03. Blank Form for Contractor_s Proposal.xlsx
XLSX spreadsheet 74 KB Posted
- Attached to
- SOR Waterline Repair
- Solicitation number
- FA940126R0023
About this file
This is a blank construction cost estimate breakdown form template for contractor proposals related to the SOR Waterline Repair project at Kirtland Air Force Base (KAFB). The form provides a standardized format for offerors to submit detailed cost breakdowns organized across seven major cost categories: General Requirements, Site Work, Tank and Equipment, Pipe and Valves, Electrical, Booster Pump, and Spare Parts. Each line item requires contractors to itemize material costs (unit price and total), labor costs (manhours/mandays and average rate), and other direct costs, with calculations flowing to line totals and ultimately a grand total including overhead and profit.
The template is structured with 10 columns capturing item descriptions, units of measure (such as linear feet, cubic yards, each), quantities, material unit and total costs, labor manhours and rates, other direct costs for specialized equipment, and line item totals. Specific scope elements embedded in the form include a 15,000-gallon welded steel reservoir with booster pump installation at Pump Station 2, a 5,000-gallon tank at the SOR site, approximately 7,900 feet of 8-inch pressure class 350 Ductile Iron Pipe (DIP), SCADA system upgrades, electrical infrastructure, valve assemblies, site work including trench excavation and fence installation, and spare parts inventory. The instructions require contractors to submit supporting cost or pricing data, grant the contracting officer audit rights to verify cost and pricing data, and provide clear disclosure of estimating processes, judgmental factors, and contingencies. This blank form is intended to be completed and submitted by contractors as part of their proposal response to the solicitation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Sheet
INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN FORM
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | ||||
| permit itemizing of all direct costs. | ||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | ||||
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | ||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | ||||
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will | ||||
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. | ||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | ||||
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||||
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | ||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | ||||
| and of significant dollar value. | ||||
| Col 10 Line Total. Self-explanatory. | ||||
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | ||||
| page as follows. | ||||
| SOR Waterline | ||||
| Controlled Unclassified Information | ||||
| MIN CONS | TOTAL | |||
| TOTAL MATERIAL AND LABOR COSTS |
TOTAL OTHER DIRECT COSTS
DESIGN COSTS
TOTAL DIRECT COSTS
GENERAL CONDITIONS
OVERHEAD
PROFIT
NMGRT
BOND
TOTAL PRICE
DATE : FIRM NAME :
TITLE : BY :
INSTRUCTIONS TO OFFERORS
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and |
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from |
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data |
| (see ASPR 3-807.3(e) and 3-807.4) |
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this |
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and |
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of |
| a. The existing, verifiable data. |
| b. The judgmental factors applied in projecting from known data to the estimate, and |
| c. The contingencies used by the offeror in his proposed price. |
| In short, the offeror' s estimating process itself needs to be disclosed. |
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), |
| and made available to the contracting officer or his authorized representative upon request. |
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate |
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection |
| with any negotiations prior to contract award. |
(Reverse of Construction Cost Estimate Breakdown Form)
CUI
CUI
Recap
| Controlled Unclassified Information | |||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET: | RECAP | |||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| SOR Waterline | ||||||||||
| PURCHASE REQUEST NUMBER | MHMV250008 | WORK LOCATION : | Kirtland AFB | |||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE* | UNIT COSTS** | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| 1 | General Requirements |
| 2 | Site Work |
| 3 | Tank and Equipment |
| 4 | Pipe and Valves |
| 5 | Electrical |
| 6 | Booster Pump |
| 7 | Spare Parts |
| Subtotal |
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |
| (Construction Cost Estimate Breakdown Form ) |
CUI
CUI
General Requirements
| Controlled Unclassified Information | ||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET: General Requirements | |||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| SOR Waterline | ||||||||||
| PURCHASE REQUEST NUMBER | MHMV250008 | WORK LOCATION : | Kirtland AFB | |||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE* | UNIT COSTS** | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| 1 | Project Manager |
| 2 | Field Superintendent |
| 3 | Mob/Demob |
| 4 | Submittals |
| 5 | As-Built Drawings |
| 6 | Traffic control |
| 7 | Construction and geotechnical survey |
| 8 | Storm Water Polution Prevention Plan (SWPPP) |
| Subtotal |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| (Construction Cost Estimate Breakdown Form ) |
CUI
CUI
Site Work
| Controlled Unclassified Information | |||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET: | Site Work | |||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| SOR Waterline | ||||||||||
| PURCHASE REQUEST NUMBER | MHMV250008 | WORK LOCATION : | Kirtland AFB | |||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE* | UNIT COSTS** | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| 1 | Clearing & grubbing, cut & chip light trees, to 6" diameter | Acre | ||||
| 2 | Trench excavation and backfill | L.C.Y. | ||||
| 3 | Chain link fence gates and posts, chain link fence gates and posts, 8' high, excludes excavation | L.F. | ||||
| 4 | Fence, chain link, Internal 2-1/2" post, 1-5/8" rail, 2" mesh, 8' high | C.L.F. | ||||
| 5 | Haul-off and disposal of excess | CY | ||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 6 | Concrete thrust blocking (complete) | CY | ||||
| 7 | Surface restoration - Paved areas | LF | ||||
| 8 | Surface restoration - Unpaved areas | LS | ||||
| 9 | Reservoir foundation & excavation | CY | ||||
| 10 | Site grading, drainage, restoration | LS | ||||
| 11 | Strurctural fill and compaction | CY | ||||
| 12 | Sand Bedding for pipe base 8" | TON | ||||
| 13 | ||||||
| SubTotal | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||
| (Construction Cost Estimate Breakdown Form ) |
Tank and Equip
| Controlled Unclassified Information | |||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET: | Tank and Equip | |||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| SOR Waterline | ||||||||||
| PURCHASE REQUEST NUMBER | MHMV250008 | WORK LOCATION : | Kirtland AFB | |||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE* | UNIT COSTS** | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| 1 | Furnish and install 15,000 gal welded steel reservoir. | LS | ||||
| 2 | Disinfect and testing of reservoir | LS | ||||
| 3 | Interior multi-coat system (NSF-61) | LS | ||||
| 4 | External paint of reservoir | LS | ||||
| 5 | Thrust blocking for site piping | LS | ||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 6 | Furnish and install 5,000 gal welded steel reservoir, at SOR site | LS | ||||
| 7 | ||||||
| 8 | ||||||
| SubTotal | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||
| (Construction Cost Estimate Breakdown Form ) |
Pipe and Valves
| Controlled Unclassified Information | |||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET: | Pipe and Valves | |||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| SOR Waterline | ||||||||||
| PURCHASE REQUEST NUMBER | MHMV250008 | WORK LOCATION : | Kirtland AFB | |||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE* | UNIT COSTS** | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| 1 | 8" DIP, pressure class 350 | L.F. | ||||
| 2 | Joint restraints | EA | ||||
| 3 | 8" Butterfly valve assembly (complete) | EA | ||||
| 4 | Altitude valve assembly (complete) | EA | ||||
| 5 | Automatic air release valve assembly | EA | ||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 6 | Tee, fittings and connections | LS | ||||
| 7 | 8" douple check valve assembly | EA | ||||
| 8 | Hydrostatic testing & disinfection | LF | ||||
| 9 | Waterline utility marker tape | LS | ||||
| 10 | Waterline tracer wire | LS | ||||
| 11 | Tracer wire test stations | Ea. | ||||
| 12 | ||||||
| SubTotal | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||
| (Construction Cost Estimate Breakdown Form ) |
Cost and quantities obtained from SME and RS Means.
Electrical
| Controlled Unclassified Information | |||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET: | Electrical | |||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| SOR Waterline | ||||||||||
| PURCHASE REQUEST NUMBER | MHMV250008 | WORK LOCATION : | Kirtland AFB | |||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE* | UNIT COSTS** | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| 1 | SCADA system upgrade | LS | ||||
| 2 | Reservoir level & telemetry system | LS | ||||
| 3 | Install water meters with data logging | EA | ||||
| 4 | Leak detection: ultrasonic flow sensers | EA | ||||
| 5 | Cathodic protection | LS | ||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 6 | Electric service for pump station | LS | ||||
| 7 | Service and conduit from main panel booster pump and tank line and connection | LS | ||||
| 8 | ||||||
| SubTotal | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||
| (Construction Cost Estimate Breakdown Form ) |
Booster Pump
| Controlled Unclassified Information | |||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET: | Booster Pump | |||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| SOR Waterline | ||||||||||
| PURCHASE REQUEST NUMBER | MHMV250008 | WORK LOCATION : | Kirtland AFB | |||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE* | UNIT COSTS** | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| 1 | Hoist for pump station #2 | LS | ||||
| 2 | Booster pump in 6'x6' precast vault | LS | ||||
| 3 | Pump electrical & controls integration | LS | ||||
| 4 | Pump skid bypass and isolation valves | LS | ||||
| 5 | SOR Premanufactured Pump Station (Enclosed in item 8 below) | LS | ||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 | ||||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 6 | SOR Pump electrical & controls integration | LS | ||||
| 7 | SOR Water Tank and Pump skid bypass and isolation valves (At Factory) | LS | ||||
| 8 | Packaged Pump Station Building (12'x20') | LS | ||||
| 9 | ||||||
| SubTotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||
| (Construction Cost Estimate Breakdown Form ) |
Spare Parts
| Controlled Unclassified Information | ||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET: Spare Parts | |||
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| SOR Waterline | ||||||||||
| PURCHASE REQUEST NUMBER | MHMV250008 | WORK LOCATION : | Kirtland AFB | |||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE* | UNIT COSTS** | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| 1 | 8" DIP, pressure class 350 | L.F. |
| 2 | Joint restraints | EA |
| 3 | 8" Butterfly valve assembly (complete) | EA |
| 4 | Automatic air release valve assembly | EA |
| 5 | Tee, fittings and connections | LS |
| 6 | Complete solar cell panel and gel battery backup kit | EA |
| 7 | Attitude valve assembly (complete) | EA |
| 8 | One Spare Booster pump | LS |
| 9 | ||
| Subtotal |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| (Construction Cost Estimate Breakdown Form ) |