This is an Addendum #1 issued by R.S. Scott Associates, Inc. for the Alcona Community Schools reroofing project in Alpena and Lincoln, Michigan, dated March 19, 2019. The addendum modifies the original plans and specifications for reroofing work at an elementary school and a sugar shack facility. Key modifications include changes to warranty requirements, with the manufacturer's extended warranty now limited to the elementary school only, and the addition of a five-year contractor guarantee for maintaining roofing and flashing in watertight condition post-completion. The addendum clarifies soffit work specifications at the elementary school, specifying that only recessed lighting should be removed and replaced while surface-mounted lighting and electrical receptacle covers are to be removed and reinstalled. Large 13 3/8" x 54" grilles are to be cleaned and adjusted only, while smaller 10" x 24" grilles require removal and replacement.
Additional specifications address valley construction requirements prohibiting open valleys in favor of cut valleys, gutter and downspout installation over the east entrance to the library totaling 30 linear feet, and fascia installation requirements using screws for wood sub-fascia and matching nails for metal fascia. The sugar shack specifications require removal of existing exposed roofing under lean-to porches with new ice and water shield, drip edge, and shingle installation. For roof sections with 2:12 slope, shingles must be installed per manufacturer's instructions with ice and water shield extending two feet inside the exterior wall face. The addendum references Owens Corning Duration and GAF Technical Advisory instructions as acceptable standards, with alternative manufacturers permitted if they offer 2:12 slope installation options excluding felt-based alternatives.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R. S. Scott Associates, Inc. Alcona Community Schools Alpena, Michigan Elementary School and Sugar Shack Reroofing
(989) 354-3178 tel Lincoln, Michigan
(989) 354-3191 fax E-mail: edwardss@rsscott.com
March 19, 2019 RSSA Project Number 1-2159-10
ADDENDUM #1
This addendum is issued for the purpose of modifying and/or clarifying the original plans and specifications and shall take precedence over them.
All work herein shall be in accordance with the original plans and specifications except as specifically noted herein.
This addendum is being distributed by R.S. Scott Associated, Inc.
1. SPECIFICATION SECTION 07311 PAGE 2 1.8 WARRANTY
Omit Paragraph B in its entirety and replace with the following:
Manufacturer’s extended warranty. Provide to the Owner the manufacturer’s standard extended warranty covering materials and labor in the effect of a material defect. THE
EXTENDED WARRANTY IS ONLY REQUIRED FOR THE ELEMENTARY SCHOOL AND
IS NOT REQUIRED FOR THE SUGAR SHACK.
Add Paragraph C:
Guarantee: Upon completion of the work, of this section, and as a condition of its acceptance, the roofing contractor shall provide to the Owner a written guarantee signed by the contractor agreeing to maintain the roofing and flashing in a watertight condition for 5 years following the installation completion without additional cost to the Owner.
2. SPECIFICATIONS TABLE OF CONTENTS
Section 06100 – Rough Carpentry should be added to the table of Contents. The Section is included in the Specification Book.
3. CLARIFICATION SOFFIT AT ELEMENTARY SCHOOL
Recessed lighting in the soffit is the only lighting to be removed and replaced with new. Any surface mounted lighting located on soffit or fascia shall be removed and re-installed.
Electrical receptacle covers shall be removed and re-installed.
The mechanical work is to remove the existing covers (louvers, diffusers, etc.) and replace with new. FOR BIDDING PURPOSES: AS THE LARGE 13 3/8” X 54” GRILLES
APPEAR TO BE IN GOOD CONDITION THEY SHALL ONLY BE CLEANED AND
ADJUSTED AS REQUIRED FOR THE NEW SOFFIT. THE SMALLER GRILLES 10X 24”
SHALL BE REMOVED AND REPLACED WITH NEW. (DIMENSIONS SHALL BE
VERIFIED IN FIELD BY CONTRACTOR)
4. VALLEYS ON THE ELEMENTARY SCHOOL AND SUGAR SHACK
Per the drawings no open valleys are permitted. Cut valleys shall be acceptable.
5. ELEMENTARY SCHOOL
Remove existing and install new Gutter and downspout over the East Entrance to the library. (30 LF OF GUTTER)
6. ELEMENTARY SCHOOL SUB-FASCIA AND METAL FINISH FASCIA
The wood sub-fascia shall be secured with screws. The metal fascia shall be nailed with nails matching the metal fascia. Install metal fascia per industry standards.
7. SUGAR SHACK
The existing roofing that is exposed under the “Lean-to” porches shall be removed as far up as possible (Approximately 1’ from where the joint is) and new ice and water shield, drip edge and shingles installed.
8. SUGAR SHACK
The portions of roof that have only a 2:12 roof shall have shingles installed per the manufacturer’s instructions. Ice and water shield shall still extend to 2’ inside the outside face of the exterior wall. For reference, Owens Corning’s instructions for installation of shingles are included herein along with a GAF Technical advisory. Other manufacturer’s will be allowed provided they have an option for 2:12 slope installation. (if a felt option is among the options allowed by manufacturer, that option shall not be used on this project)
OWENS CORNING DURATION MANUFACTURER’S INSTRUCTIONS
(TOTAL PAGES 10)