1-Cover Page Holladay City Hall VESTIBULE PERMIT (1) (1).pdf

PDF 2 MB Posted

Attached to
NS26-52 City of Holladay - City Hall Remodel Pre-Qualification
Solicitation number
NS26-52
Issued by
Salt Lake County, Hildale City, Utah

About this file

This document is a permit document set for the Holladay City Hall Remodel, involving Holladay Municipal Corporation located at 4580 S. 2300 E. in Holladay, Utah. The project consists of a vestibule addition to the south of the existing City Hall, with revised parking and landscaping at the south end of the building. The permit documents are dated 10.20.2025 and include comprehensive drawing sets covering civil, landscape, architectural, structural, mechanical, plumbing, and electrical plans. The project involves multiple professional consultants, including Process Studio PLLC as the architect, Talisman Civil Consultants as the civil engineer, and several other specialized engineering firms.

The project site is located in a residential area, as shown in the vicinity map, and involves significant site modifications including a new vestibule, revised parking layout, new retaining and landscaping areas, and a new dumpster enclosure. Existing parking areas will be resurfaced according to civil drawings. The comprehensive drawing set (labeled GI002) provides a detailed overview of the project, including a full drawing list with multiple sheets covering every aspect of the renovation. The documents are prepared with professional specifications and include general contractor notes, emphasizing precise architectural and engineering requirements for the municipal building renovation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXISTING CITY

HALL ENTRANCE

N

EXISTING CITY HALL

NEW VESTIBULE

ADDITION

REVISED PARKING LAYOUT

NEW RETAINING AND

LANDSCAPING AREAS

REVISED PARKING LAYOUT &

CURB CUT / ENTRY

NEW DUMPSTER

ENCLOSURE

EXISTING PARKING AREA,

TO BE RESURFACED PER

CIVIL DRAWINGS.

EXISTING PARKING AREA,

TO BE RESURFACED PER

CIVIL DRAWINGS.

Scale

Project Number

Date

Drawn by

Checked by

3055 s. grace street salt lake city, utah 84109 p.801.906.0866 www.processpllc.com

AL

L

ID

EA

S, D

ES

IG

N S, A R

R

AN

G

EM

EN

TS

, A N

D P

LA

N

S

IN

D

IC

AT

ED

O R

R

EP

R

ES

EN

TE

D

IN

T H

IS

D

R

AW

IN

G

A R

E O

W N

ED

B

Y

AN

D T

H E

PO

PE

R

TY

O F

PR

O

C

ES

S

ST

U D

IO

P

LL

C

A N

D W

ER

E

C R

EA

TE

D , E

VO

LV

ED

, A

N D

D

EV

EL

O

PE

D

F O

R U

SE

O

N A

N D

IN

C

O N

N

EC

TI

O

N W

IT

H

T H

IS

S

PE

C

IF

IE

D P

R O

JE

C

T.

N

O N

E O

F

TH

E

ID

EA

S, D

ES

IG

N

S, A

R R

AN

G

EM

EN

TS

, O

R P

LA

N

S

SH

AL

L

BE

U

SE

D

B Y

O R

D

IS

C

LO

SE

D

T O

A N

Y

PE

R

SO

N , F

IR

M

, O R

C O

R

PO

R

AT

IO

N

F O

R A

N Y

PU

R

PO

SE

W H

AT

SO

EV

ER

W

IT

H O

U T

W R

IT

TE

N C

O N

SE

N

T O

F

PR

O C

ES

S

ST

U

D

IO

P

LL

C

W R

IT

TE

N D

IM

EN

SI

O

N S

SH

AL

L H

AV

E

PR

EC

ED

EN

C E

O

VE

R S

C

AL

E D

IM

EN

SI

O

N S.

C O

N

TR

AC

TO

R S

SH

AL

L

VE

R

IF

Y

AN

D B

E R

ES

PO

N

SI

BL

E

FO

R

A

LL

D

IM

EN

SI

O N

S

AN

D C

O N

D

IT

IO

N

S O

N T

H E

JO

B

AN

D

T H

IS

O

FF

IC

E

BE

N O

TI

FI

ED

O

F

AN

Y

VA

R

IA

TI

O

N F

R O

M T

H E

D

IM

EN

SI

O N

S

AN

D C

O N

D

IT

IO

N

S

SH

O W

N B

Y

TH

ES

E

D R

AW

IN

G S.

W

AR

N

IN

G :R

EP

R

O D

U C

TI

O

N H

ER

EO

F

IS

A C

R

IM

IN

AL

O

FF

EN

SE

U

N

AU

TH

O

R

IZ

ED

D

IS

C

LO

SU

R E

M

AY

C O

N

ST

IT

U

TE

T

R

AD

E

SE

C R

ET

M

IS

AP

PR

O

PR

IA

TI

O

N

IN

V

IO

LA

TI

O N

O F

LA

W

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

CIVIL ENGINEER

TALISMAN CIVIL CONSULTANTS, LLC

1588 SOUTH MAIN STREET

SALT LAKE CITY, UTAH 84115

PHONE: 801.743.1300

CONTACT: ANDREW MORAN

EMAIL: andrewm@talismancivil.com

Project Status

STRUCTURAL ENGINEER

WCA STRUCTURAL ENGINEERING

442 NORTH MAIN STREET, SUITE 200

BOUNTIFUL, UT 84010

PHONE: 801-298-1118

CONTACT: CLIFF COLE

EMAIL: cliff.cole@wcaeng.com

MECHANICAL/ELECTRICAL/PLUMBING ENGINEER

ROYAL ENGINEERING

5005 SOUTH 900 EAST

MURRAY, UTAH 84117

PHONE: 801-375-2228

CONTACT: MARK MAKIN / CALVIN BARLOW

EMAIL: mark.makin@royaleng.com calvin.barlow@royaleng.com

LANDSCAPE ARCHITECT

G. BROWN DESIGN INC

678 EAST VINE STREET, SUITE 10

MURRAY, UTAH 84107

PHONE: 801-575-6066

CONTACT: ELIZABETH BEST

EMAIL: lbest@gbrowndesign.com

GEOTECHNICAL ENGINEER

GORDON GEOTECHNICAL ENGINEERING, INC

4426 SOUTH CENTURY DRIVE, SUITE 100

SALT LAKE CITY, UTAH 84123

PHONE: 801-327-9600

CONTACT: PATRICK EMERY

EMAIL: pat@gordongeotech.com

OWNERS:

10.20.2025

12" = 1'-0"

-1 0-

2:

:4

GI002

COVER SHEET - VESTIBULE

ADDITION

22-0044

HOLLADAY CITY

HALL REMODEL

10.20.2025

MDB

DJY

PERMIT DOCUMENTS

HOLLADAY CITY HALL REMODEL

4580 S. 2300 E. HOLLADAY, UT 84117

HOLLADAY MUNICIPAL CORPORATION

PERMIT DOCUMENTS | 10.20.2025

PROJECT INFORMATION:

DRAWING LIST:

VICINITY MAP:

PROJECT OVERVIEW:

PROJECT SITE

GENERAL CONTRACTOR NOTES:

4580 S 2300 E, HOLLADAY, UT 84117

HOLLADAY MUNICIPAL CORPORATION (C/O JARED BUNCH)

TBD

PROCESS STUDIO PLLC

TALISMAN CIVIL CONSULTANTS

GORDON GEOTECHNICAL ENGINEERING

G. BROWN ASSOCIATES

WCA STRUCTURAL ENGINEERING

ROYAL ENGINEERING

VESTIBULE ADDITION TO SOUTH OF EXISTING CITY HALL,

WITH REVISED PARKING AND LANDSCAPING AT SOUTH END

OF BUILDING.

*THIS DRAWING SET TO BE USED IN CONJUNCTION WITH

PRIMARY DRAWING SET ISSUED ON SAME DATE.

PROJECT ADDRESS:

PROJECT OWNER:

GENERAL CONTRACTOR:

ARCHITECT:

CIVIL ENGINEER:

GEOTECHNICAL ENGINEER:

LANDSCAPE ARCHITECT:

STRUCTURAL ENGINEER:

MEP ENGINEER:

PROJECT DESCRIPTION:

E

AS

T

4500 SOUTH

4500 SOUTH

HOLLADAY

BLVDMURRAY

HOLLADAY

ROAD

MURRAY

HOLLADAY

ROAD

SHEET # SHEET NAME

GENERAL

GI002 COVER SHEET - VESTIBULE ADDITION

CIVIL

C100 SITE PLAN

C200 GRADING PLAN

C700 DETAILS

C701 DETAILS

LANDSCAPE

LP-001 OVERALL PLANTING PLAN

LP-101 PLANTING PLAN

LP-501 PLANTING DETAILS

LI-101 IRRIGATION PLAN

LI-501 IRRIGATION DETAILS

LI-502 IRRIGATION DETAILS

ARCHITECTURAL

AE010 CODE ANALYSIS - VESTIBULE ADDITION

AS110 DEMOLITION SITE PLAN - VESTIBULE ADDITION

AS111 ARCHITECTURAL SITE PLAN - VESTIBULE ADDITION

AD110 DEMOLITION PLAN - VESTIBULE ADDITION

AE110 FLOOR PLANS - VESTIBULE ADDITION

AE111 FLOOR PLANS - VESTIBULE ADDITION

AE130 REFLECTED CEILING PLANS - VESTIBULE ADDITION

AE150 FINISH PLANS - VESTIBULE ADDITION

AE210 EXTERIOR VIEWS - VESTIBULE ADDITION

AE211 EXTERIOR ELEVATIONS - VESTIBULE ADDITION

AE310 BUILDING SECTIONS - VESTIBULE ADDITION

AE420 ENLARGED STAIR PLANS - VESTIBULE ADDITION

AE510 DETAILS - VESTIBULE ADDITION

AE511 DETAILS - VESTIBULE ADDITION

AE512 DETAILS - VESTIBULE ADDITION

AE513 DETAILS - VESTIBULE ADDITION

AE610 SCHEDULES & ASSEMBLIES - VESTIBULE ADDITION

STRUCTURAL

S2.0. FRAMING PLANS

S5.0. DETAILS

S5.1. DETAILS

S5.2. DETAILS

MECHANICAL

M001. MECHANICAL NOTES & LEGENDS

M403 MECHANICAL PLANS ADD/ALT SCOPE

M501. MECHANICAL DETAILS

M502. MECHANICAL DETAILS

M601. MECHANICAL SCHEDULES

PLUMBING

P001. PLUMBING NOTES & LEGENDS

P402 PLUMBING PLANS ADD/ALT SCOPE

P501. PLUMBING DETAILS

P601. PLUMBING DETAILS, SCHEDULES & SCHEMATICS

ELECTRICAL

E001. ELECTRICAL COVER SHEET

E002 ELECTRICAL SITE PLAN

E003 PHOTOMETRIC SITE PLAN

E401 ELECTRICAL PLANS ADD/ALT SCOPE

E501. ELECTRICAL DETAILS

E502 ELECTRICAL DETAILS

E601. ELECTRICAL SCHEDULES

E602. ELECTRICAL SCHEDULES

VESTIBULE

ADDITION SET

• THESE PERMIT DOCUMENTS, DATED 10.20.2025, SHALL BE SUBMITTED BY THE

GENERAL CONTRACTOR TO HOLLADAY CITY BUILDING DEPARTMENT FOR

REVIEW AND ISSUANCE OF BUILDING PERMIT. THIS DRAWING SET SUPERSEDES

ALL PREVIOUS DRAWING SETS ISSUED FOR THIS PROJECT. CONSTRUCTION

SHALL BE BASED ON THIS DRAWING SET ALONE.

• THE GENERAL CONTRACTOR SHALL REVIEW THE ENTIRE DRAWING SET AND

PARTICIPATE IN A PRE-CONSTRUCTION CONFERENCE INCLUDING THE

ARCHITECT AND ALL SUBCONTRACTORS PRIOR TO START OF CONSTRUCTION

ACTIVITIES. THE GENERAL CONTRACTOR SHALL PERFORM IN ACCORDANCE

WITH ALL GENERAL NOTES ON SHEET AE001

• THE GENERAL CONTRACTOR SHALL ABIDE BY THE UTAH DIVISION OF AIR

QUALITY REQUIREMENTS AND CONTACT THE UTAH DIVISION OF AIR QUALITY AT

(801) 536-4000.

• PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE GENERAL

CONTRACTOR WILL CONTACT BLUE STAKES AT (800) 662-4111 TO LOCATE

EXISTING IN-GROUND UTILITY LINE LOCATIONS.

• THE GENERAL CONTRACTOR SHALL NOT MAKE FIELD CHANGES TO THE

PROJECT DESIGN WITHOUT CONSULTATION AND APPROVAL BY BOTH THE

OWNER AND ARCHITECT-AND, WHEN REQUIRED, THE STRUCTURAL ENGINEER.

FAILURE TO DO SO MAY COMPROMISE THE PROJECT DESIGN'S CONFORMANCE

WITH BUILDING CODES, ENERGY CODES, OR STRUCTURAL INTEGRITY. THE

GENERAL CONTRACTOR WILL BEAR THE COST OF ANY CORRECTIONS TO

UNAUTHORIZED FIELD CHANGES.

• THE GENERAL CONTRACTOR SHALL CONTACT THE ARCHITECT IMMEDIATELY

WITH ANY QUESTIONS OR REQUESTS FOR INFORMATION AS THEY ARISE, SO

TIMELY RESPONSES CAN BE PROVIDED AND CONSTRUCTION DELAYS AVOIDED.

CONTACT: DWIGHT YEE (607-379-3209, DWIGHT@PROCESSPLLC.COM). DO NOT

CONTACT THE STRUCTURAL ENGINEER DIRECTLY.

• THE GENERAL CONTRACTOR SHALL PROVIDE GUARANTEE OF ALL WORK ON

THE PROJECT TO THE OWNERS FOR A MINIMUM OF 1 YEAR FROM THE DATE OF

SUBSTANTIAL COMPLETION. THE GENERAL CONTRACTOR WILL PROVIDE

WRITTEN WARRANTIES FROM ALL PRODUCT, MATERIAL, AND SYSTEM

MANUFACTURERS FOR ITEMS INSTALLED ON THE PROJECT TO THE OWNERS.

• THE GENERAL CONTRACTOR WILL PROVIDE THE FOLLOWING SUBMITTALS FOR

OWNER AND ARCHITECT REVIEW AND APPROVAL PRIOR TO ORDERING OR

INSTALLATION:

WINDOW SHOP DRAWINGS & PRODUCT DATA (SEE WINDOW SCHEDULE &

NOTES ON SHEET AE601)

EXTERIOR DOOR SHOP DRAWINGS & PRODUCT DATA (SEE DOOR SCHEDULE

& NOTES ON SHEET AE601)

BUILT-IN CASEWORK SHOP DRAWINGS

METAL FABRICATION AND SHOP DRAWINGS

STRUCTURAL STEEL FRAMING

RAILING AND GUARDRAIL SHOP DRAWINGS

SEPARATE PERMITS WILL BE REQUIRED FOR MECHANICAL, ELECTRICAL AND

PLUMBING WORK. THE GENERAL CONTRACTOR WILL DIRECT SUBCONTRACTORS

TO APPLY FOR PERMITS ONCE THE BUILDING PERMIT HAS BEEN ISSUED.

No. Description Date

File details come from the government source that posted it. Updated .