This is a demolition specifications document and bidding package prepared by The Gateway Engineers, Inc. on behalf of Crafton Borough in Allegheny County, Pennsylvania, administered through the Char-West Council of Governments. The project involves the complete demolition of the residential structure located at 30 Elmwood Street (Lot and Block 39-B-282) in Crafton Borough, including disposal of building contents, removal of foundations and footers, elimination of all trees and vegetation, and site restoration through seeding and mulching. All demolition activities must comply with NESHAP asbestos regulations, and the contractor must treat the entire building as containing asbestos-containing materials. The scope includes disconnection and capping of all utility service lines, erosion and sedimentation controls, removal of concrete floors, sidewalks, bituminous paved areas, and any retaining walls. Sealed bids are to be submitted through PennBid to Char-West Council of Governments by the specified deadline, with bids remaining firm for sixty days. Substantial completion is required by November 1, 2026, after issuance of the Notice to Proceed. A pre-bid conference may be conducted to address bidder questions, with oral statements not binding.
Bidders must submit a ten percent bid bond or certified check as security and provide a single lump-sum price for the complete demolition and restoration work. The successful contractor will be required to furnish a Performance Bond and Payment Bond each equal to 100% of the contract price, along with a Maintenance Bond set at 50% of the final contract value for two years. Comprehensive insurance certificates are mandatory, including workers' compensation at statutory requirements with employer's liability coverage of $1,000,000 per accident, commercial general liability of $2,000,000 general aggregate, business auto liability of $1,000,000, and commercial umbrella liability of $1,000,000. The contract includes liquidated damages of $500 per calendar day for failure to meet the November 1, 2026 completion deadline. Contractors must comply with Pennsylvania prevailing wage requirements, submit five project references with demolition experience, obtain necessary permits from the Allegheny County Health Department and PaDEP, and comply with all applicable federal and state regulations including the Pennsylvania Human Relations Act and Public Works Employment Verification Act requirements using E-Verify.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHAR WEST COUNCIL OF GOVERNMENTS
ALLEGHENY COUNTY
PENNSYLVANIA
CONTRACT DOCUMENTS
FOR:
CD 51
30 Elmwood Street Demolition
Borough of Crafton
The scope of the work consists of the demolition of 30 Elmwood Street in Crafton Borough
Demolition shall include disposal of the structure and the contents, removal of foundations and footers, completion of removal of all trees and vegetation from the lot. Upon completion of the demolition the site shall be restored by seeding and mulching.
C-5667-0038
THE GATEWAY ENGINEERS, INC.
100 McMorris Drive Pittsburgh, PA 15205
412-921-4030 PHONE
412-921-9960 FAX
www.gatewayengineers.com
JUNE 2026 C-5667-0038
DEMOLITION OF 30 ELMWOOD STREET
CRAFTON BOROUGH
Project Directory Copyright © 2026 The Gateway Engineers, Inc. All rights reserved.
00002-1
Project Directory
OWNER: Crafton Borough
100 Stotz Avenue
Pittsburgh, PA 15205
Phone: 412-921-0752
Fax: 412-921-4158
CONTRACT ADMINSTRATOR: Char-West Council of Governments
One Glass Street
Carnegie, PA 15106
Phone: 412-279-3333
ENGINEER: The Gateway Engineers, Inc.
100 McMorris Road
Pittsburgh, PA 15205
Phone: 412-921-4030
Fax: 412-921-9960
Table of Contents
00010-1
TABLE OF CONTENTS
DIVISION 0 - BIDDING DOCUMENTS AND CONTRACT
Introductory Information
00001 – Project Title Page (cover)
00002 – Project Directory
00010 – Table of Contents
Bidding Documents
00100 – Notice to Bidders – Advertisement
00110 – Proposal, Bid Forms and Supplements
00130 – Bid Bond
00180 - Non-Collusion Affidavit
00200 – Instructions to Bidders
00490 – Bidding Addenda
Contract Documents
00510 - Notice of Award
00520 – Agreement
00550 – Notice to Proceed
00605 – Certificate of Liability Insurance
00610 – Performance Bond
00615 – Payment Bond
00620 – Contractors Application for Payment
00700 - General Conditions
00800 – Supplementary Conditions
00830 - Prevailing Wages
00940 – Work Change Directive
00941 – Change Order
00942 – Field Order
DIVISION 1 – GENERAL REQUIREMENTS
01000 – General Project Requirements
01100 – Summary
Price and Payment Procedures
01250 – Contract Modification Procedures
01270 - Unit Prices
01290 - Payment Procedures
Table of Contents
00010-2
Administrative Requirements
01330 - Submittal Procedures
Quality Requirements
01400 - Quality Requirements
Execution Requirements
01700 - Execution Requirements
01770 - Closeout Procedures
DIVISION 2 – SITE CONSTRUCTION
02220 – Traffic Control and Notifications Requirements.
02300 - Earthwork
02221 – Building Demolition
02231 - Tree Protection and Trimming
02630 – Storm Sewer
02920 – Lawns and Grasses
Exhibit One: Photographs and Site Location Maps
Exhibit Two: Asbestos Survey
Notice to Bidders
00100 - 1
NOTICE TO BIDDERS
CHAR-WEST AREA COUNCIL OF GOVERNMENTS
ALLEGHENY COUNTY, PENNSYLVANIA
Sealed Proposals will be received by the CHAR-WEST Area Council of Governments, One
Veterans Way, 15106 for:
Demolition of 30 Elmwood Street , Pittsburgh, PA 15205 – Lot ad Block 39-B-282
Demolition shall include disposal of the structures and their contents, removal of foundations and footers, completion of removal of all trees and vegetation from the lots. Upon completion of the demolition the sites shall be restored by seeding and mulching.
The demolition consists of removal of all above ground structures located on the properties and their respective foundations. All biodegradable and combustible materials generated from the demolition shall be removed and disposed of at an approved offsite facility. In addition, the project shall include the capping and abandonment of all existing utility overhead and buried service lines.
All Proposals will be made through Penn Bid to Char-West Council of Governments, One
Veterans Way, Carnegie, PA 15106, , on the date and specified time .
Performance and Labor and Material Payment Bonds, along with Public Liability and Property
Damage Certificates of Insurance in the amounts specified, as well as Certificates of Workman's
Compensation must be filed with the executed Agreement.
Bids to receive consideration must be accompanied by a Certified Check or Bidder's Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of the CHAR-
WEST Area Council of Governments in an amount equal to ten percent (10%) of the total amount of the Proposal as a guarantee that, if the Proposal is accepted, the successful Bidder will enter into an Agreement within 15 days after Notice of the Award of the Contract.
The Proposals must be made to the CHAR-WEST Area Council of Governments, Allegheny
County, Pennsylvania, and shall remain firm for a period of sixty (60) days. No Bidder may withdraw his Proposal during the sixty (60) day period without forfeiting his Bid guarantee.
The Owner reserves the right to reject any or all Proposals, or any part thereof, for any reason, and also reserves the right to waive any informality therein.
BID AND PROPOSAL FORM
00110 - 1
C-5667-0038
Bid From________________________________________
BID FORM
ARTICLE 1 – BID RECIPIENT
This Bid is submitted to: Char West Council of Governments
One Glass Street
Carnegie, PA 15106
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the
Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
Please note that only essential documents need to be returned with the bid. Technical documents and specifications need not be returned with the bid.
ARTICLE 2 – BID FOR:
The scope of the work consists of the demolition 30 Elmoood Street, Pittsburgh, PA 15205 - Lot and Block 39-B-282 located in the Borough of Crafton.
Demolition shall include disposal of the structure and the contents, removal of the foundation and footer, completion of removal of all trees and vegetation from the lot. Upon completion of the demolition the sites shall be restored by seeding and mulching.
ARTICLE 3 – TIME OF COMPLETION
Bidder agrees that the Work will be completed and ready for final payment in accordance with Paragraph
14.07.B of the General Conditions by November 1, 2026 after the issuance of the Notice to Proceed. All work must be done by November 1, 2026
Bidder accepts the provisions of the Agreement as to liquidated damages in the amount of $500.00 per calendar day in the event of failure to complete the Work within the Contract Times.
ARTICLE 4 – BASIS OF BID
Bidder will complete the Work in accordance with the Contract Documents for the following price(s)
00110 - 2
Item No.
Description
Unit
Qty
Unit Price
Amount
1 Demolition and disposal the following structure:
30 Elmwood Street (Lot and Block 39-B-282)
Due to the condition of the building, the entire building is to be treated as having Asbestos containing materials.
The entire building and the contents must be demolished in accordance with NESHAP Regulation and that the debris be disposed of at a facility that accepts asbestos waste. All
Demolition activities are regulated by Asbestos NESHAP whether or not asbestos-containing materials are present.
All biodegradable materials generated from the demolition shall be removed and disposed of at an approved offsite facility. In addition, the project shall include the capping and abandonment of all existing utility service lines in accordance with the project requirements listed in Division 2 Site
Construction prepared by the Gateway Engineers. Scope of work will include installation of erosion and sedimentation controls, disconnection of all utilities, capping of the sanitary sewer lateral, removal of all building foundations, removal of the concrete floors, trees, concrete sidewalks, bituminous paved areas, retaining walls, backfill and grading of the site with clean imported fill material graded to the lines and grades of the surrounding existing ground, seeding and mulching, miscellaneous items, protection of existing adjacent structures and traffic control, complete in place.
Contractor must provide to the Allegheny County Health
Department (ACHD) a properly completed Asbestos
Abatement and Demolition/Renovation Notification Form submitted 10 working days before demolition or renovation activity begins, regardless of the ACM quantity. A copy of the report must accompany the Notification Form. A copy of the notification form must be provided to Char-West COG and
Crafton Borough prior to the start of work.
Contractor will be responsible for completion of necessary applications and obtain the required permits from the
Allegheny County Health Department, PaDEP, and All regulatory agencies. Copies of all documentation must be provided to Char-West COG and Crafton Borough.
Each
The award of the contract will be made based on the total of the Base Bid
All bidders must provide a minimum of five (5) references with the submission of their bid on the following summary:
00110 - 3
Reference 1
Contact Company
Phone Number: Email:
Name of Project
Value of Demolition Project
Reference 2
Phone Number: Email:
Reference 3
Phone Number: Email:
00110 - 4
Reference 4
Phone Number: Email:
Reference 5
Phone Number: Email:
The successful bidder must follow all contract requirements regarding bonding and insurance. The
Char-West Council of Governments will not accept cash posted in lieu of bonds and insurance. If the bidder cannot secure the necessary documentation from a surety company who can conduct business in Pennsylvania, the bid will be rejected, and the next bidder will be awarded the contract.
Contractors who are not able to adhere to this should consider not bidding on the project. There will not be any refund for the return of bidding documents.
ARTICLE 5 – BIDDER'S ACKNOWLEDGEMENTS
1.01 Bidder accepts all the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period that Bidder may agree to in writing upon request of Owner.
ARTICLE 6 – BIDDER'S REPRESENTATIONS
2.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.
A. Addendum No. Addendum Date
00110 - 5
B. The Bidder has visited the Site and become familiar with and is satisfied to the general, local and Site conditions that may affect cost, progress, and performance of the Work.
C. The bidder is familiar with and is satisfied to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the
Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by
Bidder, and safety precautions and programs incident thereto.
E. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
F. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
G. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding
Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by
Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
J. Bidder will submit written evidence of its authority to do business in the state where the Project is located not later than the date of its execution of the Agreement.
K. The bidder acknowledges that in the event of any conflict between the plans and written specifications that the more stringent interpretation shall apply.
ARTICLE 7 – FURTHER REPRESENTATIONS
3.01 Bidder further represents that:
(a) This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation;
(b) Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
(c) Bidder has not solicited or induced any individual or entity to refrain from bidding; and
(d) The Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
00110 - 6
ARTICLE 8 – ATTACHMENTS TO THIS BID
The following documents are attached to and made a condition of this Bid:
(a) Required Bid security in the form of a Surety Company Bond in the amount of 10% in favor of the Char-West Council of Governments as a proposal deposit which, it is understood, will be forfeited in case of failure to comply with the requirements and provisions of this proposal.
(b) List of Proposed Subcontractors
(c) List of Proposed Suppliers
(d) Affidavit of Non-Collusion
(e) Qualification Data
(f) Public Works Employment Verification Form
ARTICLE 9 – DEFINED TERMS
4.01 The terms used in this Bid with initial capital letters have meanings stated in the Instruction to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 10 – BID SUBMITTAL
If Bidder is:
An Individual
Name (typed or printed): _____________________________________________________
By: ______________________________________________________________ (SEAL)
(Individual’s signature)
Attest: __________________________________________________________
A Partnership
Partnership Name: __________________________________________________ (SEAL)
By: ______________________________________________________________________
(Signature of general partner -- attach evidence of authority to sign)
Name (typed or printed): _____________________________________________________
Attest: __________________________________________________________
A Corporation
Corporation Name: __________________________________________________ (SEAL)
State of Incorporation: _________________________________
Type (General Business, Professional, Service, Limited Liability): _____________________
By: _______________________________________________
(Signature -- attach evidence of authority to sign)
00110 - 7
Name (typed or printed): ______________________________
Title: _____________________________________________ (CORPORATE SEAL)
Attest _____________________________________________
Date of Authorization to do business in _________________________ is ____/____/____.
Bidder's Business Address _____________________________________________________
Phone No. _________________________ Fax No. _____________________________
SUBMITTED on ________________________, 20____.
PENAL SUM FORM
Bid Bond EJCDC C-430 (2013 Edition)
000130-1
BID BOND
Any singular reference to Bidder, Surety, Owner or other party shall be considered plural where applicable.
BIDDER (Name and Address):
SURETY (Name, and Address of Principal Place of Business):
OWNER (Name and Address):
BID
Bid Due Date:
Description (Project Name— Include Location):
BOND
Bond Number:
Date:
Penal sum $
(Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this
Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal)
Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Note: Addresses are to be used for giving any required notice.
Provide execution by any additional parties, such as joint venturers, if necessary.
Bid Bond EJCDC C-430 (2013 Edition)
000130-2
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be
Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding
Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by
Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from the Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after the Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States
Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
Non Collusion Affidavit Copyright © 2013 The Gateway Engineers, Inc.. All rights reserved.
000180-1
NON_COLLUSION AFFIDAVIT
Contract/Bid No._______________
State of_________________________________:
:s.s.
County of_______________________________:
I state that I am_____________________________________________________________
(Title) of________________________________________________________________________
(Name of my firm) and that I am authorized to make this affidavit on behalf of my firm, and its owners, directors, and officers. I am the person responsible in my firm for the price(s) and the amount of this bid.
I state that:
(1) The price(s) and amount of this bid have been arrived at independently and without consultation, communication or agreement with any other contractor, bidder or potential bidder.
(2) Neither the price(s) nor the amount of this bid, and neither the approximate price(s) nor approximate amount of this bid, have been disclosed to any other firm or person who is a bidder or potential bidder, and they will not be disclosed before bid opening.
(3) No attempt has been made or will be made to induce any firm or person to refrain from bidding on this contract, or to submit a bid higher than this bid, or to submit any intentionally high or noncompetitive bid or other form of complementary bid.
(4) The bid of my firm is made in good faith and not pursuant to any agreement or discussion with, or inducement from, any firm or person to submit a complementary or other noncompetitive bid.
(5) _______________________________________, its affiliate’s subsidiaries, (Name of my firm) officers, directors and employees are not currently under investigation by any governmental agency and have not in the last four years been convicted or found liable for any act prohibited by State or Federal law in any jurisdiction, involving conspiracy or collusion with respect to bidding on any public contract, except as follows:
Non Collusion Affidavit
000180-2
I state that ________________________________understands and acknowledges
(Name of my firm) that the above representations are material important, and will be relied on by
(Name of public entity) in awarding the contract(s) for which this bid is submitted. I understand and my firm understands that any misstatement in this affidavit is and shall be treated as fraudulent concealment from ____________________________________of the true facts relating
(Name of public entity) to the submission of bids for this contract.
(Name)
(Title)
SWORN TO AND SUBSCRIBED
BEFORE ME THIS________DAY
OF____________________20____.
Notary Public My Commission Expires:
(Seal)
Public Works Employment Verification Form
Copyright © 2015 The Gateway Engineers, Inc. All rights reserved.
00190-1
COMMONWEALTH OF PENNSYLVANIA
PUBLIC WORKS EMPLOYMENT VERIFICATION FORM
Date _______________________
Business or Organization Name (Employer)_______________________________________ Address ____________________________________________________________________ City _____________________________________ State___________ Zip Code __________
___Contractor ___ Subcontractor (check one)
Contracting Public Body ______________________________________________________ Contract/Project No __________________________________________________________ Project Description ___________________________________________________________ Project Location _____________________________________________________________
As a contractor/subcontractor for the above referenced public works contract, I hereby affirm that as of the above date, our company is in compliance with the Public Works Employment Verification Act (‘the Act’) through utilization of the federal E‐Verify Program (EVP) operated by the United States Department of Homeland Security. To the best of my/our knowledge, all employees hired post January 1, 2013 are authorized to work in the United States.
It is also agreed to that all public works contractors/subcontractors will utilize the federal EVP to verify the employment eligibility of each new hire within five (5) business days of the employee start date throughout the duration of the public works contract. Documentation confirming the use of the federal EVP upon each new hire shall be maintained in the event of an investigation or audit.
I, _________________________, authorized representative of the company above, attest that the information contained in this verification form is true and correct and understand that the submission of false or misleading information in connection with the above verification shall be subject to sanctions provided by law.
Authorized Representative Signature
Public Works Employment Verification Form
Copyright © 2015 The Gateway Engineers, Inc. All rights reserved.
00190-2
Instructions to Bidders
Copyright © 2013 The Gateway Engineers, Inc. All rights reserved.
00200 – 1
INSTRUCTIONS TO BIDDERS
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
B. Successful Bidder – The lowest, qualified, responsible bidder to whom the Owner (on the basis of Owner’s evaluation as hereinafter provided) makes an award.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents in the number and for the deposit sum, if any, stated in the
Notice to Bidders may be obtained from the Issuing Office. The deposit is non-refundable.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
2.04 During the bidding period, Bidders may be furnished with Addenda for additions to or alterations of the plans or specifications which shall be included in the work covered by the Proposal and become part of the Contract Documents. Such Addenda shall be signed by the Bidder and submitted with the Bid.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within five days of Owner’s request, Bidder shall submit (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:
A. Evidence of Bidder’s authority to do business in the state where the Project is located.
B. Bidder’s state or other contractor license number, if applicable.
C. Subcontractor and Supplier qualification information; coordinate with provisions of Article
12 of these Instructions, “Subcontractors, Suppliers, and Others.”
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
3.05 If the Owner requires pre-qualification for the Project, the Bidder shall include the pre-qualification documentation for himself/herself/theirselves and his/her/their subcontractors and suppliers in the Bid documents.
00200 – 2
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION
OF SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. reports and drawings known to Owner relating to Hazardous Environmental
Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any
Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the
Supplementary Conditions. Bidder is responsible for any interpretation or conclusion
Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and
Engineer by owners of such Underground Facilities, including Owner, or others.
C. No claims for additional compensation will be allowed because of obstructions or conditions on the location of the work which may add to the difficulties or costs of construction, even though such obstructions or conditions are not shown on the Contract Plans. The bidder shall make his own investigation to determine all underground structures and utility lines.
D. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and
Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the
Site, if any, and possible changes in the Contract Documents due to any Hazardous
Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
00200 – 3
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the
Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the
General Conditions indicate, if an Owner safety program exists, it will be noted in the
Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the
Site by Owner or others (such as utilities and other prime contractors) and relates to the
Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
4.06 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given
Engineer written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by Engineer are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
00200 – 4
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to
Technical Data in such reports and drawings;
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by
Bidder; and (3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
and
J. agree that the submission of a Bid will constitute an incontrovertible representation by
Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the
Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 A pre-Bid conference may be held in accordance with the requirements of the Bidding Documents and the Notice to Bidders. Representatives of Owner and Engineer will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
00200 – 5
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of
Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 10 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding
Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the
General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the
Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract
Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the
Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed and ready for final payment are set forth in the Bid Form and in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Project Specifications and Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by
Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received
00200 – 6 by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of
“or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or
Contractor to retain any Subcontractor, Supplier, or other individual or entity against which
Contractor has reasonable objection.
12.02 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after
Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for the Work. If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such
Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating
Bids and making the Contract award.
12.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the
Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then
Bidder may enter the words “No Bid” or “Not Applicable.”
13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature). The corporate address and state of incorporation shall be shown. The corporate seal shall be affixed and attested by the corporate secretary or an assistant corporate secretary.
00200 – 7
13.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature). The official address of the partnership shall be shown below the signature
13.04 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person. The state of formation of the firm and the official address of the firm shall be shown.
13.05 A Bid by an individual shall show the Bidder’s name and official address.
13.06 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.
13.07 All names shall be printed in ink below the signatures.
13.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.09 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
13.10 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 – BASIS OF BID
14.01 Unit Price and Lump Sum
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form. The Proposal may be a combination of unit price and lump sum items.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the
Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
D. The Bid price shall include such amounts as the Bidder deems proper for overhead and profit on account of cash allowances, if any, named in the Contract Documents as provided in
Paragraph 13.02 of the General Conditions.
ARTICLE 15 – SUBMITTAL OF BID
15.01 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the
Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope
00200 – 8 containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.”
15.02 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the
Bidder unopened.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a
Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.
16.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
16.04 To withdraw a Proposal, the Bidder or his agent must personally appear at the office of the Owner with a written request to withdraw his Proposal. At the time set for opening of bids the withdrawn Proposal will be returned unopened to the Bidder. Apparent low Bidders who can prove that clerical or mathematical errors caused their bid to be lower than intended can withdraw their Proposal within two business days from the time of bid opening, in accordance with PA Act
#4 - 1974, without losing their Bid Security; however, any such bidder withdrawing his Proposal will not be permitted…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .