03-01 SOW Attachment 01 - VHA Required Div 01 Spec Sections.docx

DOCX document 19 KB Posted

Attached to
C1DZ--402-23-794 Modernize Campus Corridors Federal contract opportunity
Solicitation number
36C24123R0017
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document is a request for qualification statements for architectural and engineering services for a modernization project at a VA medical center. The selected firm will provide design phase and construction period services to modernize campus corridors at the VA Maine Healthcare System in Augusta, Maine. Design phase services include site visits, studies, drawings, specifications, and cost estimates to replace flooring, roofing, finishes, and improve HVAC systems. Construction period services include bid analysis, responding to contractor questions, site visits during construction, submittal reviews, and record drawing preparation. The project falls under NAICS code 541310 for architectural services, with a size standard of $11 million in average annual revenue. The opportunity is set aside for verified Service-Disabled Veteran Owned Small Businesses. Qualification statements are due by April 14, 2023. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 is the agency issuing this request.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this Modernize Campus Corridors project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements

File details come from the government source that posted it. Updated .