About this file
This is a Schedule of Prices Worksheet for the Paul Todd Abandoned Mine Land Reclamation Project, prepared for the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality. The project encompasses comprehensive site reclamation work across approximately 36 acres in Marion County, Iowa, with sealed bids due September 8, 2026 at 2:00 p.m. CDT. A pre-bid conference is scheduled for August 28, 2026 at 10:45 a.m. at the Marion County Extension Office in Knoxville, Iowa. The scope of work includes 43 line items covering mobilization, site clearing and preparation (35.8 acres), off-site waste disposal (50 tons), excavation (351,000 cubic yards), construction of terraces (6,300 linear feet), installation of various drainage pipe materials totaling approximately 1,900 linear feet, placement of riprap and stone filters, soil amendments including agricultural lime (1,155.5 tons) and nitrogen fertilizer, field fence installation (1,442 linear feet combined), seedbed preparation (34.1 acres), and permanent seeding of native and wetland mixes (34.1 acres). Work must commence within fourteen days of Notice-to-Proceed and be completed by December 31, 2027.
Bidders must submit pricing for all 43 line items on the Schedule of Prices Worksheet, with unit prices calculated according to IMPACS requirements, which specify that fractional quantities must be entered as lump sum amounts. Bid security equal to 10% of the total bid amount is required. The estimated project cost ranges between $1.2 million and $1.3 million. Bids are submitted electronically through the Iowa Management of Procurement and Contracts System (IMPACS), and bidders must also complete a Bond Form and Targeted Small Business Enterprise Reporting Form. The project is subject to Davis-Bacon Wage Requirements. Plans and specifications are available through the IDALS website, prepared by Shive-Hattery, Inc. Written technical questions are due by September 2, 2026, and should be directed to Michael Otten, P.E., at Shive-Hattery, Inc., or Matt McDonald, Project Coordinator, at the Iowa Department of Agriculture and Land Stewardship.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAUL TODD AML RECLAMATION PROJECT DOCUMENT C (06/2026)
BID NO. IA-343 PROPOSAL AND SCHEDULE OF PRICES – WORKSHEET
C-1
SCHEDULE OF PRICES WORKSHEET
(ENTER AMOUNTS IN IMPACS)
“IMPACS does not recognize fractional or decimal quantities less than one (1). Unit prices for fractional quantities shall be entered as one (1) lump sum as the bid price to perform the required work. For example, a work item may require a unit price equal to $1000/acre, but if work item involves only three-tenths (0.3) of one acre, then the lump sum bid entered on IMPACS would be $300 for that work item.”
ITEM
NO. DESCRIPTION
SECTION
ESTIMATED
QUANTITY UNIT UNIT PRICE TOTAL
1 MOBILIZATION 02100 1 LS
SITE CLEARING AND
PREPARATION 02100 35.8 ACRE
3 OFF SITE WASTE DISPOSAL 02100 50 TON
4 BRUSH PILES 02100 5 EA
APPROVED SEDIMENT
CONTROL MEASURES 02120 2,440 LF
6 SILT FENCE 02120 1,415 LF
7 FILTER SOCK 02120 240 LF
8 RECP, TYPE 3.B 02120 4,840 SY
STABILIZED CONSTRUCTION
ENTRANCE - GRANULAR
SURFACING 02120 40 TON
10 CLASS 'E' RIPRAP 02120 1,000 TON
STONE FILTER (3" MACADAM
STONE) 02120 284 TON
12 EXCAVATION 02200 351,000 CY
13 TERRACES 02300 6,300 LF
14 CMP RISER-TERRACE (10") 02300 3 EA
15 CMP RISER-TERRACE (12") 02300 1 EA
16 CMP RISER-TERRACE (18") 02300 4 EA
17 CMP RISER-TERRACE (24") 02300 1 EA
18 HDPE PIPE (8") 02300 501 LF
19 HDPE PIPE (10") 02300 142 LF
20 HDPE PIPE (12") 02300 707 LF
21 HDPE PIPE (18") 02300 79 LF
22 PIPE OUTLET (8") 02300 3 EA
23 PIPE OUTLET (12") 02300 3 EA
24 PIPE OUTLET (18") 02300 1 EA
PAUL TODD AML RECLAMATION PROJECT DOCUMENT C (06/2026)
BID NO. IA-343 PROPOSAL AND SCHEDULE OF PRICES – WORKSHEET
C-2
“IMPACS does not recognize fractional or decimal quantities less than one (1). Unit prices for fractional quantities shall be entered as one (1) lump sum as the bid price to perform the required work. For example, a work item may require a unit price equal to $1000/acre, but if work item involves only three-tenths (0.3) of one acre, then the lump sum bid entered on IMPACS would be $300 for that work item.”
ITEM
NO. DESCRIPTION
SECTION
ESTIMATED
QUANTITY UNIT UNIT PRICE TOTAL
STRUCTURE - CONCRETE
RISER (48") 02310 3 EA
26 PPHP PIPE (12") 02310 132 LF
27 PPHP PIPE (18") 02310 160 LF
28 PPHP PIPE (24") 02310 143 LF
WETLAND UNDERCUT AND
REPLACEMENT 02400 3.6 ACRE
30 DEEP RIPPING, SUBGRADE 02400 7.8 ACRE
31 AGRICULTURAL LIME 02400 1,155.5
TON
ECCE
MULCH, SUBGRADE (5
TONS/ACRE) 02400 39.4 ACRE
NITROGEN, N, WETLAND
FERTILIZER (30 LBS/ACRE) 02400 108 LBS
34 SUBGRADE PREPARATION 02400 35.8 ACRE
35 FIELD FENCE INSTALLATION 02500 342 LF
FIELD FENCE, REMOVE AND
REPLACE 02500 1,100 LF
37 SEEDBED PREPARATION 02700 34.1 ACRE
NITROGEN, N, SEEDING (50
LBS/ACRE) 02700 1,705 LBS
PHOSPHORUS, P, SEEDING
(100 LBS/ACRE) 02700 3,410 LBS
POTASSIUM, K, SEEDING (160
LBS/ACRE) 02700 5,456 LBS
PERMANENT SEEDING,
NATIVE MIX 02700 32.3 ACRE
PERMANENT SEEDING,
WETLAND MIX 02700 1.8 ACRE
MULCH, SEEDING (2
TONS/ACRE) 02700 34.1 ACRE
TOTAL BASE BID $
END OF DOCUMENT C
| Text1: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| 2: |
| 0: |
| 1: |
| 3: |
| 0: |
| 1: |
| 4: |
| 0: |
| 1: |
| 5: |
| 0: |
| 1: |
| 6: |
| 0: |
| 1: |
| 7: |
| 0: |
| 1: |
| 8: |
| 0: |
| 1: |
| 9: |
| 0: |
| 1: |
| 10: |
| 0: |
| 1: |
| 11: |
| 0: |
| 1: |
| 12: |
| 0: |
| 1: |
| 13: |
| 0: |
| 1: |
| 14: |
| 0: |
| 1: |
| 15: |
| 0: |
| 1: |
| 16: |
| 0: |
| 1: |
| 17: |
| 0: |
| 1: |
| 18: |
| 0: |
| 1: |
| 19: |
| 0: |
| 1: |
| 20: |
| 0: |
| 1: |
| 21: |
| 0: |
| 1: |
| 22: |
| 0: |
| 1: |
| 23: |
| 0: |
| 1: |
| Text3: |
| 0: |
| 0: |
| 1: |
| 1: |
| 0: |
| 1: |
| 2: |
| 0: |
| 1: |
| 3: |
| 0: |
| 1: |
| 4: |
| 0: |
| 1: |
| 5: |
| 0: |
| 1: |
| 6: |
| 0: |
| 1: |
| 7: |
| 0: |
| 1: |
| 8: |
| 0: |
| 1: |
| 9: |
| 0: |
| 1: |
| 10: |
| 0: |
| 1: |
| 11: |
| 0: |
| 1: |
| 12: |
| 0: |
| 1: |
| 13: |
| 0: |
| 1: |
| 14: |
| 0: |
| 1: |
| 15: |
| 0: |
| 1: |
| 16: |
| 0: |
| 1: |
| 17: |
| 0: |
| 1: |
| 18: |
| 0: |
| 1: |
Text4:
File details come from the government source that posted it. Updated .