05.APPENDIX_E_Cost_Analysis.docx
DOCX document 31 KB Posted
- Solicitation number
- 26RFP19987
- Issued by
- Harding County, South Dakota
About this file
This is a cost analysis appendix for a Data Center Relocation Request for Proposals issued by the State of South Dakota's Infrastructure Resiliency Project. The document establishes the mandatory cost structure and reporting requirements that all vendors must follow when submitting proposals for physical data center hosting services. Vendors are required to provide comprehensive cost analysis documentation using the prescribed Appendix E format, which serves as a mandatory component of any proposal considered for award. The RFP seeks a qualified data center vendor capable of delivering modern, resilient, and secure hosting services to support the State's mission-critical government operations, with emphasis on high availability, physical and environmental protections, and robust cybersecurity alignment.
The cost analysis framework requires vendors to itemize expenses across five primary categories: staffing and professional services (including onboarding, migration, configuration, and ongoing support); travel and expenses, with the State requesting acceptance of South Dakota per diem rates for onsite work; infrastructure, licensing, and recurring service costs presented in both one-time and three-year recurring cost formats; additional optional services and upgrades available for State selection; and a consolidated summary cost table providing a complete three-year financial projection. Vendors must provide detailed, transparent breakdowns of all cost elements, including setup fees, hardware provisions, implementation services, data center hosting and colocation fees, network costs, power and cooling expenses, and physical security services. Any vendor-specific or unlisted cost elements must be clearly identified and aligned with the appropriate cost categories, with incomplete submissions or lack of transparency potentially resulting in proposal disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 04.APPENDIX_D_Qualifications_and_Experience.docx | DOCX document | |
| 06.APPENDIX_F_Evaluation_Criteria.docx | DOCX document | |
| 07.APPENDIX_G_Key_Staff_Resumes_and_References.docx | DOCX document | |
| 02.APPENDIX_B_Security_and_Vendor_Questions_v3-3_Production.docx | DOCX document | |
| 08.Appendix_H_Project_Experience_and_References.docx | DOCX document | |
| 01.BIT_RFP_DataCenter.pdf | ||
| 10.APPENDIX J_Contractor Security Acknowledgement Form 2026.docx | DOCX document | |
| 09.APPENDIX_I_BIT Attachment 1 ITSP v6.0.pdf | ||
| 03.APPENDIX C_Hosting_Requirements.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix E:
Cost Analysis for Data Center Proposal
All respondents must provide a comprehensive cost analysis using the structure outlined in this appendix (Appendix E: Cost Analysis for Data Center Proposal). While respondents are encouraged to include supplemental cost-structure documentation, a fully completed Appendix E is required for a proposal to be considered for the awarded contract.
Any vendor‑specific or otherwise unlisted cost elements not included in this form must be clearly identified within the section to which the cost most closely aligns.
Any lack of transparency or misrepresentation of costs may result in the disqualification of the vendor’s proposal.
1. Staffing and Professional Services Vendors should list all labor resources required to support the proposed data center services, including onboarding, migration, configuration, testing, ongoing support, and optional smart-hands rates.
Instructions to Vendor: Include all roles necessary for the proposed scope of work. Add rows as needed.
| Role |
| Description of Duties |
| Estimated Hours |
| Hourly Rate |
| Extended Cost |
Total Staffing Cost:
2. Travel and Expenses (If Applicable) Travel should be included only if the vendor anticipates onsite work such as discovery, design sessions, migrations, or troubleshooting. The State requests that vendor staff accept South Dakota State per diem rates.
2.1 Travel Costs
| Traveler/Role |
| Purpose of Travel |
| Travel Method |
| Cost per Trip |
| Number of Trips |
| Total Cost |
2.2 Lodging & Per Diem
| Traveler/Role |
| Lodging Rate (per night) |
| Nights |
| Lodging Total |
| Per Diem Rate |
| Days |
| Per Diem Total |
| Combined Total |
Total Travel & Expense Cost:
3. Infrastructure, Licensing, and Recurring Service Costs This section must provide a complete and clearly itemized breakdown of all costs associated with hosting, maintaining, and supporting the systems and monitoring services delivered within the data center environment. Vendors must present costs in a structured and transparent manner so the State can fully understand both the one‑time and ongoing financial commitments tied to the proposed solution.
For all costs, please provide a detailed breakdown.
3.1 One-Time Costs
These may include setup fees, provisioning, hardware (if dedicated equipment is required), or initial licensing.
| Cost Category |
| One-Time Cost |
Setup / Provisioning Fees
Hardware (if applicable)
Implementation / Migration Services
Deprovisioning
Other (Specify)
Total One-Time Cost:
3.2 Recurring Costs
Vendors should provide a three-year operating cost view. Please indicate each item’s typical billing cycle (Monthly, Quarterly, Yearly, Ad Hoc, etc.).
| Cost Category |
| Billing Cycle |
| Year 1 |
| Year 2 |
| Year 3 |
| Total |
Data Center Hosting / Colocation Fees
Network Colocation Fees
Cabling Fees
Physical Security Services (ex. access badges, additional cameras, parking permits, etc.)
Power Usage (if applicable)
Other Recurring Costs
Total Recurring Cost (Years 1-3):
4. Additional Work or Optional Services Vendors may list optional services, upgrades, or additional work that the State may choose to procure but is not included in the base proposal.
Please supply a service catalog for additional services available.
Examples:
· Additional security hardening
· Rapid provisioning or accelerated migration services
· Extended support hours
· Enhanced DR or high availability packages
| Description of Additional Work |
| Cost (One-Time) |
| Annual Cost (If Applicable) |
Power (additional/modification to base costs)
Cooling (additional/modification to base costs)
Optional Service Rates (Compute, Storage, etc.)
Disaster Recovery Location Services
Smart Hand Fees
Other
5. Summary Cost Table A consolidated view of total proposed costs.
5.1 Base Cost Table
| Category |
| Total Cost |
Staffing
Travel & Expenses
One-Time Infrastructure
Recurring Annual Costs (Total of Years 1–3)
Grand Total (3-Year Projection)