This is a Project Manual Book 3 for an Invitation for Bid (IFB) issued by Salt Lake City International Airport for the Surplus Canal Relocation project in Utah. The project encompasses the relocation of the Surplus and North Point canals to the south of a newly constructed South Employee Parking Lot, positioned parallel to the existing TRAX line at the airport's landside area south and west of the center runway. The scope of work includes earthwork compliant with U.S. Army Corps standards, water management, construction of a storm water pump station and detention basin, and utility relocations. The project manual serves as a comprehensive bidding document containing technical specifications, drawings, and requirements necessary for contractors to prepare accurate and competitive bids for this heavy civil construction project.
The Project Manual Book 3 functions as a detailed reference document providing essential information for bid preparation, including technical specifications, construction standards, and project requirements. Specific pricing terms, set-asides, bid due dates, pre-bid conferences, site visit schedules, and contract award dates should be referenced in the complete IFB documents and bidding instructions. Contractors should review all sections of the project manual in conjunction with the formal IFB notice to ensure comprehensive understanding of project scope, technical requirements, and submission procedures prior to preparing their bids.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALT LAKE CITY INTERNATIONAL AIRPORT
PROJECT MANUAL FOR
SURPLUS CANAL RELOCATION
PROJECT NO. 542715
CONTRACT NO. CA-009069
Book 3 of 3
DESIGN & CONSTRUCTION MANAGEMENT
DIVISION
PAGE LEFT INTENTIONALLY BLANK
TECHNICAL SPECIFICATIONS
542715
TS-1
SURPLUS CANAL RELOCATION
ISSUED FOR BID
PROJECT NO. 542715
TABLE OF CONTENTS
Section Description No. of
Pages
C-101 SUSTAINABILITY MEASURES (ISI ENVISION) 10
C-102
TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND
SILTATION CONTROL
C-105 MOBILIZATION 4
P-101
PREPARATION/REMOVAL OF EXISTING PAVEMENTS AND
MISCELLANEOUS ITEMS
P-102 SAFETY AND SECURITY 8
P-110 CONTRACTOR'S STAGING AREA 2
P-115 DEWATERING 4
P-116 SHORING 4
P-130 SURVEY 6
P-148
CONSTRUCTION SIGNS, BARRICADES, WARNING LIGHTS, GATE
GUARDS, AND FLAGGING OPERATIONS
P-149 STREET AND PAVEMENT CLEANING 2
P-151 CLEARING AND GRUBBING 2
P-153 CONTROLLED LOW-STRENGTH MATERIAL (CLSM) 4
P-157 GROUND STABILIZATION FABRIC 2
P-306 LEAN CONCRETE BASE COURSE 10
P-605 JOINT SEALANTS FOR CONCRETE PAVEMENTS 6
P-610 CONCRETE FOR MISCELLANEOUS STRUCTURES 8
D-701 PIPE FOR STORM DRAINS AND CULVERTS 8
D-751
MANHOLES, CATCH BASINS, INLETS, AND OTHER UTILITY
STRUCTURES
D-754 CONCRETE GUTTERS, DITCHES, AND FLUMES 4
F-162 CHAIN-LINK FENCE 4
T-905 TOPSOIL 4
DIVISION 01 GENERAL REQUIREMENTS
01 20 00
SOUTH PUMP STATION NO. 8 MEASUREMENT AND PAYMENT
PROCEDURES
01 45 00 QUALITY CONTROL 14
01 53 00 TEMPORARY FLOOD PROTECTION 4
DIVISION 03 CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE 26
DIVISION 04 MASONRY
04 22 00 CONCRETE UNIT MASONRY 18
DIVISION 05 METALS
05 05 10 METAL GALVANIZING 2
05 05 19 POST-INSTALLED CONCRETE ANCHORS 6
542715
TS-2
05 05 23 WELDING 10
05 12 00 STRUCTURAL STEEL FRAMING 12
05 31 00 STEEL DECKING 6
05 50 10 METAL FABRICATIONS 12
05 51 00 METAL STAIRS 4
05 52 13 PIPE AND TUBE RAILINGS 10
05 53 13 BAR GRATINGS 8
DIVISION 06 WOOD
06 10 53 MISCELLANEOUS ROUGH CARPENTRY 6
06 20 23 INTERIOR FINISH CARPENTRY 6
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 13 26 SHEET WATERPROOFING 10
07 14 16 COLD FLUID-APPLIED WATERPROOFING 8
07 19 00 WATER REPELLENTS 8
07 21 00 THERMAL INSULATION 4
07 21 19 FOAM IN PLACE THERMAL INSULATION 6
07 22 00 ROOF AND DECK BOARD INSULATION 4
07 26 00 VAPOR RETARDERS 4
07 50 00 SINGLE PLY ROOFING 12
07 60 00 FLASHING AND SHEET METAL 6
07 72 00 ROOF ACCESSORIES 6
07 92 15 JOINT SEALANTS 12
DIVISION 08 OPENINGS
08 11 19 STAINLESS STEEL DOORS AND FRAMES 10
08 34 83 FLOOR DOORS 4
08 37 23 OVERHEAD COILING DOORS 10
08 71 00 HARDWARE 8
08 91 00 STATIONARY BLADE WALL LOUVERS 8
DIVISION 09 FINISHES
09 96 05 HIGH-PERFORMANCE COATINGS 8
DIVISION 10 SPECIALTIES
10 14 23 PANEL SIGNAGE 6
10 26 00 WALL AND DOOR PROTECTION 6
10 44 16 FIRE EXTINGUISHERS 4
DIVISION 11 EQUIPMENT
11 81 29 HORIZONTAL FALL PROTECTION 6
DIVISION 14 CONVEYING EQUIPMENT
14 60 00 HOISTS AND CRANES 4
DIVISION 22 PLUMBING
22 14 29 SUMP PUMPS 4
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 4
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 8
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC 8
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 4
542715
TS-3
23 34 23 HVAC POWER VENTILATORS 6
23 82 39.16 PROPELLER UNIT HEATERS 6
DIVISION 25 INTEGRATED AUTOMATION
25 01 25 BUILDING AUTOMATION SYSTEM 10
25 01 30 BAS INTERFACE REQUIREMENTS 4
25 02 05 FIELD DEVICES FOR BUILDING AUTOMATION SYSTEM 16
25 08 00 COMMISSIONING OF BUILDING AUTOMATION SYSTEM (BAS) 8
DIVISION 26 ELECTRICAL
26 05 00 BASIC ELECTRICAL MATERIALS AND METHODS 2
26 05 19 WIRES AND CABLES 6
26 05 26 GROUNDING AND BONDING 6
26 05 33 RACEWAYS 8
26 05 48 SEISMIC RESTRAINT FOR ELECTRICAL WORK 6
26 09 13 ELECTRICAL POWER MONITORING 20
26 22 00 TRANSFORMERS 6
26 24 16 PANELBOARDS 8
26 27 26 WIRING DEVICES 4
26 29 00 MOTOR CONTROLLERS 8
26 29 23 VARIABLE-FREQUENCY DRIVES 10
26 32 14 ENGINE GENERATORS 20
26 36 01 TRANSFER SWITCHES 10
26 43 00 SURGE PROTECTIVE DEVICES 4
26 51 00 LIGHTING 6
DIVISION 27 COMMUNICATIONS
27 05 10 COMMON WORK RESULTS FOR COMMUNICATIONS SYSTEMS 28
27 05 27 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS 12
27 05 34 PATHWAYS FOR COMMUNICATIONS SYSTEMS 12
27 05 54 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS 22
27 08 10 TESTING OF COMMUNICATIONS SYSTEMS 10
27 11 10 COMMUNICATIONS EQUIPMENT ROOM FITTINGS 6
27 13 10 COMMUNICATIONS BACKBONE CABLING 24
27 15 10 COMMUNICATIONS HORIZONTAL CABLING 12
27 21 00 DATA COMMUNICATIONS NETWORK EQUIPMENT 14
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
28 05 10 COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY 16
28 13 10 CARD ACCESS SECURITY SYSTEM (CASS) 24
28 23 10 VIDEO SURVEILLANCE SYSTEM (VSS) 20
DIVISION 31 EARTHWORK
31 05 19.13 GEOTEXTILES FOR EARTHWORK 6
DIVISION 32 EXTERIOR IMPROVEMENTS
32 15 00 AGGREGATE BASE COURSE AND SURFACING 10
32 92 19 SEEDING 8
32 93 10 BIOSWALE AND LANDSCAPE 14
542715
TS-4
DIVISION 33 SITE UTILTIES
33 05 01 HIGH DENSITY POLYETHYLENE PIPE (AWWA C906, MODIFIED) 16
33 05 07 POLYVINYL CHLORIDE PIPE 4
33 08 00 COMMISSIONING OF WATER UTILITIES 6
33 11 00 WATER DISTRIBUTION AND TRANSMISSION 10
33 12 16 WATER VALVES 6
33 13 00 DISINFECTION 4
33 31 00 SANITARY SEWERAGE SYSTEMS 8
33 47 13 POND AND RESERVOIR LINERS 6
33 51 00 GAS LINE EXCAVATION AND BACKFILL 4
33 51 42
UNDERGROUND DUCT BANKS AND CONDUITS FOR COMMUNICATIONS
SYSTEMS
33 51 43 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS 18
DIVISION 35 WATERWAY AND MARINE CONSTRUCTION
35 31 19.40 STONE REVETMENTS 18
35 41 00
EXCAVATION AND EMBANKMENT FOR LEVEE, CANAL, DETENTION
BASIN, AND APPURTENANT STRUCTURE CONSTRUCTION
DIVISION 40 PROCESS INTERCONNECTIONS
40 05 07 HANGERS AND SUPPORTS FOR PROCESS PIPING 8
40 05 19 DUCTILE IRON PROCESS PIPE 6
40 05 31 THERMOPLASTIC PROCESS PIPE 8
40 05 51 COMMON REQUIREMENTS FOR PROCESS VALVES 6
40 05 52 SLIDE AND FLUME GATES 6
40 05 57 ACTUATORS FOR PROCESS VALVES AND GATES 6
40 05 59.33 CAST IRON SLIDE GATES 8
40 05 61 GATE VALVES 4
40 05 65.23 SWING CHECK VALVES 4
40 05 78.29 COMBINATION AIR VALVES FOR WASTEWATER SERVICE 4
40 70 00 AUTOMATIC SAMPLER 8
40 71 00 FLOW MEASUREMENT 8
40 72 00 LEVEL MEASUREMENT 6
40 73 13 PRESSURE AND DIFFERENTIAL PRESSURE GAUGES 6
40 73 36 PRESSURE AND DIFFERENTIAL PRESSURE SWITCHES 4
DIVISION 43
PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND
STORAGE EQUIPMENT
43 05 20 COMMON WORK RESULTS FOR LIQUID HANDLING EQUIPMENT 8
43 23 31 VERTICAL CENTRIFUGAL PUMPS 6
43 25 13 SUBMERSIBLE CENTRIFUGAL PUMPS 8
TECHNICAL SPECIFICATIONS SECTION 27 05 10
Salt Lake City International Airport 27 05 10-1 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
SECTION 27 05 10
COMMON WORK RESULTS FOR COMMUNICATIONS SYSTEMS
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
B. All other Division 27 Specifications.
1.2 SUMMARY
A. A structured cabling and communications system will be installed at the Salt Lake City
International Airport (SLC) new South Pump Station No.8 that consists of underground conduit, inside conduit, backbone cabling (fiber optic), horizontal Category 6A F/UTP cabling, and local area networking equipment. Installation of the infrastructure devices and components shall follow an industry recognized standards-based approach as well as all manufacturer recommended practices.
B. ANSI/TIA/EIA 568B and the BICSI Telecommunications Distribution Design Manual (TDDM) have been established as the standard for the cabling components of the communications infrastructure installation. All cabling infrastructure components shall be installed to the requirements set forth in the reference documents listed within.
C. The networking manufacturers’ installation and configuration requirements shall be established as the standard for networking components, in addition to industry recognized recommended practices.
1.3 REFERENCES
A. Specific reference in specifications to codes, rules, regulations, standards, manufacturer’s instructions, or requirements of regulatory agencies shall mean the latest printed edition of each in effect at the date of contract unless the document is shown dated.
B. References:
1. ANSI/TIA/EIA-568-C – Commercial Building Telecommunications Cabling Standard.
2. ANSI/TIA/EIA 568-C.1 - Commercial Building Telecommunications Wiring Standards, General requirements.
3. ANSI/TIA/EIA 568-C.2 - Commercial Building Telecommunications Wiring Standards, Balanced Twisted Pair Cabling Components.
4. ANSI/TIA/ EIA-568-C.2-1 – Additional Transmission Performance Guidelines for 4-Pair
100 Category 6 Cabling.
5. ANSI/TIA/EIA 568-C.3 - Commercial Building Telecommunications Wiring Standards, Optical Fiber Cabling Components standards.
Salt Lake City International Airport 27 05 10-2 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
6. ANSI/TIA/EIA 568-C.3 .1 – Additional Transmission Performance Specifications for
50/125µm Optical fiber Cables.
7. ANSI/TIA/EIA 569 - Commercial Building Standard for Telecommunications Pathways and Spaces.
8. ANSI/TIA/EIA 606-A – Administration Standards for Telecommunications
Infrastructures.
9. ANSI/TIA-607-D – Generic Telecommunications Bonding and Grounding (Earthing) for
Customer Premises.
10. ANSI/TIA/EIA 526-7 – Measurement of Optical power Loss of Installed Single-mode
Fiber Cable Plant (Method A).
11. ANSI/TIA/EIA 758 – Customer Owned Outside Plant Telecommunications Cabling
Standard.
12. ANSI/TIA/EIA 758-1 - Customer Owned Outside Plant Telecommunications Cabling
Standard.
13. Building Industry consulting services International (BICSI) Distribution Methods Manual
(TDMM).
14. Building Industry Consulting Services International (BICSI) Customer Owned Outside
Design Manual.
15. Institute of Electrical and Electronic Engineers (IEEE)
16. National Electrical Manufacturers Association (NEMA).
17. National Fire Protection association (NFPA) 72, National Electrical Code (NEC).
18. TIA/EIA-TSB-67 – Transmission Performance Specifications for Field Testing of
Unshielded Twisted Pair Cabling Systems.
19. TIA/EIA-72 – Centralized Optical Fiber Cabling Guidelines, October 1995.
20. TIA/EIA PN-3398 (Cabling practices for Open Offices).
21. Underwriters Laboratories (UL) Cable Certification and Follow-up Program.
22. American Society for Testing Materials (ASTM).
23. American National Standards Institute (ANSI) X3T9.5 Requirements for UTP at 100
Mbps.
C. Conflicts:
1. Between referenced requirements and contract documents: Comply with the one establishing the more stringent requirements.
2. Contractor is responsible for notifying the Owner and providing a recommended resolution immediately upon identification of any conflicts.
1.4 DEFINITIONS
A. BICSI – Building Industry Consulting Services International
B. F/UTP – Foiled/Unshielded Twisted Pair
C. LAN – Local Area Network
D. PMT - Project Management Team
E. RCDD - Registered Communications Distribution Designer
F. SCS – Structured Cabling System
Salt Lake City International Airport 27 05 10-3 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
G. SLC – Salt Lake City International Airport
H. SLCDA IT– Salt Lake City Department of Airports, Information Technology
I. UTP – Unshielded Twisted Pair
J. TE – Telecommunications Enclosure
K. VLAN – Virtual Local Area Network
1.5 MINIMUM QUALIFICATIONS
A. General
1. All personnel performing any installation, configuration, or oversight of the communications infrastructure systems’ implementation shall hold the appropriate certifications, training, and experience requirements as specified in this section. In no instance shall any contractor’s staff perform any work on the communications infrastructure without the appropriate training and certifications.
2. The Owner reserves the right to reject any installation staff member which meets the stated minimum requirements but in the opinion of the Owner does not meet the Owner’s and industry standards of satisfactory workmanship.
3. Installation Contractors shall have been in business a minimum of five (5) years performing similar work as described within these specifications.
B. Backbone Cabling Installer Minimum Qualifications:
1. Contractor Qualifications: Installing contractor shall be a Certified Corning Optical
Communications Network Master Installer (NPI) at either the Master or Expert tier level, and shall remain certified while maintaining, at a minimum, their Expert certification as a
Partner Installer member in good standing for the duration of the project. Installing contractor shall provide the EWP 25-Year LANscape® Extended Product Warranty.
2. Contracting company shall have at least one person trained by Corning Cable Systems who has completed the six (6) required NPI endorsed courses. This staff member shall be on-site and directly involved in the project and all installation activities.
3. All installers shall be manufacturer certified for FO installation and termination.
Contractor shall have at least one person assigned, and directly involved in the installation, that is trained by Corning Cable Systems in both the TS FSD 400 “Fiber
Optic Design Course for Multimode and Single-mode Optical Local Area Networks” and
TS LAN 400 “Hands-On Installation Technology Course for Optical Multimode Local
Area Networks” courses. Proof of certification shall be presented for approval of qualifications.
4. Layout Responsibility: Preparation of Shop Drawings, Cabling Administration Drawings, and field testing program shall be developed and overseen by an RCDD. Construction submittal drawings shall be stamped by the RCDD.
5. System installer shall own or have immediate access to test and splice equipment (OTDR, power meter, light source, mechanical splice kit and fusion splicer) in order to install, restore, and test fiber optic systems properly. All test equipment shall be certified within dates set by a certified calibration certificate for each piece of test equipment used to verify fiber readings to be included with final documentation.
Salt Lake City International Airport 27 05 10-4 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
6. Installation personnel shall be certified by Manufacturer on all fiber connectors and other equipment utilized in this project.
C. Horizontal Cabling Installer Minimum Qualifications:
1. Contractor Qualifications: Installing contractor (company) shall be a CommScope
PartnerPro™ certified contractor for any and all structured cabling including special systems, installation and maintenance work for this project. The Owner shall only accept
CommScope PartnerPro™ Premier or Select Certified Partners.
2. The Contractor shall be fully capable of installing cabling of low voltage infrastructure to support applications such as, but not limited to data, voice and imaging network systems.
The Contractor shall at a minimum possess the following qualifications:
a. Personnel trained and certified to design and install SYSTIMAX Products; at minimum, One (1) Person on staff and directly involved with the project who has completed the CommScope SYSTIMAX Design and Engineering Course (SP3321
- SYSTIMAX SCS Design and Engineering).
b. All installation personnel shall have completed the CommScope SYSTIMAX
Installation and Maintenance Course (ND3361 - SYSTIMAX Installation and
Maintenance) and be competent in Termination, Splicing, Testing, Trouble
Shooting Fiber and Copper Products.
D. Active Networking Equipment Installer Minimum Qualifications:
1. Contractor Qualifications: The Contractor shall be fully capable of installing and configuring the local area network infrastructure. The Contractor shall at a minimum possess the following qualifications:
a. Installing contractor shall be certified by the manufacturer of the active networking equipment to be installed (Hewlett Packard – HP), and adhere to the engineering, installation/testing procedures, and utilize the authorized manufacturer components in provisioning for the project.
b. Installing contractor shall possess the appropriate certifications and/or training from the proposed manufacturer(s) for service of the equipment and software and supporting evidence of those qualifications.
c. The Contractor shall provide manufacturer certified and trained network engineers through the manufacturer’s Professional Services division(s) to assist in the network deployment including configuring, installing, and testing of the equipment. The resources provided through the manufacturer’s Professional
Services will coordinate through the supervision of the Owner to complete the network deployment as detailed in the project specifications and drawings.
1.6 BID SUBMITTALS
A. The following minimum qualification evidence shall be submitted as part of the
Contractor/Subcontractor bid proposal for review and approval by the Owner. All submittals shall conform to the requirements identified in the General Conditions of this Contract:
1. General:
Salt Lake City International Airport 27 05 10-5 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
a. Provide address of Contractor’s office that will be utilized by the Contractor during the construction process and warranty period.
b. Provide the date that the contracting company was established and project references detailing the type of work that has been performed in the previous five
(5) years.
2. Backbone Cabling Installer Minimum Qualifications Documentation:
a. Provide proposed installation company’s certification documentation detailing the
Corning Optical Communications Network Master Installer (NPI) at the Master or
Expert tier level
b. Provide documentation detailing the ability to provide the Corning EWP 25-Year
LANscape® Extended Product Warranty.
c. Provide resume, project role, and course/certification certificates of staff member(s) that have completed the six (6) required NPI endorsed courses.
d. Provide resumes, project role(s), and course/certification certificates for all proposed installation staff members depicting completion of Corning fiber optic installation and termination courses.
e. Provide resume and course/certification certificates for staff member(s) that has been trained by Corning Cable Systems in both the TS FSD 400 “Fiber Optic
Design Course for Multimode and Single-mode Optical Local Area Networks” and
TS LAN 400 “Hands-On Installation Technology Course for Optical Multimode
Local Area Networks” courses.
f. Provide a list of a minimum of three (3) recently completed fiber optic installation projects of similar type and size with project names, addresses, and names of
Owners, contact names and telephone numbers.
3. Horizontal Cabling Installer Minimum Qualifications Documentation:
a. Provide proposed installation contractor’s certification documentation detailing the
CommScope Premier or Select PartnerPRO™ and SYSTIMAX Certified Installer
Certification.
b. Provide documentation detailing the ability to provide the SYSTIMAX Extended
Product Warranty.
c. Provide resumes, project role(s), and course/certification certificates for all proposed installation staff members depicting certification for the installation of
SYSTIMAX Products
d. Provide resume, project role, and course/certification documentation for the staff member that has completed the CommScope SYSTIMAX Design and Engineering
Course (SP3321 - SYSTIMAX SCS Design and Engineering).
e. Provide a list of a minimum of three (3) recently completed SYSTIMAX installation projects of similar type and size with project names, addresses, and names of Owners, contact names and telephone numbers.
4. Active Networking Equipment Installer Minimum Qualifications Documentation:
a. Provide documentation depicting certification by the manufacturer to provide and install the local area networking equipment.
b. Provide resumes, project roles, and certification documentation for all proposed installation team members.
Salt Lake City International Airport 27 05 10-6 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
c. Provide a list of a minimum of three (3) recently completed networking installation projects of similar type and size with project names, addresses, and names of
Owners, contact names and telephone numbers.
1.7 CONSTRUCTION SUBMITTALS
A. Construction submittals shall be provided in accordance with the General Conditions of this
Contract. Refer to individual Division 27 specification sections for all required equipment and system submittals.
PART 2 – PRODUCTS
2.1 MANUFACTURERS
A. Refer to individual Division 27 specifications for specific manufacturer requirements.
B. Where specific equipment, manufacturers, and/or model numbers are identified as the provider of a specific product or product line, no substitutions shall be allowed without prior written approval by the Owner.
2.2 PROCUREMENT
A. Contemporary Equivalent
1. Due to the rapid advancement and antiquation of electronic technology, the Contractor supplied hardware, including any software/firmware, shall be the “contemporary equal” of the specified hardware including software/firmware. The following requirements shall be met:
a. Contemporary equal shall be based on a comparison of technology at the time of publication of specification to the technology at the time of ordering the equipment for each construction bid package/phase.
b. Hardware shall be ordered as close to the actual installation date for a given phase as reasonable (i.e., latest responsible date).
c. Hardware equivalence shall be based on both technical equivalence and operational equivalence.
d. Contemporary technical equivalence shall be based on device performance specifications.
e. Contemporary operational equivalence shall be based on industry standards and function.
f. In instances where the specifications and/or contract drawings depict a specific manufacturer and/or part number, the contemporary technical and operational equivalent product shall be from the same manufacturer.
B. In no instance shall any product be submitted that has been identified by the manufacturer as being “End of Life” (EoL) within one (1) year of the product submittal date. EoL is defined as the date when the manufacturer determines that the product will no longer be manufactured or supported by the manufacturer. Where products are identified as EoL, the submitted product
Salt Lake City International Airport 27 05 10-7 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026 shall be the manufacturer’s replacement product that adheres to the contemporary technical and operational equivalent as defined above.
C. All active electronic equipment (computers, servers, cameras, networking switches, etc.) shall be submitted for review to the airport no earlier than 120 calendar days prior to installation. Where long lead items (greater than 120 calendar days) are identified, the
Contractor shall submit a request in writing, along with evidence from the manufacturer that the item’s lead time is greater than 120 calendar days. Electronic products that are identified as long-lead items may be excepted if they are identified in the initial submittal schedule. Long-lead electronic product submittals may be made based on the estimated lead time, plus 60 calendar days.
D. All passive communications related equipment (copper, fiber, equipment cabinets, etc.) shall be submitted for review to the airport no earlier than 180 calendar days prior to installation. Where long lead items (greater than 180 calendar days) for procurement are identified, the Contractor shall submit a request in writing, along with evidence from the manufacturer that the item’s lead time is greater than 180 calendar days.
2.3 SOFTWARE
A. The Contractor shall prepare and submit documentation verifying the version of all software provided by the Contractor, and providing confirmation that the proposed software version is in compliance with the specification requirements, the system requirements, and the requirements for integration with other software associated with the system, whether new or existing.
2.4 LICENSING
A. Provide all required licenses for the equipment and software provided.
B. All software licenses shall be perpetual.
C. All software licenses provided under Division 27 shall be registered in the name of Salt Lake
City Department of Airports.
D. Fully licensed software shall be provided for use in the live operational environment as well as testing and training facilities.
E. Hardware changes, other than quantity changes, shall not affect the licenses supplied.
F. It shall be possible to replace any part of the hardware without impacting the working of any license keys.
G. License Key issues shall never cause an outage to a system that is in the live operational environment.
H. Contractor shall provide licensing in accordance with the individual Division 27 specification sections.
Salt Lake City International Airport 27 05 10-8 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
PART 3 – EXECUTION
3.1 GENERAL
A. All equipment shall be installed in a neat and workmanlike manner. All methods of construction that are not specifically described or indicated in the project specifications or drawings shall be subject to the control and approval of the Owner. Equipment and materials shall be of the quality and manufacturer indicated. The equipment specified is based on the acceptable manufacturers listed. Where "or equal” is stated, equipment shall be equivalent in every way to that of the equipment specified, and subject to approval.
1. Where possible, the vertical cable organizers on the left-hand side of a cabinet shall be used for fiber patch cords and the right-hand side vertical cable organizer shall be used for copper patch cords.
B. Verify conduit, raceways by others, boxes, cable trays, ladder racks, handholds and manholes to be utilized have been properly installed in accordance with the project drawings and specifications, BICSI and ANSI/TIA/EIA standards and recommendations.
C. Verify conduit is minimum 1-inch diameter.
D. Verify telecommunications grounding system is properly installed and tested in accordance with the project drawings and specifications, BICSI and ANSI/TIA/EIA standards and recommendations.
E. Verify liquid-carrying pipes are not installed above any Communications Equipment or
Devices. If liquid-carrying pipes are identified, do not proceed with installation without written approval from the Owner.
F. Verify support devices are properly installed.
G. All protected telecommunication terminations require bonding, grounding and a Secondary
Bonding Busbar (SBB).
H. Verify appropriate power is provided to the communications equipment and the plug configurations match the networking equipment to be installed.
I. If any of the above items are verified to be non-compliant with the requirements stated in this
Specification, or with BICSI and ANSI/TIA/EIA standards and recommendations cease all work in the affected area and notify the Owner immediately.
3.2 INSTALLATION
A. Install all communications infrastructure components in accordance with the project drawings and specifications, manufacturer’s installation/configuration procedures, BICSI recommended practices, and ANSI/TIA/EIA standards.
B. Coordinate all work with the Owner and the approved project schedule.
C. During construction, each telecommunications junction box / enclosure to include those used for security components shall be documented in the final installation condition with photos.
Salt Lake City International Airport 27 05 10-9 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
The photos shall be organized based on portion of the building. Each specific box / enclosure shall be easily identifiable either by the filename of the photo, or a label that can be seen in the photos. For boxes / enclosures mounted above ceiling or other inaccessible areas, the photos shall be made available to the Design Team and Program Management Team for review.
Electronic photo files shall be submitted as part of the project close-out documents.
3.3 TESTING, INSPECTION, AND ACCEPTANCE
A. The installation of all communications infrastructure components shall be fully tested and inspected prior to acceptance by the Owner. The following provides the general approach to testing, inspection, and acceptance. Refer to individual specification sections and contract drawings for further requirements.
B. Test results for each test shall be submitted within seven (7) days of the test being completed.
Requests for exceptions to this requirement will be handled on a case-by-case basis via RFI submittal.
C. Structured Cabling System Testing, Inspection, and Acceptance
1. Installation Contractor shall perform any pre-installation and post installation testing on installed components they deem necessary to ensure compliance with the contractual requirements. This testing is not required to be witnessed by the Owner and is for the installation Contractor’s convenience.
2. Testing Contractor shall provide a minimum of ten calendar days’ notice to the Owner prior to commencement of formal testing activities.
3. All structured cabling system testing shall be performed in accordance with Section 27 08
10.
4. Testing results shall be submitted immediately after testing for review and approval.
Testing results shall be approved prior to utilization of the cabling. This requirement is in addition to all as-built submittal requirements.
D. Local Area Network and System Testing, Inspection, and Acceptance – Complete New
Network
1. General:
a. The installation Contractor shall prepare, submit for review, and execute test plans to demonstrate system completion and performance. Except as otherwise specified, the Contractor shall test all components, connections, and subsystems comprising the total system as described in the contract documents as a complete operational system. The phases of testing and acceptance may include the following:
1) Component / Unit testing (prior to installation)
2) Proof-of-Concept Test / Factory Acceptance Testing
3) Functionality and Performance Testing (preceded by system installation)
4) Endurance Testing (preceded by successful functionality and performance testing)
b. Upon contract award the Contractor shall submit an RFI to the Owner to identify and confirm the specific phases of testing that are required for the design package.
Salt Lake City International Airport 27 05 10-10 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
c. Testing shall demonstrate compliance with the specifications and the contract document requirements.
d. The Contractor shall provide a minimum of ten calendar days’ notice to the Owner prior to commencement of formal testing activities.
e. Test Plan/Procedure: The Contractor shall provide electronic copies of the test plan/procedures for each testing phase for the review and approval of the Owner.
The test plan submittals shall be provided in accordance with Section 01 45 00 and the General Conditions of this Contract and submitted a minimum of forty-five
(45) calendar days prior to any planned testing. The test plan for each phase of testing shall detail the objectives of all tests. The tests shall clearly demonstrate that the system and its components fully comply with the requirements specified in the contract drawings and specifications. Test plans shall contain at a minimum:
1) Functional procedures including use of any test equipment
2) Test equipment is to be identified by manufacturer and model
3) Interconnection of test equipment and steps of operation shall be defined
4) Test records shall include test equipment serial number, calibration date and calibration certification of test equipment. All calibrations shall be current.
5) Expected results required to comply with specifications
6) Traceability matrix referencing Specification requirements with specific test procedures
7) Record of test results with witness initials or signature and date performed
8) Pass or fail evaluation with comments
f. The test procedures shall provide conformity to all Specification and manufacturer requirements. Satisfactory completion of the test procedure is necessary as a condition of system acceptance.
g. The Contractor shall review all formal test procedures prepared by the Contractor and deliverable under the contract to assure the tests cover all requirements and that there is a conformity between the conducted test, the test results and
Specification requirements.
h. The Contractor shall provide the Owner the opportunity(s) to observe any or all of tests.
i. Test Reports: The Contractor shall prepare, for each test, a test report document that shall certify successful completion of that test. An electronic copy of the test report shall be submitted to the Owner for review and acceptance. The test report shall contain, at a minimum:
1) Commentary on test results;
2) A listing and discussion of all discrepancies between expected and actual results and of all failures encountered during the test and their resolution;
3) Complete copy of test procedures and test data sheets with annotations showing dates, times, initials, and any other annotations entered during execution of the test;
4) Signatures of persons who performed and witnessed the test.
j. Test Resolution: Any discrepancies or problems discovered during these tests shall be corrected by the Contractor at no cost to Owner. The problems identified in each phase shall be corrected and re-tested before any subsequent testing phase is performed.
Salt Lake City International Airport 27 05 10-11 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
2. Unit / Component testing
a. Upon receipt of system components to be installed, and prior to installation in the field, the Contractor shall perform unit testing to ensure the components are operating as intended.
3. Factory Acceptance Testing / Proof of Concept Testing
a. Test Setup Equipment: Equipment shall be actual products or identical models of products to those designated to be delivered and installed at the site. The following equipment shall be setup and used for conducting pre-delivery test:
1) Operator equipment associated with system.
2) End devices and displays associated with system.
3) Software associated with system.
4) Administrative console equipment.
5) Sufficient signal transmission media (STM) and associated equipment and accessories to provide a fully integrated system model. Include at least one of each type STM circuit.
6) Sample set of field devices for system devices that will be installed at site.
7) Enough load and data simulators to demonstrate the installed network conforms to specification and manufacturer’s requirements (e.g., network links meet the manufacturer’s stated bandwidth throughput, systems meet capacity requirements). Loads shall be manually or software generated.
b. Preparation: Ensure that development of system is complete, required approvals of submittals have been obtained, and sufficient equipment procured to completely demonstrate and test system.
c. Time: Prior to deployment of any equipment to the field. Conduct on weekdays during standard business working hours.
d. Location: Contractor’s offices or other location approved by Owner.
e. Items to be tested shall be set up and performance verified prior to arrival of representatives of Owner at test site.
f. Test: The purpose is to test the complete system and demonstrate that all specified features and performance criteria are met. All requirements of the specification shall be tested including, but not limited to:
1) Functionality including reporting and response.
2) System capacity.
3) Hardware interaction.
4) Hardware and software interaction.
5) Demonstrate report generation.
g. Acceptance: Acceptance of system to perform sufficiently and provide specified functions shall be determined by Owner witnessing the factory acceptance test.
h. Acceptance Criteria: Performance of system shall equal or exceed criteria stated in individual specification sections.
i. If system does not perform satisfactorily, the Contractor shall make corrections and modifications and schedule new test.
Salt Lake City International Airport 27 05 10-12 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
j. Travel related expenses of Owner to attend pre-delivery test shall be borne by
Contractor if testing is conducted more than 50 miles from Salt Lake City. Travel related expenses to attend re-testing shall be borne by Contractor.
k. Completion:
1) At successful completion of test, dismantle equipment so as to prevent damage. Replace all defective or worn items.
2) Re-pack in original containers all equipment to be delivered to site for installation. Mark on containers that items were used in factory test.
l. Reporting:
1) Record all test procedures and results.
2) Submit report to Owner
4. Functionality and Performance Testing
a. Functionality testing will include the software and hardware components of the system and demonstrate that the specified features and performance criteria are met once all components have been installed. All major requirements of the
Specifications shall be tested including:
1) Operational testing of the head-end system
2) Operational testing of end user devices
3) Functionality and response of core system and subsystems
4) A Failure Recovery test procedure shall be conducted. The Failure
Recovery will include a full system failure and recovery procedures.
5) Data interaction
6) System capacity
7) Hardware interaction
8) Hardware and software interaction
9) Integration Interfaces
10) Demonstrate report generation
b. Schedule test with the Owner providing a minimum of ten calendar days’ notice prior to performance. Do not begin testing until:
1) Factory Acceptance Testing / Proof of Concept testing has been successfully completed.
2) All required system elements have been installed and individually and jointly tested to ensure they are operating properly.
3) Written permission from the Owner has been received.
c. Acceptance: Acceptance of system to perform sufficiently and provide specified functions shall be determined by the Owner.
1) Acceptance Criteria: Performance of system shall equal or exceed criteria stated in individual Specification sections.
2) If system does not perform satisfactorily, the Contractor shall make corrections and modifications and schedule new test with Owner.
Salt Lake City International Airport 27 05 10-13 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
3) Completion: Functionality and performance test shall be complete when testing or retesting of each component has produced a positive result and has been approved in writing by the Owner.
d. Reporting:
1) Record all test procedures and results.
2) Submit report to Owner.
e. Termination
1) Test shall be terminated by the Owner when:
a) Individual components, subsystems, or the common use system fail to perform as specified.
b) It is determined that the system is missing components or installation is not complete.
c) Upon termination, corrective work shall be performed and the Test rescheduled with the Owner.
2) Re-testing shall be performed by Contractor at no additional expense.
3) Contractor shall continue to perform corrective actions and re-test until system passes or the Owner terminates testing.
4) Contractor shall have a system rollback plan in case of testing failure to prevent disruption of airline operations.
5. Substantial Completion
a. Once system is fully installed, operational, in use and training is complete, the system will be considered Substantially Complete.
b. Endurance Testing shall not commence until written notice of Substantial
Completion is received.
6. Endurance Testing
a. General:
1) Provide personnel to operate/monitor the system 24 hours per day, including weekends and holidays during Endurance Testing. Remote monitoring is acceptable.
2) Start test after:
a) Successful completion of Functionality and Performance Testing.
b) Training as specified has been completed.
c) Correction of deficiencies has been completed.
d) Receipt of written notice of Substantial Completion and approval to commence Endurance Testing is received from the Owner.
3) Monitor all systems during Endurance Testing. Coordinate monitoring with the Owner.
Salt Lake City International Airport 27 05 10-14 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
4) Recording: Record data on approved forms so as to provide a continuous log of systems performance. Include:
a) Date and time for all entries.
b) Name of individual making entry.
c) Environmental conditions.
d) Airport activities in process.
e) Description of all alarm annunciations, responses, corrective actions, and causes of alarms. Classify as to type of alarm.
f) Description of all equipment failures, including software errors.
g) Description of all maintenance and adjustment operations performed on system.
h) Daily and weekly tabulations.
5) Entries of performance data shall be reviewed by the Owner.
6) Owner may terminate testing at any time when the system fails to perform as specified. Upon termination of testing the Contractor shall commence an assessment period as described in Stage II.
b. Testing
1) Stage I - Initial Phase Testing:
a) Time: 24 hours per day for 10 consecutive calendar days (8 hr./day
Contractor system engineer available onsite during testing period)
b) Make no repairs during this stage unless authorized in writing by the
Owner.
c) If system experiences no emergency, critical failures, or recurring operational failures (defined as same operational failure more than 3 times during 10 days), proceed to Stage III - Final Testing.
2) Stage II - Initial Phase Assessment:
a) After conclusion of Stage I, or terminating of testing, identify all failures, determine causes, and repair. Submit report explaining:
Nature of each failure, corrective action taken, results of tests performed to verify corrective action as being successful, and recommended point for resumption of testing.
b) After submission of report, schedule review meeting at job site.
Schedule date and time with the Owner.
c) At review meeting, demonstrate that all failures have been corrected by performing verification tests.
d) Based on report and review meeting, the Owner will direct Contractor to repeat Stage I, restart Stage I, or proceed to Stage III - Final
Testing.
3) Stage III - Final Phase Testing:
a) Time: 24 hours per day for 15 consecutive calendar days (may be monitored remotely).
Salt Lake City International Airport 27 05 10-15 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
b) Make no repairs during this stage unless authorized in writing by the
Owner.
c) If system experiences no emergency, critical failures, or recurring operational failure (defined as same operational failure 3 times in 24 hours or more than 7 times during 15 days), proceed to Stage IV –
Final Phase Assessment.
4) Stage IV - Final Phase Assessment:
a) After conclusion of Stage III or termination of testing, identify all failures, determine causes, and repair. Submit explaining the nature of each failure, corrective action taken, results of tests performed, and recommended point for resumption of testing.
b) After submission of report schedule review meeting at job site.
Schedule date and time with the Owner.
c) At review meeting, demonstrate that all failures have been corrected by performing verification tests.
d) Based on report and review meeting, the Owner will approve
Endurance Test or direct Contractor to repeat all or part of Stages III and IV.
c. Adjustment, Correction, and Maintenance
1) During Endurance Testing make adjustments and corrections to system only after obtaining written approval of the Owner
2) During Endurance Testing, perform required maintenance on systems including provision of replacement parts.
d. Final Inspection and Acceptance
1) After Endurance Testing is complete, review tabulated records with the
Owner.
2) Contractor will not be responsible for failures caused by:
a) Outage of main power in excess of backup power capability provided that automatic initiation of all backup sources was accomplished and automatic shutdowns and restarts of systems performed as specified.
b) Failure of any Owner furnished power, communications, and control circuits provided failure not due to Contractor furnished equipment, installation, or software.
c) Failure of existing Owner equipment provided failure not due to
Contractor furnished equipment, installation, or software.
d) When performance of system does not fall within the above parameters, determine cause of deficiencies, correct, and retest.
3) Submit final report of Endurance Testing containing all recorded data.
7. Final System Acceptance
a. Upon successful completion of Endurance Testing, written notice of Final System
Acceptance will be provided by the Owner.
Salt Lake City International Airport 27 05 10-16 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
b. Final System Acceptance will mark the beginning of the system Warranty (and
Maintenance if selected) period.
E. Local Area Network Testing, Inspection, and Acceptance – New Network Components to
Existing Network
1. General:
a. The installation Contractor shall prepare, submit for review, and execute test plans to demonstrate the network expansion completion and performance. Except as otherwise specified, the Contractor shall test all new components and connections that have been installed and configured by the Contractor and validate that the installation of new components has not adversely impacted the existing network. In addition to data switches, the network equipment includes all firewalls, routers, appliances added by this contract as well as software added by this contract. The phases of testing and acceptance shall include the following:
1) Component / Unit testing (prior to installation)
2) Functionality and Performance Testing of new components and the overall network
b. Testing shall demonstrate compliance with the specifications and the contract document requirements.
c. The Contractor shall provide a minimum of ten calendar days’ notice to the Owner prior to commencement of formal testing activities.
d. Test Plan/Procedure: The Contractor shall provide electronic copies of the test plan/procedures for each testing phase for the review and approval of the Owner.
The test plan submittals shall be provided in accordance with Section 01 45 00 and the General Conditional of this Contract and submitted a minimum of forty-five
(45) calendar days prior to any planned testing. The test plan for each phase of testing shall detail the objectives of all tests. The tests shall clearly demonstrate that the new components fully comply with the requirements specified in the contract drawings and specifications. Test plans shall contain at a minimum:
1) Visual inspection of installation and connectivity. Confirm equipment, cabling, and labeling.
2) Functional procedures including use of any test equipment. These procedures confirm operation as specified. Sequence of Operations for added equipment shall be confirmed if they are identified for the device being integrated.
3) If testing is to confirm integration between different networks, all parties involved in this testing shall be identified. The Contractor shall coordinate testing with all parties involved in this testing.
4) Test equipment is to be identified by manufacturer and model
5) Interconnection of test equipment and steps of operation shall be defined
6) Test records shall include test equipment serial number, calibration date and calibration certification of test equipment. All calibrations shall be current.
7) Expected results required to comply with specifications
8) Record of test results with witness initials or signature and date performed
9) Pass or fail evaluation with comments
Salt Lake City International Airport 27 05 10-17 Issued for Bid
SURPLUS CANAL RELOCATION November 6, 2026
e. The test procedures shall provide conformity to all Specification requirements.
Satisfactory completion of the test procedure is necessary as a condition of system acceptance.
f. The Contractor shall review all formal test procedures prepared by the Contractor and deliverable under the contract to assure the tests cover all requirements and that there is a conformity between the conducted test, the test results and
Specification requirements.
g. The Contractor shall provide the Owner the opportunity(s) to observe any or all of tests.
h. Test Reports: The Contractor shall prepare, for each test, a test report document that shall certify successful completion of that test. An electronic copy of the test report shall be submitted to the Owner for review and acceptance. The test report shall contain, at a minimum:
1) Commentary on test results;
2) A listing and discussion of all discrepancies between expected and actual results and of all failures encountered during the test and their resolution;
3) Complete copy of test procedures and test data sheets with annotations showing dates, times, initials, and any other annotations entered during execution of the test; and
4) Signatures of persons who performed and witnessed the test.
i. Test Resolution: Any discrepancies or problems discovered during these tests shall be corrected by the Contractor at no cost to Owner. The problems identified in each phase shall be corrected and re-tested before any subsequent testing phase is performed.
2. Pre-Field Installation Unit / Component testing
a. Upon receipt of network components to be installed, and prior to installation in the field, the Contractor shall perform unit testing to ensure the components are operating as intended.
b. Prior to field installation the Contractor shall validate that all required programming and device/component configurations have been properly implemented in both the individual device/component as well as any existing components that require modifications to accommodate the new device/component.
3. Post Field Installation Functionality and Performance Testing
a. After successful completion of component testing and the validation of all required programming / configuration, the Contractor shall perform functional and performance testing to ensure the new components are operating properly and have not adversely impacted the operation of the overall network. The following elements shall be tested on each installed network switch, as a minimum:
1) Administrative Access available
2) Switch management and SNMP queries available
3) Both links…