This is a Bidder Q&A Guidance document for the City of Harrisburg, Pennsylvania, outlining procedures for submitting inquiries related to the Fire Station Upgrades project. The Fire Station Upgrades project involves the interior renovation of two Harrisburg Bureau of Fire facilities: Station #1 at 1820 North 6th Street and Station #2 at 140 North 16th Street. The scope of work includes demolition and reconstruction of bunk rooms, restroom/showers, and offices at both stations, along with partitions, doors, interior glazed openings, architectural built-in casework, painting, plumbing fixtures, domestic water and sanitary waste distribution, HVAC redistribution, electrical service redistribution, and interior lighting. The project will proceed with partial owner occupancy, with the city maintaining operations in non-construction areas throughout the construction period. All bidders must submit questions through the PennBid.net platform, with responses provided within 3 to 4 business days where possible. Bidders are encouraged to submit questions early and review all supporting documentation prior to inquiries or site visits.
Bidders submitting questions must adhere to specific formatting requirements, including identification of the relevant bid package reference number, file name or title, and section reference in the subject line. Each inquiry should contain the relevant section or drawing number, a clear and concise question, and supporting information, with bidders required to submit unrelated questions separately to avoid multi-question submissions. The guidance document emphasizes that bidders should thoroughly review all bid documents twice before submitting inquiries and that responses and any resulting addenda will be issued group-wise to all bidders. The document does not address pricing terms, set-asides, funding sources, or contract renewal options, as these details fall outside the scope of the Q&A guidance document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidder Q&A Guidance
Your questions are important to us. To ensure efficient and clear communication during the bidding process, all bidders are required to follow the procedures below when submitting questions.
1. Submitting a Question
All inquiries must be submitted in writing through the designated Q&A platform (PennBid.net)
Bidders are encouraged to read all bid documents twice before submitting inquiries.
Post inquiries as soon as questions arise. Early submission helps ensure timely responses
Responses will be provided within 3 to 4 business days of receipt where possible, though complex questions may require more time if City coordination/clarification is needed.
Bidders should review all documents thoroughly before seeking clarification.
Group unrelated questions separately by subject—avoid multi-question or multi-package inquiries within a single submission.
Responses and any resulting addenda will be issued group-wise to all bidders.
The City may request additional context if a question is unclear or lacks required references.
Bidders should submit inquiries early and often. Do not wait until just before the question deadline to submit.
2. Question Subject Requirements
Each submitted question must include the following information when submitting a question:
Bid Package Reference Number or Name
(e.g., "#4 - Electrical" ")
File Name or Title
(e.g., "Section 260543 - Underground Ducts and Raceways for Electrical Systems.pdf")
Section Reference
(e.g., "Section 2.4.A" or specific drawing/page)
Example Subject:
Bid Package #4 – Electrical – Section 260543_Underground Ducts_and_Raceways – Section 2.4.A
Bidder Q&A Guidance
3. Content of the Question
For clarity, the body of your inquiry should include:
Relevant section, drawing, or page number
A clear and concise question or request for clarification
Any supporting information
Do not submit multiple questions together.
To avoid confusion, the City will not accept or respond to questions posted together.
Thank you for your cooperation. Adherence to these guidelines will ensure a fair and efficient process for all parties.