This is an Appendix A Capability Form template used by the FAA to assess vendor qualifications for a battery systems procurement. The form requires interested vendors to demonstrate experience and current capabilities across multiple dimensions of battery supply, installation, maintenance, and support services.
Vendors must document three previous contracts (Section A) and three current contracts (Section B) performed within five years, providing detailed information including contract value, period of performance, customer name, point of contact, and work descriptions demonstrating similar size, scope, and complexity to the Draft SOW requirements. Section C requires vendors to confirm capability across eight service categories: Program Management, COTS Battery System supply, Battery System Delivery and Recycling/Disposal, Battery System Replacement, Battery Monitoring System (BMS) Installation and Training, Battery Depot Support, and Technical Support Services. Section D assesses battery technology capabilities across Vented Lead Acid (VLA), Valve Regulated Lead Acid (VRLA), Nickel-Cadmium systems, BMS, Building Ventilation Modifications for hydrogen control, asbestos remediation, and stationary battery string maintenance. Additional sections require vendors to identify manufacturing lead times for routine and urgent projects, disclose subcontractors and teaming arrangements, confirm service delivery capability across nine FAA regional areas (both CONUS and OCONUS), provide warranty approach and procedures for equipment storage and handling, demonstrate asbestos remediation experience, address equipment availability challenges, and submit site survey and technical support examples. The form also solicits vendor feedback on the Draft SOW and requests evaluation of Lithium-ion battery availability as an alternative technology option.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01 Power Systems Battery Replacement IV Draft SOW_06.22.26_C.docx | DOCX document | |
| 02 Draft Attachment J.01 CLIN Structure_06.22.26_C.xlsx | XLSX spreadsheet | |
| 03 Draft Attachment J.02 Equipment Characteristics Revised_06.22.26_C.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
In order to make the best determination, the FAA requires interested vendors to fill out Appendix A addressing the following and per the instructions below:
· Capability Questions start in Block A.
· Interested vendors may reference the same contract, described in Block A Table 1 and Block B Table 2, (A1, A2, A3, B1, B2, B3) for multiple citations.
· Supporting document attachments are permitted, provided they reference the specific contract, described in Block A Table 1 and Block B Table 2, (A1, A2, A3, B1, B2, B3) citation.
· If work was performed on a specific Task Order, cite both the Task Order number and the Base/Parent Contract number.
This form can be completed on government and/or commercial sector projects. Scope may be represented on one contract/project or be represented on separate contract(s)/ project(s) providing same or similar services; within five (5) years of the issuance of the Market Survey.
APPENDIX A
CAPABILITY FORM
Vendor Name: ____________________ A. Describe previous contracts similar in size, scope and complexity to the requirements outlined in the Draft SOW. You must provide detailed information and past performance information for three (3) previous contracts including program title, customer name, project dates, customer point of contact (POC), and description of work performed.
Table 1: Previous Contract(s) Reference
| Contract A1 |
| Contract A2 |
| Contract A3 |
Contract Name
Issuing Office
Total Estimated Value of the Contract/Projects (s):
Period of Performance(s):
Place of Performance(s):
Program Title
Customer Name
Customer POC
Project Dates (MM/DD/YY – MM/DD/YY)
A.1 Provide a description of work performed as similar in size, scope and complexity to the requirements outlined in the Draft SOW for previous contract A1:
A.2 Provide a description of work performed as similar in size, scope and complexity to the requirements outlined in the Draft SOW for previous contract A2:
A.3 Provide a description of work performed as similar in size, scope and complexity to the requirements outlined in the Draft SOW for previous contract A3:
B. Describe current contracts similar in size, scope and complexity to the requirements outlined in the Draft SOW. You must provide detailed information for three (3) current contracts including program title, customer name, project dates, project value, customer point of contact, and description of work performed.
Table 2: Current Contract(s) Reference
| Contract B1 |
| Contract B2 |
| Contract B3 |
Contract Name
Issuing Office
Total Estimated Value of the Contract/Projects (s):
Period of Performance(s):
Place of Performance(s):
Program Title
Customer Name
Customer POC
Project Dates (MM/DD/YY – MM/DD/YY)
B.1 Provide a description of work performed as similar in size, scope and complexity to the requirements outlined in the Draft SOW for current contract B1:
B.2 Provide a description of work performed as similar in size, scope and complexity to the requirements outlined in the Draft SOW for current contract B2:
B.3 Provide a description of work performed as similar in size, scope and complexity to the requirements outlined in the Draft SOW for current contract B3:
C. Please confirm whether your company has the ability to provide all required services and equipment to meet the FAA’s requirements as outlined in the Draft Statement of Work, (Draft Section C).
Using the table provided below, indicate with an “X” or check mark the Contract(s) under which your company has provided or is currently providing services, as outlined in the respective sections of the Draft SOW
Table 3: Services and Equipment
| Contract A1 |
| Contract A2 |
| Contract A3 |
| Contract B1 |
| Contract B2 |
| Contract B3 |
Program Management (C.3.0)
COTS Battery System (C.4.0)
Battery System Delivery And Recycle/Disposal Service (C.6.0)
Battery System Replacement Services (C.7.0)
Battery Monitoring System (BMS) Installation Services (C.7.0)
Battery Monitoring System (BMS) Training Services (C.7.0)
Battery Depot Support (C.9.0)
Technical Support Services (C.10.0)
C.1 Provide a supporting narrative detailing how your company meets these requirements.
D. Does your company have the capability to provide Battery System?
Using the table provided below, indicate with an “X” or check mark the Contract(s) under which your company has provided or is currently providing Battery System.
Table 4: Battery System
| Contract A1 |
| Contract A2 |
| Contract A3 |
| Contract B1 |
| Contract B2 |
| Contract B3 |
Vented Lead Acid (VLA)
Valve Regulated Lead Acid (VRLA)
Nickel-Cadmium
Battery Monitoring System (BMS)
Building Ventilation Modification (BVM) for H2 control
Asbestos work / remediation
Stationary battery string maintenance / troubleshooting
D.1 Equipment Delivery Lead Time. Please identify estimated manufacturing lead times (in months) for each of the following categories. For any lead times in excess of 12 months, please provide any suggested mitigation strategies to reduce the lead times in the space provided below the table. In addition, please provide an explanation of your communication plan to keep Customer informed of any delays.
| Routine Project |
| Urgent Project* |
| Min |
| Max |
| Min |
| Max |
VLA
VRLA
Nickel-Cadmium
BMS
BVM
*NOTE: Urgent Projects are only considered at the sole discretion of the government and are expected to minimize lead-time even if cost increases relative to routine. Urgent Projects should never compromise battery integrity such as the cells being used, the cells sharing a manufacturing date code, the cells being fully warrantied, and the cells passing normal integrity testing.
Narrative:
E. If your company will require services of additional subcontractors to perform the requirements of this contract, please identify any subcontracts, teaming agreements or partnerships and the estimated percentage of work each third party would perform against the total effort of the contract.
F. Describe your ability to deliver requirements of the SOW both within the continental United States (CONUS) and outside the continental United States (OCONUS). Include details describing your ability to provide on-site technical support CONUS and OCONUS in the narrative section below.
Using the table provided below, indicate with an “X” or check mark which region(s)your company is capable and/or interested in providing services in:
Table 4: Capable/Interested Region
| Region |
| Insert “X” |
| 1 |
| Alaskan (AK) |
| 2 |
| Central (IA, KS, MO, NE) |
| 3 |
| Eastern (DC, DE, MD, NJ, NY, PA, VA, WV) |
| 4 |
| Great Lakes (IL, IN, MI, MN, ND, OH, SD, WI) |
| 5 |
| New England (CT, MA, ME, NH, RI, VT) |
| 6 |
| Northwest Mountain (CO, ID, MT, OR, UT, WA, WY) |
| 7 |
| Southern (AL, FL, GA, KY, MS, NC, PR, SC, TN, VI) |
| 8 |
| Southwest (AR, LA, NM, OK, TX) |
| 9 |
| Western-Pacific (AZ, CA, HI, NV, AS, GU, MH) |
Note: A visual map of the regions can be found at https://www.faa.gov/airports Response:
G. Review Attachment J.01 DRAFT CLIN Structure for alignment with your services, suggest revisions if applicable to improve clarity and efficiency.
Please provide suggested revisions below:
G.1 Please discuss your approach to managing “equipment refresh/obsolescence” as it pertains to contract administration. Specifically, explain how the updating and revision of Section B/ Attachment J.01 should be accomplished during the contract period of performance to ensure the FAA continues to receive equipment that meets system requirements in a timely manner at a fair and reasonable cost without being overly administratively burdensome?
H. State whether Lithium-ion battery options are available. If available, describe any advantages or limitations compared to VRLA and VLA batteries.
I. State your approach to warranties on work previously performed by your company. Please include warranty timeframes and confirm if the warranty includes both equipment and installation.
J. Describe your capabilities and procedures for safely storing, handling, and charging battery strings, including compliance with applicable safety and regulatory standards.
K. Describe your capability and experience with remediating asbestos (small areas or full rooms). Describe you procedures for the handling, removal, and disposal of asbestos-containing materials, including certifications, regulatory compliance, and waste disposal methods.
L. Based on prior contracts, describe any challenges related to equipment or tool availability and the measures you have implemented to proactively prevent such issues.
M. Describe your capabilities and challenges with providing a site visit including electrical and structural review. Provide an example site survey report. The report may be submitted as a separate attachment.
N. Describe your capabilities and challenges with battery and battery monitor technical support. Provide an example of data and analysis. The data and analysis may be submitted as a separate attachment.
O. Please provide any relevant feedback, suggestions, or comments on the Section C DRAFT Statement of Work (SOW) and associated J Attachments included in this Market Survey to assist in the FAA’s procurement process. If your company is unable to supply the requirements described in the SOW or believes there are more suitable solutions available, please indicate this in your response below.