About this file

This document is a 30% Technical Specifications Outline for the Town of Frisco's Well 7 PFAS Mitigation Improvements project, prepared by Plummer Associates in May 2024. The specifications outline covers multiple divisions of construction requirements, including procurement, general requirements, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, electrical, earthwork, utilities, process interconnections, and process equipment. The document utilizes the 2023 version of the Construction Manager at Risk (CMAR) EJCDC contract documents and provides a comprehensive technical breakdown of expected construction specifications across 11 detailed divisions, ranging from basic administrative requirements to specific technical installation and equipment guidelines.

The specifications indicate a complex water treatment facility improvement project focusing on PFAS (Per- and Polyfluoroalkyl Substances) mitigation, with extensive technical requirements for construction, equipment installation, piping, electrical systems, control systems, and process interconnections. The outline suggests the project will involve constructing a new building, installing media pressure vessels, associated piping and equipment, electrical and instrumentation systems, approximately 400 linear feet of 8-inch buried pipe, chemical storage rooms, a new driveway, and site improvements. The technical specifications provide highly detailed guidelines for contractors, covering everything from concrete forming and reinforcing to specialized process measurement instrumentation, control system configurations, and purification equipment specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4131-002-09 Page - 1 May 2024

Town of Frisco Well 7 PFAS Mitigation Improvements

30% TECHNICAL SPECIFICATIONS OUTLINE

DIVISION 0: PROCUREMENT AND CONTRACTING REQUIREMENTS

This project is planned to utilize the 2023 version of the Construction Manager at Risk EJCDC contract documents. The following sections are not an all-inclusive list but are intended to provide reference to the major components of this Division.

CMAR-200 Request for Qualifications —Construction Manager at Risk Series

CMAR-422 Proposal—Construction Manager at Risk Series

CMAR-525 Agreement between Owner and Construction Manager at Risk

CMAR-700 Standard General Conditions of the Construction Manager at Risk Contract

CMAR-800 Supplementary Conditions of the Construction Manager at Risk Contract

DIVISION 1: GENERAL REQUIREMENTS

01 10 00 Summary of Work

Section summarizes the Work of the Project as covered in detail in the complete Contract Documents.

01 20 00 Price and Payment Procedures

Section explains what is and what is not included in a section item, and the limits or cut-off points, including costs in connection with the proper and successful completion of the work, including furnishing all materials, equipment, supplies, and appurtenances; providing all construction, equipment and tools; and performing all necessary labor and supervision to fully complete the work.

01 31 00 Project Management and Coordination

Section includes the following administrative and procedural requirements for project meetings, including the preconstruction conference, coordination schedules, progress meetings, and coordination meetings. Includes Schedules and Reports, initial coordination of submittals, construction progress schedule, construction progress reports, schedule of values, special reports, and list of subcontractors and major suppliers.

01 32 00 Construction Progress Documentation

Section specifies administrative and procedural requirements for construction photographs.

01 33 00 Submittal Procedures

Section includes definitions, descriptions, transmittal, and review of submittals.

4131-002-09 Page - 2 May 2024

01 41 00 Regulatory Requirements

The Contractor is responsible for gaining approval as required for Owner occupancy within contract schedule requirements and make any and all adjustments or modifications as required to conform to ordinances and regulations.

01 42 00 References

Basic contract definitions used in the Contract Documents are defined in the General Conditions.

Definitions and explanations are not necessarily either complete or exclusive but general for the Work.

01 43 00 Quality Assurance

Section includes basic requirements for services to be performed at the Project Site in regard to erection, start-up, and testing of equipment.

01 45 00 Quality Control

Section includes contractor responsibility for quality control and shall establish and maintain an effective quality control system in compliance with these specifications. The Contractor Quality Control (CQC) system shall consist of plans, procedures, and organization necessary to provide materials, equipment, workmanship, fabrication, construction, and operations, both on-site and off-site, that complies with contract requirements and is keyed with the construction schedule

01 50 00 Temporary Facilities and Controls

Section includes requirements for temporary field offices and other structures required for office and storage space required by Contractor and Engineer. Also, the requirements of a temporary nature not normally incorporated into final Work. It includes the utility services, construction and support facilities, construction aids, safety and health, and fire protection

01 60 00 Product Requirements

Provide products that comply with the Contract Documents, that are undamaged and, unless otherwise specified or indicated, new at the time of installation.

01 70 00 Execution and Closeout Requirements

Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following: inspection procedures; project record document submittal; instruction book and operating manual submittal; submittal of warranties; and final cleaning. Closeout requirements for specific construction activities are included in the appropriate Sections.

01 79 00 Starting Demonstration and Testing of Process Systems

Section includes start-up, pre-demonstration and demonstration of facility, systems or equipment;

personnel training; related systems start-up and demonstration period requirements.

4131-002-09 Page - 3 May 2024

DIVISION 3: CONCRETE

00 11 00 Concrete Forming

Section covers designing, furnishing, erecting, and removing forms for cast-in-place concrete.

03 15 00 Concrete Accessories

Section covers cast-in-place accessories for cast-in-place concrete.

03 20 00 Concrete Reinforcing

Section covers the furnishing and installation of steel bars and welded wire fabric for concrete reinforcement.

03 30 00 Cast-in-Place Concrete

Section covers cast-in-place concrete, including furnishing materials, transporting, placing, finishing, curing, and other appurtenant items of construction.

03 60 00 Grouting

Section covers sand-cement grout, cementitious, non-shrink grout, epoxy non-shrink grout, epoxy-bonding agent, and where each is to be used.

DIVISION 4: MASONRY

04 20 00 Unit Masonry

Section covers standard unit masonry products, accessories, and installation.

04 43 13 Adhered Stone Masonry

Section covers exterior masonry veneer products, accessories, and installation.

DIVISION 5: METALS

05 05 19 Post Installed Concrete Anchors

Section covers the use of anchors for safety-related applications, such as structural connections, earthquake bracing, guard rails, mechanical and electrical equipment support, piping and ductwork support and bracing, cladding and façade connections, or rebar doweling.

05 50 00 Metal Fabrications

Section includes items fabricated from metal shapes, plates, sheets, pipe, or cast metal except component parts of equipment.

4131-002-09 Page - 4 May 2024

DIVISION 6: WOOD, PLASTICS & COMPOSITES

06 10 00 Rough Carpentry

Section specifies wood blocking, framing, sheathing, furring, nailers, sub-flooring, rough hardware, and light wood construction.

06 16 00 Sheathing

Section includes boards, dimensional lumber, engineered wood products, plywood, sheathing and other related items of construction.

06 74 00 Composite Gratings

Section includes fiberglass covered grating and appurtenances, fiberglass reinforced plastic I-Bar open mesh grating, and protruded fiberglass reinforced plastic structural shapes for grating.

DIVISION 7: THERMAL AND MOISTURE PROTECTION

07 21 00 Thermal Insulation

Section includes foundation wall insulation (supporting backfill), cavity wall insulation, and concealed building insulation, and weather barriers.

07 22 00 Roof and Deck Insulation

Section covers the requirements for insulation materials used below built-up roofing and single ply roofing systems.

07 25 00 Weather Barriers

Section covers wall sheathing with integral water-resistive barriers and air barriers.

07 27 26 Fluid Applied Membrane Air Barriers

Section covers fluid applied vapor permeable air barrier at exterior above grade wall assemblies and connections to adjacent air barrier components providing a durable, continuous, full building air barrier.

07 41 13 Standing Seam Metal Roof Panels

Section includes galvanized standing seam metal roof panels, soffit panels, and accessories.

07 46 46 Fiber Cement Siding

Section includes fiber-cement lap siding and fiber-cement standing and running trim.

07 62 00 Sheet Metal Flashing and Trim

Section includes manufactured and sheet metal flashing as well as gutters and downspouts.

4131-002-09 Page - 5 May 2024

07 72 00 Roof Accessories

Section includes roof curbs for rooftop equipment and roof screening devices to conceal rooftop equipment.

07 92 00 Joint Sealants

Section includes joint sealants for interior and exterior horizontal, sloped and vertical applications, as well as fire safe firestopping sealants for rated assemblies. It also includes backer rod and compressible filler.

DIVISION 8: OPENINGS

08 11 13 Hollow Metal Doors and Frames

Section includes hollow doors and frames, fire-rated doors and fire-Rated, Borrowed-Light Frame Assemblies, and fire-rated window frames.

08 45 23 Insulated Translucent Panel Systems

Section includes flat factory prefabricated structural insulated translucent sandwich panels, installation system, and aluminum sill flashing.

08 33 23 Overhead Coiling Doors

Section includes overhead coiling doors.

08 71 00 Door Hardware

Section includes commercial door hardware for swinging doors and other doors to the extent indicated, and cylinders for doors specified in other Sections.

08 80 00 Glazing

Section includes glazing systems capable of withstanding normal thermal movement and wind and impact loads without failure, including loss or glass breakage attributable to the following: defective manufacture, fabrication, and installation; failure of sealants or gaskets to remain watertight and airtight; deterioration of glazing materials; or other defects in construction.

DIVISION 9: FINISHES

09 91 13 Exterior Painting

Section includes protective coatings applied to exterior surfaces of the building structure; including walls, soffits, trim, and other surfaces as specified.

09 91 23 Interior Painting

Section includes protective coatings applied to interior surfaces of the building structure; including walls, trim, and other surfaces as specified.

4131-002-09 Page - 6 May 2024

09 97 00 Special Coatings

Section includes coating of pipe and other process materials throughout the Project including surface preparation, prime coat (first coat), finish coats (second and third coats), inspection, cleaning, and touch-up of surfaces and equipment. Shop preparation, prime coat, and finish coats to be shop-applied, may be specified elsewhere, so that a complete system is specified and coordinated.

DIVISION 23: HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 Basic HVAC Requirements

Section includes basic requirements for HVAC installation and includes requirements common to more than one (1) section of Division 23.

23 01 00 HVAC and Electrical Coordination

Section includes the coordination requirements between Division 23 (HVAC) and Division 26 (Electrical).

23 05 00 Common Work Results for HVAC

Section includes basic requirements for materials and methods required to provide for a complete installation of all equipment.

23 05 13 HVAC/Electrical Requirements for Mechanical Equipment

Section includes the basic requirements for Electrical components for HVAC equipment. The components include, but are not limited to, motors, starters, and disconnect switches for mechanical equipment.

23 05 14 Motor Controllers

Section includes the basic requirements for motor controllers for HVAC equipment.

23 05 29 Hangers and Supports for HVAC Equipment

Section includes equipment supports.

23 05 53 HVAC Identification

Section includes Labels, stencils, and tags.

23 05 93 Testing, Adjusting, and Balancing for HVAC

Section includes testing and Balancing of Environmental Systems including but not limited to air distribution systems, and the equipment and apparatus connected thereto.

23 09 10 Electronic Control Systems of HVAC

Section includes thermostats for heating units and dampers actuators for motorized dampers.

4131-002-09 Page - 7 May 2024

23 11 23 Facility Natural Gas Piping

Section includes natural gas piping and specialties.

23 31 13 Metal Ducts

Section includes material and installation requirements for ductwork and ductwork sealant.

23 33 00 Air Duct Accessories

Section includes accessories for ductwork including assembly and operations.

23 34 00 HVAC Fans

Section includes fans.

23 37 13 Air Outlets & Inlets

Section includes louvers.

23 82 39 Terminal Heat Units

Section includes unit heaters with electric-resistance heating.

DIVISION 26: ELECTRICAL

26 00 00 Electrical General Provisions

Section specifies general electrical work requirements, provisions for performing the work, and requirements for basic materials and methods.

26 05 19 Low Voltage Electrical Power Conductors

Section includes building wires and cables as well as connectors, splices, and terminations rated 600V and less.

26 05 26 Grounding and Bonding for Electrical Systems

Section includes methods and materials for grounding systems and equipment plus the underground distribution grounding and common ground bonding with lightning protection systems.

26 05 29 Hangers and Supports for Electrical Systems

Section includes hangers and supports for electrical equipment and systems along with construction requirements for concrete bases.

26 05 33 Raceways and Boxes for Electrical Systems

Section includes raceways, fittings, boxes, enclosures, and cabinets for electrical wiring.

26 05 43 Underground Ducts and Raceways for Electrical Systems

Section includes conduit, ducts, and duct accessories for concrete-encased duct banks and in single duct runs along with handholes, boxes, and manholes.

4131-002-09 Page - 8 May 2024

26 05 53 Identification for Electrical Systems

Section includes identification requirements for raceway, conductors, communication and control cable, warning labels and signs, instruction signs, equipment identification labels, and miscellaneous identification products.

26 05 73 Power System Studies

Section includes requirements for short circuit analysis, protective device coordination, and arc flash and electrical hazard studies.

26 24 16 Panelboards

Section includes panelboard and enclosure work including cabinets and circuit breakers for existing panelboards.

26 27 26 Wiring Devices

Section includes wall switches, single and three phase receptacles, device plates, service fittings, and occupancy sensors.

26 28 16 Enclosed Switches and Circuit Breakers

Section includes individually mounted, enclosed switches and breakers including fusible switches, non-fusible switches, molded-cast circuit breakers, and enclosures.

26 29 03 Low-Voltage Pilot Control Devices

Section includes electrical control devices for panels, motor controllers, control stations, etc. Devices include Pilot devices, Relays and timers, Miniature circuit breakers, terminal blocks, fuse blocks, power supplies, signal conditioners and isolators.

26 29 23 Low-Voltage Variable-Frequency Motor Controllers

Section includes individually mounted, enclosed, adjustable or variable frequency motor controllers.

26 41 00 Facility Lightning Protection

Section provides requirements for lightning protection systems for structures, internal and external operational equipment, contents and occupants by preventing lightning damage.

DIVISION 31: EARTHWORK

31 12 00 Selective Clearing

Section includes site preparation activities and certain items of earthwork common to other related Work.

31 22 00 Grading

Section includes rough and finish grading, and topsoil spreading.

4131-002-09 Page - 9 May 2024

31 23 00 Excavation and Fill

Section includes all necessary excavation, filling, and backfilling for structures and all related Work, including manholes.

31 23 16 Excavation Support and Protection

Section includes requirements for temporary support and protection systems.

DIVISION 32: EXTERIOR IMPROVEMENTS

32 11 23 Aggregate Base Courses

Section includes requirements for crushed rock base course for roadways and parking areas.

32 16 00 Curbs, Gutters, Sidewalks, and Driveways

Section includes concrete requirements for curbs, gutters, sidewalks, and driveways.

DIVISION 33: UTILITIES

33 01 10.58 Disinfection of Potable Water Piping and Tanks

Section includes requirements for disinfection of potable water pipe, fittings, and storage facilities as indicated or specified.

33 05 05 Buried Piping Installation

Section includes handling, installation and testing of pipe, fittings, specialties, and appurtenances as indicated or specified.

33 05 19 Ductile Iron Utility Pipe

Section includes ductile iron non-pressure pipe and fabricated fittings in nominal sizes 4-inches and greater.

33 05 31.11 Polyvinyl Chloride Gravity Sewer Pipe

Section includes Polyvinyl Chloride (PVC) non-pressure pipe and fabricated fittings in nominal sizes 4-inches and greater.

DIVISION 40: PROCESS INTERCONNECTIONS

40 05 05 Exposed Piping Installation and Testing

Section includes requirements for all installation and testing for exposed process pipe.

40 05 06 Couplings, Adapters, and Specials for Process Piping

Section includes flexible mechanical couplings, flanged adapters, various expansion joints for piping, and dielectric connections.

4131-002-09 Page - 10 May 2024

40 05 07 Hangers and Supports for Process Piping

Section includes requirements for pipe and equipment hangers, supports, anchors, saddles and shields.

40 05 19 Ductile Iron Process Pipe

Section includes requirements for ductile iron pipe and appurtenances.

40 05 31 Thermoplastic Process Pipe

Section includes Polyvinyl Chloride (PVC) Process Pipe for process water, foul air, and chemical feed service; Chlorinated Polyvinyl Chloride (CPVC) Process Pipe for chemical feed service; and PVC & CPVC fittings

40 05 52 Miscellaneous Valves and Appurtenances

Section includes miscellaneous valves for process equipment and piping, including swing check valves.

40 05 61 Gate Valves

Section includes gate valves for process equipment and piping.

40 05 63 Ball Valves

Section includes ball valves for process equipment and piping.

40 05 64 Butterfly Valves

Section includes butterfly valves for process equipment and piping.

40 05 91 Common Control Panel Requirements for Process Equipment

Section includes requirements for process equipment control panels.

40 08 00 Field Testing of Process Interconnections

This section describes the necessary labor, materials and equipment, including test pumps, gauges, and temporary valves and piping, to perform the testing operations of specified piping systems.

40 61 00 Instrumentation and Control System General Provisions

Section describes general requirements for control systems

40 61 01 Instrumentation and Control System References and Abbreviations

Section includes references to various abbreviations used in control systems

40 61 21 Instrumentation and Control System Testing and Commissioning

Section describes testing requirements for control systems

40 61 93 Control System Input-Output List

Section includes requirements for inputs and outputs to the control system

4131-002-09 Page - 11 May 2024

40 61 96 Control System Configuration

Section describes the control system operation and includes control descriptions for the facility processes.

40 63 43 Programmable Logic Controllers

Section describes requirements for programmable logic controllers

40 71 00 Flow Measurement

Section includes requirements for flow measurement devices

40 73 00 Pressure, Strain and Force Measurement

Section includes requirements for pressure measurement instrumentation

40 74 00 Temperature Measurement

Section includes requirements for temperature measurement instrumentation

DIVISION 43: PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT

43 23 13.19 Pump, Self-Priming Centrifugal

Section includes requirements for self-priming centrifugal pumps.

43 31 13.13 Activated Carbon Gas and Liquid Purification Filters

Section includes requirements for granular activated carbon or ion exchange media treatment vessels.

Media type is undetermined.

43 31 13.29 Pretreatment Cartridge Purification Filters

Section includes requirements for pretreatment cartridge filters.

END OF OUTLINE SPECIFICATIONS