be forwarded to 7 ADOS/SGGB, 697 Hospital Road, Dyess AFB, TX 79607-1367 (this is mailing address, physical address is 880 Third St.) or (915)696-2325/3289, at least 45 days prior to the anticipated use. Without the proper authorization, Contractors will not be allowed to bring these devices on base. Also, Contractor shall provide Bioenvironmental Engineering (7 ADOS/SGGB) a copy of contractor’s radioactive materials permit and training certificates, if radioactive material will be brought onto Dyess
AFB.
8. Security Requirements
8.1 Levels of Security. Dyess AFB security may be viewed as being one of three broad levels, the level in effect being dependent on the location or AREA of Dyess AFB in question.
8.1.1 The lowest level of security exists in “GENERAL ACCESS” areas. These areas are all of Dyess
AFB outside of the "USAF Controlled" and "USAF Restricted" areas.
8.1.2 “USAF Controlled” access areas are the mid-level security areas. Presence within the
CONTROLLED ACCESS AREA is by authorization; however, the movement of authorized personnel in and out of these AREAS is generally not impeded.
8.1.3 The highest level of security on Dyess AFB is that within the “USAF RESTRICTED AREAS”.
These areas are subdivided to be known as Protection Level 1, 2 or 3 AREAS. Work schedule requests or changes to existing schedules for work to be performed in a “USAF RESTRICTED
AREA” shall be submitted at least 7 calendar days in advance for approval and coordination of
Dyess AFB Security Forces.
8.2 Closed Base. Dyess AFB is considered a closed base. All personnel entering must have specific permission of the installation commander for entry. This permission is granted when a Contractor employee is issued an identification card. The COR shall provide information necessary to obtain identification cards. The contractor shall be responsible to ensure that all of its employees obtain, and keep on their person at all times while working on the base, a USAF identification card. Upon completion of the work or termination of an employee, the contractor shall be responsible for turn in of identification cards to the COR or to the Pass and Registration Office of the Security Forces.
NOTE: Failure to turn in badges will result in WITHHOLDING OF FINAL PAYMENT and revocation of any future badges issued by Pass and Registration Office to the employee and the contractor.
8.3 Dyess Form 173. The Dyess AFB Form 173 is subject to the privacy act of 1974, Authority: 10 U.S.C.
8012 and 5 U.S.C. 552a(b)(7). Disclosure is Mandatory: Failure to provide the information and Social
Security Number (SSN) could result in denied access to the Dyess AFB installation.
8.3.1 Effective 1 Nov 04, a completed signed original Dyess Form 173 (Mar 04) must be delivered to Pass & ID by 0900 on the duty day prior to the desired day of entry onto Dyess AFB. All information on the Dyess Form 173 must be typed and the authorizing signature must be in blue or black ink. Personal information provided on the Dyess Form 173 will be cross-referenced against state and federal criminal databases to identify those individuals possessing outstanding warrants. Those individuals with outstanding warrants will be detained at the
Visitor Control Center on the desired day of entry and turned over to Abilene Police
Department.
8.3.2 The approving authority (individual on the 577) can make “ink changes” in red ink to correct any errors noted on the form. All changes must be initialed by the approval authority.
8.3.3 All Contractor day laborers will be processed via the Texas Law Enforcement Terminal
System (TLETS—police wants/warrants check). At this time, someone with military credentials or a Trusted Agent will physically have to meet them to sponsor them onto the installation. Once it is determined the individual is cleared from any wants or warrants and their state or federal identification is valid, their pass will be issued.
8.3.4 Once the Dyess Form 173 has been vetted through TLETS and checked for errors, the Pass and Registration Section shall issue a Contractor badge utilizing the original Dyess Form 173.
Once a badge is obtained, they need only show the badge at the installation gate for entry onto the installation.
8.3.5 The Dyess Form 173 will be maintained at the VCC for 30 days in order to issue badge credentials. If the Contractor hasn’t requested credentials prior to the 30 days expiration, the form will be void and must be resubmitted if credentials are later requested. After one year on file the expired Dyess Form 173 will be destroyed.
Trusted Agent Letter for Day Labor Requests.
8.4.1 Purpose of Letter: To provide sponsoring authority to specific contractor individuals as identified by their sponsoring agency (7 EMS, Army Corp of Engineers, etc) to sponsor day laborers for one-to-thirty-day periods.
8.4.2.1 The sponsoring agency, in coordination with their contractor, shall identify contractor individuals that require sponsoring/vouching authority. This authority is given to the contractor for the purpose of sponsoring day laborers/job site personnel sub-contracted because of an unexpected or new requirement not previously identified in the current contract. This authority will not be given to contractors for convenience only but should be limited to the smallest group of manager or foreman contractor personnel needed to complete their assigned contract. It is the responsibility of the sponsoring agency to ensure the Trusted Agent Letter remains current. A Trusted Agent must possess a valid driver’s license and have contractor badge credentials issued for a minimum of six weeks. Additionally, all reasonable actions should occur to prevent use of this process when a known laborer/sub-contractor was required well in advance of the day labor/sub-contractor request. (Effective Date: Immediately)
8.4.2.2 The sponsoring agency shall provide this letter to the Pass and Registration Section who will maintain it on file. The Pass and Registration section shall post a copy of the letter at the VCC, as a reference, to verify which contractor personnel have sponsoring/vouching authority
8.5 The Process to get Day Labors/Job Site Personnel Sub-Contracted onto the Installation: The contractor individuals identified in the Trusted Agent Letter will be physically present to sponsor individuals requiring one to thirty days entrance. The VCC clerk will verify the identity of all individuals by checking their valid State/Federal Identification card. The VCC clerk will check 100% of the individuals via the TLETS. Should any individual not possess a valid identification card, they will be turned away at the VCC and entry to the installation denied. All information must be validated by the clerk before the contractor will be allowed to proceed onto the installation with the sponsored individuals.
Should an AF Form 75 be issued, the driver will be required to produce a valid driver’s license, current insurance card, and current registration for the vehicle being operated. Once on the installation, the
Trusted Agent Contractor shall be responsible for the actions of the sponsored individuals. Should an incident occur with a sponsored guest, and negligence be proven on the part of the Trusted Agent
Contractor, their vouching/sponsoring authority will be revoked. The Trusted Agent Letter can be adjusted to add and delete names of Trusted Agent Contractors as needed, as long as the provisions of this paragraph are followed. At no time will the Trusted Agent Contractor depart the installation and leave any of his/her sponsored individuals with another contractor that does not have the same vouching/sponsoring privileges.
8.6 All contractor companies must attend a contractor briefing given by Pass and Registration, who will provide a more detailed explanation regarding contractor badges and their uses. Pass and
Registration reserves the right to not issue a contractor badge due to erroneous information or failure to disclose information on the Dyess Form 173. Any derogatory information received from the background check will result in the non-issuance of the contractor badge.
9. Identification of Contractor Vehicles. Contractor vehicles must be marked on each side with company name with either permanent or semi-permanent/magnetic signage. All contractor vehicles shall enter Dyess AFB via the Tye Gate. Exceptions to Tye Gate are on weekends or between the hours of 1800 – 0630 during the weekdays when the Dyess AFB Main Gate may be used.
10.1 All contractor employees who will be driving a vehicle on Dyess AFB shall have a current driver’s license with them at all times while on Dyess AFB.
10.2 All contractor vehicles to be operated on Dyess AFB will have a valid state registration, vehicle inspection, and insurance. Proof of registration and vehicle insurance must be physically available at all times while the vehicle is on Dyess AFB.
10.3 Any contractor employee who will be operating heavy equipment or specialized equipment that requires a license or certification shall be so licensed/certified with proof presented to the Contracting
Officer’s representative and 7 CES COR prior to work start.
11. Contractor Access to DAF Installations
11.1 The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
11.2 The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate to obtain a vehicle pass.
11.3 During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
11.4 Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
11.5 The contractor shall provide an after-hours contact number or after-hours email in the Emergency Mass Notification System (EMNS) for each of their personnel, whose normal place of duty is on a DoD installation or within a DoD facility. The contractor shall comply with any additional requirements in DAFMAN 10-206 for emergency operational reporting. Foreign Nationals may participate and may remove themselves from the Emergency Mass Notification System at any time. To update information, personnel can access the globe icon on their system desktop screens and choose the “Access Self-Service” option.
11.7 Failure to comply with these requirements may result in withholding of final payment.