This document is a Revised Responses to Offeror Questions (J-8) for a solicitation (030ADV26R0007) regarding an exhibition design project for the Library of Congress's "Inside the Creative Process" exhibit. The project involves designing an exhibition for the 3,700 sq ft Treasures Gallery, with two object rotations (each featuring 120 objects) and specific design requirements including concept development, graphic design, brochure creation, and environmental graphics.

Key details include a proposal due date of January 5, 2026, with funding already available. The exhibit will utilize existing media stations, interactive table, and audio modules, with the Library providing all content, text, and image permissions. The design approach will be consistent across both rotations, with potential minor graphic adjustments. Fabrication is not included in this requirement, and the designer will not provide services during the fabrication and installation phases of Rotation 2. The Library seeks an exhibit designer with experience in large-scale museum or cultural institution exhibition design, with specific requirements for past performance documentation and proposal submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-8 - 030ADV26R0007 – Revised Responses to Offeror Questions –

12/23/2025 – (14 Pages)

# Section & Page Reference

Question Answer

1 N/A – General Question

Could the Library please provide an estimated budget for the new Inside the Creative Process exhibit? How was the budget determined?

The Library will share information about the budget at the kick-off meeting.

2 N/A – General Question

Would the Library be willing to consider establishing either a one year or a multiyear Interagency Agreement (IAA) with another federal government cultural institution to meet this requirement?

Not at this time. This is a full and open solicitation.

3 N/A – General Question

Is there a more comprehensive description of the theme "Inside the Creative Process"?

Please see updated background in Section C.1.

4 N/A – General Question

Would the Library provide prospective offerors some of the range of the TYPES of objects that will be displayed in the exhibition?

The objects are as defined in SOW.

As an example, see section C.3.2.1 and other references to objects in the SOW.

5 N/A – General Question

Will there be audio and video components to the artifacts displayed in the exhibition?

Yes, in the existing media stations (video wall and audio modules, interactive table)

6 N/A – General Question

Q 6.1 - Will the window projections or interactive table be updated?

Q 6.2 - Would the Exhibition Design Firm work in tandem with Digital and AV teams?

A 6.1 – No.

A 6.2 – No. We are planning to only update the video wall, which will be done in-house.

7 N/A – General

What level of digital media is anticipated for the new exhibit?

Existing media will be used with the exception of the video wall and audio modules, which will be created in-house

8 Section C.3.3.6 –

Q 8.1 - How will the Rotation #2 Deliverable Package be used?

Q 8.2 - Is it intended as a new and separate version of the Inside the Creative Process exhibit that will be displayed at the Library or somewhere else?

Q 8.3 - Will further details be provided regarding the additional 120 objects to prepare for this separate display?

A 8.1 - The Package will be used for object installation and estimation of graphic production effort.

A 8.2 - No, this is simply to capture the changes for items that are approved for about 6 months of display.

A 8.3 – Further details will be provided after project kick off

9 Section L.1.4.A –

Prospective offeror possess experience with large-scale projects, such as a major store project which comprised a

21,700 sq ft (2,018㎡) building and included a dedicated interpretive exhibition zone of approx. 4,000 sq ft

(371㎡). This gallery-scale space was designed with narrative graphics, object displays, and visitor circulation comparable to the Library’s 3,700 sq ft Treasures Gallery. Will the Library confirm if commercial/private sector projects with comparable scope and interpretive design elements, such as this example, are acceptable to demonstrate the required 'experience designing and planning at least one (1) creative and engaging exhibition... that is at least 3,700 sq. ft, for a major museum or cultural institution'?

The requirements are as stated in the solicitation.

10 M.2.E – Page 58 Will the Library evaluate proposals neutrally on the Past Performance factor, as mentioned in Section M.2.E, if no relevant past performance information is obtained by the Library?

The Library will conduct the evaluation as stated in the solicitation.

11 Section C.5.– Page 10;

Attachment J-1 – Draft Floor Plan

Attachment J-1 (Floor Plan) is provided for price quoting purposes only, and drawings/dimensions of available casework/wall systems and the fabrication budget will be provided after award. To accurately estimate the scope of work and potential new fabrication designs, would the Library provide preliminary information regarding the approximate dimensions (height/depth) and total linear footage of the existing casework and wall systems the contractor will be required to utilize?

Please see updated background in Section C.1. Additional drawings will be provided at or after the kick-off meeting.

12 N/A – General

Are incumbent design firms from the original Treasures Gallery permitted to bid?

The solicitation is open to all.

13 N/A – General Question

Is fabrication included in the scope of this RFP, or will that be bid out separately once the design is more developed?

Fabrication is not included in this requirement but will rely on design documents and specifications from this design process.

14 N/A – General Question

Is funding for the project in-hand, or does it need to be fundraised?

Funding is available.

15 N/A – General Question

Who will be on the client-side team and what are their roles?

The COR is the main contact for this project. All other applicable team members will be identified after during the performance of the services under the contract.

16 N/A – General Question

Can you confirm that AV Systems Design is excluded from the scope of this project?

Yes, confirmed.

17 N/A – General Question

Can you confirm that Lighting Design is excluded from the scope of this project?

Yes, confirmed – the casework has an existing lighting system.

18 N/A – General

Is there any additional information available on the exhibition content for "Inside the Creative Process" beyond the provided floor plan/elevations?

Please see updated background in Section C.1.

19 N/A – General

Would the Library of Congress consider extending the deadline beyond January 5, 2026?

The proposal due date has been extended. See the amendment to the solicitation.

20 Section C.3.1. –

In Clause C# Requirements under C3.1.

Scope Please could you expand on Planning Consultations. Is a content developer of Interpretive Planner/Writer/Editor required?

An interpretive planner/writer/editor is not required.

21 Section C.3.2.1 –

In Clause 3.2.1 Concept Phase is LOC able to provide CAD drawings of the gallery and any 3D MCAD models?

LOC can provide PDF drawings of cases, floor plan after the period of performance start date.

22 Section C.3.2.2 –

In Clause 3.2.2 Design Development Phase please can you define “rough” fabrication cost. Is this a Class D costing?

Please see revised Section C.3.2.2

23 N/A – General Question

Are offerors permitted to obtain cost input from a fabricator and if this is the case will they be permitted to bid on the fabrication?

Potential offerors can obtain information on costs from any source they deem relevant.

24 N/A – General Question

What is the size (area) of the gallery. The size is as stated in the solicitation.

25 Section C. 3.3.7 –

Approximately how many photographs should be permitted. Are these to be taken by a professional photographer for publicity purposes or just record purposes?

Please see revised Section C.3.3.7.

26 Section F.2. – Pages 13-15

Q 26.1 - What is the start date of the project?

A 26.1 – The period of performance start date for the

Q 26.2 - Are the day indicated work days or calendar days?

contract will be as stated in the contract at contract award.

A 26.2 – Calendar days.

27 N/A – General

How should the Contractor address disbursements incurred on the project?

Payments will be made as stated in the solicitation.

28 N/A – General Question

Please Confirm that all content (text copy and images) will be provided by the LOC.

Confirmed.

29 Section C.3.3.4. –

Please Confirm that the “Coming Soon” graphic is only 2 versions. 1X Horizontal & 1X Vertical.

Confirmed.

30 Section C.3.3.4.b. –

Please clarify purpose of exhibition brochure and intended format (ie.

Booklet, Single Fold, Tri-fold…etc.).

Please confirm if scope is for English Only version.

Confirming English only, likely trifold to capture the section text and one or two examples of the artifacts therein. The exact type will be confirmed during the period of performance of the contract.

31 Section C.3.3.5.e –

Clarify whether the signature advertisement for digital and broadcast advertising campaign is intended to be a static graphic or if it is meant to be animated or live action.

These ten will be a combination of print and digital ads, but not animated/live action.

32 Section C.3.3.5.e –

For advertising campaign, clarify if the 10 variations is the total number for print, digital, and broadcast OR if it is 10 each.

Ten total across print and digital.

Please see revised Section C.3.3.5.e.

33 Section C.3.3.7 –

Please clarify what quality of photography is required for the final installation documentation. Are handheld phone photographs sufficient or are high quality professional photography expected?

These are for record purposes, so high quality professional photography is not expected (the Library will use its in-house photographer for its publications).

See revised Section C.3.3.7.

34 Section C.3.3.4.a. –

How many presentation renderings are required?

This is an iterative process as stated in the solicitation.

35 Section C.3.3.6 –

For Rotation 2, clarify what “additional environmental graphics” will be needed.

These graphics will be determined by the content of Rotation 2, which is still to be developed. See the edits to the deliverables – these are exhibit graphics.

36 N/A – General Question

Due to conflicts over the holidays, would the Library be willing to consider an extension of 2-3 weeks?

Please see answer to question #19.

37 Section C.1. – Page

The RFP notes that all design work under this contract must meet museum security standards. Is the specification of security devices and/or a security system for the existing casework or room part of the scope of this project?

No, the casework and gallery have existing security systems. All security has been addressed.

38 N/A – General Question

If we include a cost estimator on our team who is also a fabricator, would that cost estimator be prevented from bidding on the fabrication and installation scope as a fabricator?

No.

39 N/A – General Question

The Scope of Work does not list review of shop drawings and response to contractor RFI’s, etc. Are such services in the scope of the exhibit designer for this project? If so, in what deliverable should the fee for those services be included?

See revised Section C (Statement of Work).

40 Section C. 3.3.7 –

The Scope of Work includes the exhibition designer attending installation for “final placement of objects”. Is the Exhibit Designer also desired to visit the site during the installation of the fabricator's scope of work? If so, in what deliverable should the fee for those services be included?

See revised Section C (Statement of Work)

41 N/A – General Question

Will this project include any media? If so, please confirm if this is existing media (audio recordings, video, etc.) or if the media elements would need to be developed by the exhibit designer as part of the scope of this project.

Media development is not included in this requirement.

However, the contractor must incorporate the placement of media elements into the design.

42 N/A – General Question

Will this project require AV integration, specification of audio or visual equipment?

No.

43 N/A – General Question

If we include an AV designer/integrator on our team, would that AV integrator be prevented from bidding on the AV hardware procurement and installation of the AV scope?

No. Please see answer to #38

44 N/A – General Question

Will the development and design of the additional wall or special element potentially include media design?

No.

45 N/A – General Question

Is there a desire for any of the exhibition displays to be interactive? If so, could you describe the kind of interactives that you envision for the

Interactive development is included in this requirement, however, contractor must account for certain existing space? Interactives are noted in the F.2 Deliverables schedule but are not noted elsewhere in the main RFP document.

media/interactive elements in the design.

46 N/A – General Question

In the current exhibit, there appears to be an interactive table in the middle of the space.

Q 46.1 - Would that table remain as part of this project?

Q 46.2 - Would any of those interactives remain?

Q 46.3 - Would that table be the only space for interactives in the new exhibit?

A 46.1 – Yes.

A 46.2 – Yes.

A 46.3 – No, there are also audio modules in the reader rails that may be used in the new exhibit, and a media wall that will be incorporated into the design.

47 N/A – General Question

Are there power/data drops available throughout the space? Could you share a plan?

This information will be provided after the period of performance start date.

48 N/A – General Question

Should we include an electrical engineer on our team or does the existing space have enough and readily available power/data drops?

No. An electrical engineer is not needed. Existing space has sufficient power and data readily available.

49 N/A – General Question

Q 49.1 - Will the Architect of the Capital (AOC) be involved in this project? If so, could you describe the extent of interaction and collaboration required?

Q 49.2 - Will AOC approval be required for the project? If so, at which phases?

A 49.1 – No.

A 49.2 – No.

50 N/A – General Question

Are there any upgrades to the space or adjacent spaces that will be happening around the time of this project?

No.

51 N/A – General Question

Q 51.1 - The RFP notes that the exhibition production schedule and fabrication budget will be provided by the COR at the kickoff meeting. Is the Library able to provide a rough ballpark range for the budget now? That would help us understand the level of extent of the “addition wall or special element” possible which would help us understand the amount of work involved. This information would help us provide a more accurate fee proposal.

A 51.1 - Please see answer to Question # 1 above.

A 51.2 – The budget would include both Rotation 1 and Rotation 2.

Q 51.2 Please also confirm if this budget is for Rotation #1 alone or for Rotation #1 plus Rotation #2.

52 N/A – General Question

The RFP notes that this contract includes all related graphic design and promotion for the exhibition.

Q 52.1 - Does the promotion work include anything beyond the brochure and “coming soon” file?

Q 52.2 - If so, could you clarify what that scope is?

Q52.3 - Is the “Coming Soon” file a single page or a brochure?

A 52.1 – Please see C.3.3.5 e.

A 52.2 -see response to Question 52.1

A 52.3 – This will be discussed during the contract’s period of performance.

53 Section C.3.3.4.b –

Will there be one brochure that covers both Rotation #1 and Rotation #2 or will there be two separate brochures?

Yes, a single brochure will cover both rotations.

54 N/A – General Question

Do the environmental graphics consist of anything else beyond the following items?:

a. Production files for signage in kiosks, Great Hall exhibit banner, and CVC tunnel.

b. Ten (10) variations of signature advertisement of exhibition

Please see revised Section C – Statement of Work.

55 N/A – General Question

Will two sets of environmental graphics be required (one for Rotation #1 and a separate set for Rotation #2)?

Rotation 2 will reuse most if not all of the graphics and graphic approaches, but some changes to exhibit graphics may be required depending on content.

56 Section C.3.3.5.d – Page 8;

Section C.3.3.4.b – Page 7;

Section F.2. – Pages 13-15

Deliverable C.3.3.5.d is listed as being for “all text and image graphic production-ready files submitted for review” and is listed as being due March 1, 2027. Deliverable C.3.3.4.b is listed as being for “Present two options for Exhibition Brochure Design” and is listed as being due May 1, 2027. Since the options for the brochure are not due until two months AFTER the text and image graphic production files are submitted for review, does that mean that the text and image graphic files (C.3.3.5.d) are just for exhibit elements

Correct, Section C.3.3.5.d.

addresses graphics for fabrication within the exhibit. Collateral materials for advertising/promotion are separated, as they are needed later than the object layouts, graphic schedule, and overall design approach.

and are NOT for brochure, promotion or environmental graphics?

57 N/A – General Question

Should the project cost estimates include the promotional graphic work or is that covered in a separate budget?

The required cost estimates are as stated in the Section C (Statement of Work).

58 N/A – General Question

Will the Library be responsible for obtaining licensing, copyrights and acquisitions? Or would any of that fall into the exhibition designer’s scope?

The Library will obtain permissions for this exhibition.

59 N/A – General Question

Will the Library purchase the fonts for use in the graphics, or should that be carried in the exhibition designer’s scope?

Yes. Please see revised Section C.3.3.3.

60 N/A – General Question

Will Rotation #1 (first set of 120 objects) and Rotation # 2 (for a second set of 120 objects) be developed simultaneously? (e.g. they will pass through concept, design development and final design phases and approval together, but then the fabrication and installation will be offset? Or will the design of each be offset from one another? If the latter, what is the anticipated design schedule for Rotation #2?)

The overall design approach will serve for both rotations. Rotation 2 will change objects, and potentially some exhibit graphics, but will, as much as possible, provide like items, in size/format/story, as Rotation 1.

61 N/A – General Question

Does the Library envision Rotation #1 and Rotation #2 as two distinct, separate projects (with potentially significantly different visual character, graphic styles, and typology specifications, etc.)?

No, see response to Question 60 above. Rotation 2 is an update to objects with like size/format/story to Rotation 1.

62 N/A – General Question

What elements does the Library see as being shared between Rotation #1 and Rotation #2?

Overall graphic approach

63 N/A – General Question

Will the interactives differ between Rotation #1 and Rotation “2? (e.g.

requiring different media design and AV integration)?

No.

64 N/A – General Question

Q 64.1 - Could you confirm if new partitions are envisioned for both, neither or just Rotation #2?

Q 64.2 - If both, could you confirm if it is the intention that the wall partition locations would change (e.g. requiring demolition of Rotation 1 walls and installation of Rotation 2 walls)? The

A 64.1 – Offerors should assume the possibility of new partitions as dictated by the exhibit design.

A 64.2 – Location of wall partitions will be determined by the exhibit design for the inaugural display and the Rotation 2.

Deliverables schedule F-2 implies new partitions/ wall structures in Rotation #1 and different new partitions/ wall structures in Rotation #2.

65 N/A – General Question

Q 65.1 - If new partitions are envisioned, will this project be filed with the local authority having jurisdiction and would that filing be by the AOC?

Q 65.2 - Please clarify if there is any filing work in the scope of this contract for the exhibition designer.

AOC will not be involved with the review nor implementation of case interiors, wall partitions, etc.

66 N/A – General

In addition to using the existing casework, could you confirm if there is a desire for new casework in Rotation 1 and Rotation 2, and if so, if that new casework in Rotation #1 would be different than the new casework in Rotation #2? The Deliverables schedule F-2 implies new casework in Rotation #1 and different new casework in Rotation #2.

No new casework is required, but case furniture may change depending on object selection.

67 Section L.1.4 – Pages 53-55

Please clarify what is meant (in L.1.4 Proposal Format and Contents/volume1/B technical Approach/(1)) by: “offeror must respond sequentially to each paragraph”. By “each paragraph” is it meant all the paragraphs in section C.3 (pages 5-9) of the RFP (e.g. every paragraph/ section that starts with “C.3.

. . ”)? If not, please clarify which paragraphs.

Offeror must respond sequentially to each paragraph under Section

C.3. REQUIREMENTS.

68 Section L.1.4.E –

For the Past Performance Questionnaire. Is it acceptable if our past clients/customers who are filling out the Questionnaire submit the Questionnaire before we submit the RFP response proposal? (For example, if they submit the filled-out Questionnaire to LOC directly on December 30th, but the exhibit designer does not submit their proposal until January 3rd?)

As stated in the Solicitation Past Performance Questionnaires must be submitted by the response date and time specified in this solicitation.

69 Section L.1.4.E –

Please confirm if projects and Past Performance Questionnaires are required for each consultant (in

The past performance requirements are as stated in the solicitation.

addition to the main exhibit design firm) or just select consultants?

70 N/A – General Question

Q 70.1 - Please confirm whether the digital photographs that are part of C.3.3.7 should be taken by a professional photographer, or may they be taken by an exhibition designer?

Q 70.2 - If a professional photographer, would the Library own the copyright?

A 70.1 - These are for documentation purposes and may be taken by the designer/design firm.

A 70.2 – n/a, professional photographer not required

71 N/A – General Question

Are there plans and details available for the lighting system for illuminating the Treasures Gallery? This includes any lights integrated into the architecture and/or the existing Goppion display case.

To be shared after the kickoff meeting.

72 N/A – General Question

Is there an existing lighting control system for the Gallery?

Yes, the casework has a lighting system included.

73 N/A – General Question

Please describe the emergency lighting designed for the gallery and indicate if any revision to the current design of the emergency lighting will be required as part of this scope.

Lighting and security system details can be shared after the kickoff meeting. However, revisions to emergency lighting is not included in this solicitation.

74 N/A – General Question

Are there plans, details, and an inventory available for the lighting system integrated into the existing Goppion display case?

Yes, which can be shared at or after the kickoff meeting.

75 N/A – General Question

Are there details available on how the Goppion case lighting system/fixtures are controlled (dimming and beam spread control)?

Yes, which can be shared at or after the kickoff Meeting.

76 N/A – General Question

Is there information available on the lighting-related conservation requirements for the objects on display of this exhibition (light levels, UV/IR, and exposure duration limits)?

These will be shared after the kickoff meeting.

77 N/A – General Question

It is our understanding that the “Period of Performance start date” is February 18, 2026; is that correct?

The period of performance start date will be as stated in the award document. The date on the solicitation may be revised due to the extension of the proposal due date or unforeseen circumstances.

79 N/A – General Question

If POP starts on 2/18/26, that would mean Concept Design would need to end by 4/18/26, which would leave a maximum of 3.5 months from submission of Concept Design to

The date may be revised based on the extension of the proposal due date and unforeseen circumstances. The actual dates will be in the contract.

submission of Design Development (4/18/26 – 8/1/26). Is that correct?

80 Section C.3.3.3 –

How long are the review periods LOC anticipates needing between the Exhibit Designers’ submission of a Deliverable (e.g. C.3.3.3 Concept Design) and when LOC can provide feedback on the submission?

Please see revised Section C.5.2.

81 N/A – General Question

Please confirm that all content will be provided by the Library team, including exhibition narrative, object checklist, label for copywriting, label text, image research, and permissions.

Confirmed.

82 N/A – General Question

Please confirm when the checklists for Rotations 1 and 2 will be available.

Schedule to be discussed at kick off meeting.

83 N/A – General Question

Should we assume that most of the objects will be works on paper mentioned in the Statement of Work, such as manuscript documents, books, prints, maps, and reproductions? Please let us know if there are any other object types we should plan for.

Yes, most of the objects are as mentioned in the SOW. There might be others, such as 3D items that might be discussed during the performance of services under the contract.

84 N/A – General Question

Is the Library anticipating any large or oversized collection objects that require design of special mounting?

Yes, we anticipate the need for some special mounts, potentially one in each of the 8 case spans.

85 Section C.3.3.3 –

Does C.3.3.3 include the Concept Design for both Rotation #1 and Rotation #2? If not, where does the fee for Concept Design of Rotation #2 go?

Overall concept design will be consistent between Rotations 1 and 2. Rotation 2 requires layouts and display requirements for object rotations, and related reader rail text and graphics if needed.

86 Section C.3.3.4.a. –

Does C.3.3.4.a include the Design Development for both Rotation #1 and Rotation #2? If not, where does the fee for Design Development of Rotation #2 go?

Rotation 2 will follow the design approach of Rotation 1. Any fees associated with Rotation 2 should be assigned to the Rotation 2 deliverable for Section C.3.3.6.

87 Section C.3.3.5 – Pages 7-8

Does C.3.3.5.a/b/c include part 1 of Final Design for both Rotation #1 and Rotation #2? If not, where does the fee for part 1 pf Final Design of Rotation #2 go?

Section C.3.3.5 a/b/c is for Rotation 1. The related deliverables for Rotation 2 are listed in Section C.3.3.6.

88 Section C.3.3.5.d –

Does C.3.3.5.d include all text and image graphic production-ready files for both Rotation #1 and Rotation #2 If not, Deliverable for Section C.3.3.6, for Rotation 2, includes this language:

production-ready graphic files for where does the fee for all text and image graphic production-ready files go?

any necessary text alterations, new labels, and any additional environmental graphics.

Please address this of production-ready files with Section C.3.3.6.

89 Section C.3.3.4.b –

If there are separate brochures for Rotation # 1 and Rotation #2, is C.3.3.4.b for both brochures or just Rotation #1’s?

No, there is one brochure for both rotations.

90 Section C. 3.3.7 –

Is submission of digital photographs to document installation required for Rotation #2? If so, in what deliverable should that fee go?

There are no digital photographs required for Rotation 2.

91 Section F.2 – Schedule of Events/Deliverables

– Pages 13-15

There is currently no deliverable that covers services during the fabrication, installation, and opening phases of Rotation #2. Is it desired that the exhibit designer provide any services during those phases as part of this project? If so, are you able to add in a Deliverable for us to assign that fee to?

No, the designer does not provide these services for Rotation 2.

92 Section L.1.4.F.(i) –

As part of Volume 2, the Price Proposal, are we to include the actual Section B (page 4 of the RFP file named 030ADV26R0007) (but with a unit price added in) as a page of Volume 2? (Or do we just need to provide the requested information (Price), but it can be on a page of our own format?)

Offerors must provide the information as stated in the solicitation. A firm-fixed price must be provided in Section B and prices for each deliverable must be provided in the attachment.

93 Section L.1.4.F.(i) –

As part of Volume 2, should we include Attachment J4 exactly as is with prices filled in (instead of creating our own format)?

Offerors shall provide prices for all deliverables on Attachment J-6 – Revised Deliverables. Attachment J-6 should be submitted with prices provided for each deliverable. Offeror should not create their own format. See revised Section L.1.4.F.(i) of Amendment 0001.

94 Section L.1.4.F.(ii) –

Is SF1449 just the first page of the 030ADV26R0007 file? Or do we need to include all 58 pages in our Volume 2 Price Proposal?

Offerors must provide a signed copy of the SF1449 header page and signed header page for all amendments in Volume 2.

95 Section L.1.4.F.(ii) –

If we are to include all 58 pages, do we need to include Section B twice (i.e.

once by itself to satisfy requirements from RFP for Volume 2/F/(i) and then again as part of the 58 pages of SF11449

Please see answer to Question 94 above.

to satisfy requirements for Volume 2/F/(ii)?

96 Section L.1.4.F.(ii) –

On the SF1449 form (page 1), are we supposed to fill in only blocks 12, 17, 23, 24, & 30?

Offerors should complete blocks 30a., 30b., and 30c on the header page of the SF1449 form and all applicable sections of Section K.

97 Section L.1.4.F.(ii) –

What is meant by “Discount Terms” in box 12 of the SF1449?

“Discount Terms” in box 12 of the SF1449 form is not applicable to this requirement. Please see answer to Question 96 above.

98 Section L.1.4.F.(ii) –

On SF1449, in box 17a, what are the options/ what should be filled in for the following prompts: “code,” “facility code,” “UEI,” and “EFT”?

Not applicable. Please see answer to Question 96 above.

99 Section L.1.4.F.(ii) –

On SF1449, there is nothing listed in boxes 19, 20, 21, or 22; if we are to fill in boxes 23 and 24, should we input something into 19, 20, 21, and 22?

Not applicable. Please see answer to Question 96 above.

100 Section L.1.4.F.(ii) –

On SF1449, should #23 “Unit Price” be the total of all prices for all deliverables in the J-4 Deliverables Price Schedule?

Not applicable. Please see answer to Question 96 above.

101 Section L.1.4.F.(ii) –

On SF1449, should the entry for #23 “Unit Price” and the entry for #24 “Amount” be the same? If they are different, could you clarify the difference?

Not applicable. Please see answer to Question 96 above.

102 Section L.1.4.F.(iii)

– Page 55

In order to fulfill the requirements from RFP for Volume 2/f/(iii) (as noted on RFP page 55), if we are required to complete paragraphs (c) through (v), should we include the actual pages from the RFP (pages 40-58) and check the boxes as applicable directly onto those pages?

Offerors must complete the Representations and Certifications in Section K of the solicitation and submit as part of Volume 2 of their proposal. Please see Section K.1 on page 37 for instructions.

103 Section L.1.4.F.(iii)

– Page 55

In order to fulfill the requirements from RFP for Volume 2/f/(iii) (as noted on RFP page 55), if we are required to complete only paragraph (b), how do we complete it? There is no check box or place for signature in section paragraph (b). Should we create a page in our RFP proposal where we copy in the text from (b) (1) and (2), and add in a signature?

Please see answer to Question 102 above.

104 Section L.1.4.F. –

Should the entirety of Volume 2 just be any SF30 forms (should any be issued) and the full 58 pages of the

Offerors must submit volume 2 as described in the solicitation.

030ADV26R0007 file, with the following pages filled out:

a. Page 1 (Form 1449)

b. Page 4 (Section B Price/Cost

Schedule)

c. Pages 13-15 (Schedules of

Events/Deliverables (which appears to be identical to Attachment 4 Deliverables Price Schedule))

d. Page 22 (list of key personnel) (or since this info will already be in Volume 1, is it not needed to be filled out in Volume 2 too?)

e. Page 23 (list of subcontractors) (or since this info will already be in Volume 1, is it not needed to be filled out in Volume 2 too?)

f. Page 40 (or pages 40-52, depending on which is applicable) (for Section K representations)

Offerors need not to submit the full 58 pages of the solicitation.

a. Please see answer to Question 96 above.

b. Please see answer to Question 92 above.

c. Please see answer to Question 93 above.

d. Offerors must provide a list of key personnel for the positions listed in Section C.4. and identify these key personnel in both Volume 1 and on Page 22 of the solicitation in Volume 2.

e. If subcontracting is contemplated all proposed subcontractors must be identified in Volume 1 and on Page 23 of the solicitation in Volume 2.

f. Please see answer to Question 102 above.

105 Section L.1.4.F.(ii) –

If any SF30 forms are issued, do we need to include all pages that are issued with the SF30 in our Volume or just the signature page?

Only the signed and dated SF30 form(s) must be submitted in Volume 2 of the proposal.

106 Section L.1.4.E –

Prior to receipt of the Amendment 0001, offeror had already begun requesting Past Performance Questionnaires from former clients using Attachment J-3, dated 11/18.

Amendment 0001 includes a revised Attachment J-7, dated 12/15. Would it be acceptable for offerors to submit completed Past Performance Questionnaires using the originally issued J-3 form?

Past Performance Questionnaires attached at Section J-3 of Solicitation 030ADV26R0007 submitted prior to the issuance of Amendment 0001 will be accepted. Customers which submitted the Past Performance Questionnaires attached at Section J-3 of Solicitation 030ADV26R0007 need not submit the Revised Past Performance Questionnaire attached at Section J-7 of Amendment 0001.