1-Abington Township EV Charging Stations SSM Project Book Final.pdf

PDF 17 MB Posted

Attached to
Abington Township Electric Vehicle (EV) Charging Stations
Solicitation number
US.234455
Issued by
Montgomery County, Aaronsburg CDP, Pennsylvania

About this file

Abington Township EV Charging Stations Project Summary

This is a Project Manual and contract opportunity document for the Abington Township Electric Vehicle (EV) Charging Stations project in Montgomery County, Pennsylvania. The project involves the installation of five dual Level 2 EV charging stations across three municipal locations: the Township Administration Building (1176 Old York Road), the Free Library (1030 Old York Road), and Crestmont Park (2595 Rubicam Avenue). The mandatory pre-bid conference is scheduled for 10:00 AM EST on Thursday, May 14, 2026, at the Abington Township Administration Building. Sealed bids will be received electronically via PennBid until 3:00 PM EST on Monday, June 1, 2026. All bidder questions must be submitted electronically via PennBid by noon EST on Thursday, May 28, 2026. The work includes electrical installation with new panel installation, conduit runs, transformer upgrades at applicable locations, pedestal-mounted charging stations with concrete foundations, bollard installations as an alternate, site restoration, and all ancillary electrical and civil work necessary for full operation by December 13, 2026.

The project is funded in part by a Commonwealth of Pennsylvania Alternative Fuels Incentive Grant and the U.S. Department of Energy Energy Efficiency and Conservation Block Grant Program, with Davis-Bacon prevailing wage requirements and certified weekly payroll submissions mandatory. The contractor must have a valid, current SAM number (Unique Entity ID) from the US GSA and comply with all applicable federal, state, and local labor laws. Contract award will be made to the lowest responsive and responsible bidder based on total lump sum price, with the contract period consisting of 90 days for substantial completion and 30 additional days for final completion. Performance and payment bonds equal to the contract price, plus a maintenance bond of 10 percent of the contract price, are required. Liquidated damages are assessed at $500 per day for delays in achieving substantial completion and $100 per day thereafter until final completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .