0200000 J A Management and Administration Street Sweeping.docx

DOCX document 58 KB Posted

Attached to
STREET SWEEPING & CATCH BASIN CLEANING SERVICES Federal contract opportunity
Solicitation number
N4008524R2672
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains attachments for a federal contract opportunity related to street sweeping and catch basin cleaning services. The key details are:

The contract opportunity is for a U.S. Navy Naval Facilities Engineering Command (NAVFAC) requirement for street sweeping and catch basin cleaning services. The attachments provide definitions, wage determinations, directives and references, invoice requirements, government-furnished property and services, contractor information and asset data requirements, specification information, and details on the NAVFAC MAXIMO data reporting process and system access procedures. No pricing or award details are provided, as this is a pre-solicitation with a draft RFP. The final RFP will be released in the upcoming days.

View the file

Other files for this federal contract opportunity

Other files attached to STREET SWEEPING & CATCH BASIN CLEANING SERVICES, newest first.
File Type Posted
RFP N4008524R2672-0001 - STREET SWEEPING.pdf PDF
Street Sweeping Questions Response - Answers 21-Jun-24.docx DOCX document
RFP N4008524R2672 - STREET SWEEPING.pdf PDF
1503060 J Attachment 6 - Maintenance Plan.pdf PDF
01503060 J Documents Exhibits and Other Attachments.docx DOCX document
1503060 C Pavement Clearance Street Sweeping.docx DOCX document
0200000 F Forms.pdf PDF
0200000 F Deliverables Street Sweeping.docx DOCX document
1503060 J Attachment 7 - Catch Basin Maps.pdf PDF
1503060 J Attachment 5 - Data Report.pdf PDF
RFP N4008524R2672 - STREET SWEEPING.pdf PDF
1503060 J Attachment 4 Maps.pdf PDF
0200000 C Management and Administration Street Sweeping.docx DOCX document
0100000 C General Information.docx DOCX document
1503060 F Deliverables Street Sweeping.pdf PDF
ELINs 2024 Street Sweeping.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J - 020000 Management and Administration

Attachment Number

Attachment Title

J-0200000-01
Definitions and Acronyms
J-0200000-02
Wage Determinations
J-0200000-03
Directives, Instructions, and References
J-0200000-04
Invoice Form
J-0200000-05
Forms
J-0200000-06
Government-Furnished Property, Materials, and Services
J-0200000-07
Service Provider Information
J-0200000-08
Asset Information
J-0200000-09
Specification Information
J-0200000-10
Characteristic Meter Readings Information
J-0200000-11
NAVFAC MAXIMO Data Reporting
J-0200000-12
NVFAC MAXIMO System Access Procedures
J-0200000-13
Installation Spill Prevention, Control, and Countermeasure Plans
J-0200000-14
Contractor Hazardous Material Inventory Log
J-0200000-15
Exhibit Line-Item Numbers

ATTACHMENT J-0200000-01

DEFINITIONS AND ACRONYMS

Definition
Description
Assessment
A general term referring to either a survey or inspection of a facility to determine condition.
Asset
A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.
Competent Person
A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.

One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.

Component Inventory Management Unit (CIMU)
An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.
Confined Work Space
A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Construction Equipment
Construction equipment refers to specialized heavy machinery that covers one industry and is specifically designed for executing construction work. Construction equipment requirements shall include a list of equipment establishing the size, quality, number of units, and unit prices. Construction equipment prices provided by the Contractor shall be the lowest price available considering the availability of equipment and the time constraints of the job. The direct equipment price shall be adjusted by all discounts and rebates that accrue to the Contractor.

All indirect cost associated with construction equipment, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the equipment price since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.

Contracting Officer (KO)
That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contracting Officer’s Representative (COR)
The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or SPAR.
Contractor
That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor Representative
That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Crane, Category 1
Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.
Crane, Category 2 & 3
Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.
Crane, Category 4
Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.
Direct Material Costs
The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.

All other cost such as sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment, mobilization, demobilization, time for job preparation, safety standby personnel, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the direct material price since the cost for these items are included in the UPL Hour unit price bid.

Electronic Operation And Maintenance And Support Information (eOMSI)
A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle. Generally, it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.
Equipment
Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
Facility
A building or structure designed and created to serve a particular function.
Fixed Burden Rate (FBR)
The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden Rate for materials in the Base Period is 10% then:

$100,000.00 + ($100,000.00 x 10%) = $110,000.00

The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.

Frequency Of Service
Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.

Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.

Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.

Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.

Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.

Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.

Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.

Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.

Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.

Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.

Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.

Government Furnished Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Hazardous Material (HM)
A material that because of its quality, concentration, physical, chemical or infectious nature may pose a threat to human health or the environment if released or spilled into the environment or any material designated by the Department of Transportation (DOT) or any materials that require a SDS form as posing a potential threat while being transported. Hazardous materials are listed in 49 CFR Part 172.
Hazardous Waste (HW)
Any discarded solid waste (liquid, semi-solid, solid, or gaseous) that meets the definition of a hazardous waste by USEPA, state authorities, or the Navy. In accordance with RCRA, a solid waste is a listed hazardous waste if it is specifically listed, or it is a characteristic hazardous waste if it exhibits the characteristics of ignitability, corrosivity, reactivity, or toxicity.
Hazardous Waste Management Plan
In accordance with OPNAVINST 5090.1C, every Navy shore activity that generates HW shall develop and use a Hazardous Waste Management Plan or a Hazardous Waste management component in its P2 Plan and EMS. A Hazardous Waste Management Plan shall:

· Identify applicable federal, state, and local regulations pertaining to the generation and management of hazardous waste.

· Identify training requirements and describe procedures for obtaining training and maintaining training records.

· Assign responsibilities for the generation, designation, handling, storage, treatment, disposal, and all documentation.

· Describe all hazardous waste generation and management procedures.

· Include or reference the hazardous waste minimization plan and goals.

· Include or reference contingency plans and emergency response procedures.

The plan shall be kept up to date to include changes in hazardous waste generation and management procedures, as well as changes in applicable federal, state, and local hazardous waste regulations. The plan shall include or reference minimization procedures sufficient to achieve DOD minimization goals. Tenant activities are covered by the host CO's Hazardous Waste Management Plan.

Hazardous Waste Manifest
A hazardous waste manifest as defined in 40 CFR 260 is required for the transport of hazardous waste. The installation commanding officer (ICO) or the ICO’s designated representative shall retain signature authority for hazardous waste manifests.
Infrastructure Condition Assessment Program (ICAP)
A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.
Inspection
A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Integrated Maintenance Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
Job or Work Order
An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Life-Cycle Costs
A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.

Less-than-90-day Accumulation Areas or Storage Facilities

Temporary HW storage areas where HW may be stored for up to 90 days without a RCRA permit.

Maintenance And Repair
The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
Monthly On-Site Labor Report
A compilation of all Contractor and subcontractor employee-hours involved in delivering contract services on a Government property.
NAVFAC MAXIMO
A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.
Non-RCRA Regulated Waste
Waste that is not regulated as a hazardous waste under RCRA; however, is waste may be regulated by other federal, state or local regulations including but not limited to TSCA, Clean Air Act, Clean Water Act or other regulations and statues. Examples include Used Oil, Universal Waste, Oily Water, antifreeze, etc.

Non-RCRA regulated waste (while not meeting the definition of a Hazardous Waste) must be managed according to its applicable regulations and may not be discarded into the general trash.

Non-Regulated Solid Waste (Debris and Rubbish)
Waste not associated with an industrial process such as refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food. Non-hazardous construction and demolition wastes such as dimension and non-dimension lumber, plywood, chipboard, and hardboard are included.
Partnering
The terms “partnering” and “partnership” used herein shall mean a relationship of open communication and close cooperation that involves both Government and Contractor personnel working together for the purpose of establishing a mutually beneficial, proactive, cooperative environment within which to achieve contract objectives and resolve issues and implementing actions as required.

Performance Assessment

A method used by the Government to provide some measure of control over the quality of purchased goods and services received.

Performance Assessment Representative (PAR)
The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.
Pre-Expended Bin Materials and Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less. Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Property Administrator
An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract.
Property Management Program
A Government program established for the purpose of reviewing and approving the Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
Quality Assurance (QA)
The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC)
The observation techniques and activities used to fulfill requirements for quality.
R. S. Means
A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".
Real Property
Land and improvements to land (i.e., facilities). It includes equipment affixed and built into the facility as an integral part of the facility (such as heating systems), but not movable equipment (e.g., plant equipment, industrial equipment, buoys).
Real Property Inventory Equipment (RPIE)
A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property.

Individual RPIE’s can be combined to make a CIMU to facilitate facilities management. An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.

Regulated Waste
Any hazardous, non-hazardous, industrial process waste (aka special waste), e-waste, and/or off-specification HM, which because of its physical characteristics, chemical make-up or biological nature requires either special handling procedures and permitting, or poses an unusual threat to human health, equipment, property, or the environment. Examples include (but are not limited to) liquid sludge, pastes, and/or filter cakes, chemical compounds and/or petroleum products, fine powders or highly dusty materials, spent blast media and/or grit, demolition wastes from industrial facilities, debris and/or residues from spill cleanup work, underground storage tank remediation materials, pollution control wastes, ash from fires, furnaces, boilers or incinerators, off-specification products, other materials that have the potential to be a hazardous waste. All RW may be used or unused excess hazardous materials. Laboratory analysis may be required to verify the waste is not a RCRA-regulated hazardous waste.
Response Time
The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Restoration
Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident, or other causes.
Sampling Plan
Plan and procedures to conduct sampling, field testing and laboratory analysis for a defined testing objective.
Satellite Accumulation Areas
Designated approved areas, at or near the point of generation and under the control of the operator generating the waste, where no more than 55 gallons (cumulative total) of all types of HW or 1 quart of acutely HW may be accumulated. The 55-gallon limit does not include non RCRA regulated waste, universal waste and used oil etc.
Spill Prevention Control and Countermeasure (SPCC) Plan
The SPCC Plan establishes engineering controls including procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon navigable waters. The Plan includes procedures for oil spill prevention, measures to contain spills and an established spill drill exercises to ensure effective countermeasures in the event of oil spill.
Sustainment
Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
System
An assemblage of mechanically and/or electrically interlocked parts, equipment and/or components forming a unitary whole.
Unit Priced Labor (UPL) Hour
The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit priced labor hour price shall include all indirect and direct costs associated with performing work, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, wage determinations, union agreements, crew sizes, hand tools, equipment, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups. Any indirect cost or additional markups not allowed in the definition of direct materials shall be included in the UPL price. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.
Uniformat Classification
A standard classification of building components established by the National Institute of Standards and Technology.
Universal Equipment
Universal equipment refers to equipment that can cover two or more industries and is commercially employed in execution of operation, maintenance, and repair work, such as: Aerial Work Platforms, Backhoes, Cranes, Dump Trucks, Excavators, Generators, Graders, Lifts, Loaders, Man Lifts, Scissor Lifts, Monitoring and Test Equipment, Pumps, Tractors, Trailers, Pump/Vacuum Truck, Snooper Truck, Boat, etc.
Universal Waste (UW)
Universal Waste (UW) (defined in 40 CFR Part 273) means batteries, fluorescent lamps, some pesticides, and mercury-containing equipment formally classified as a HW, but that are now subject to less stringent regulations, when recycled if recycling is available.

Utility Infrastructure Condition Assessment Program (UICAP)

A comprehensive assessment processes for planning, managing, and executing Navy utility infrastructure inspections.

ATTACHMENT J-0200000-01

Definitions and Acronyms

Acronym
Title
ACO
Administrative Contracting Officer
AFFF
Aqueous Film Forming Foam
BFR
Basic Facility Requirements
BW
Biweekly
CBMM
Condition Based Maintenance Management Program
CDR
Contract Discrepancy Report
CIA
Controlled Industrial Area
CIMU
Component Inventory Management Unit
CMMS
Computerized Maintenance Management System
CNSSI
Committee on National Security Systems Instruction
COR
Contracting Officer Representative
COR
Condition of Readiness
DBH
Diameter at Breast Height
DCR
Direct Condition Rating
DoD
Department of Defense
DoDI
Department of Defense Instruction
DoN
Department of Navy
DRMO
Defense Reutilization Management Office
EPA
Environmental Protection Agency
EPCRA
Emergency Planning and Community Right-to-Know Act
FAR
Federal Acquisition Regulation
FFP
Firm Fixed Price
FIFRA
Federal Insecticide, Fungicide, and Rodenticide Act
FSC
Facility Support Contract
FSCM
Facility Support Contract Manager
GIS
Geospatial Information System
GFE
Government-furnished Equipment
GFF
Government-furnished Facilities
GFM
Government-furnished Materials
HCA
Head Contracting Agency
ICAP
Infrastructure Condition Assessment Program
ICP
Integrated Contingency Plan
IDIQ
Indefinite Delivery Indefinite Quantity
iNFADS
Internet Navy Facilities Asst Data Store
IPM
Integrated Pest Management
IPMIS
Integrated Pest Management Information System
IPMP
Integrated Pest Management Plan
KO
Contracting Officer
LAN
Local Area Network
M
Monthly
MAP
Maintenance Action Plan
MDI
Mission Dependency Index
MEP
Mechanical, Electrical and Plumbing
MILCON
Military Construction
MPAS
Monthly Performance Assessment Summary
MRI
Mission Readiness Index
MSDS
Material Safety Data Sheets
NAVFAC
Naval Facilities Engineering Command
NIST
National Institute of Standards and Technology
NIST SP
National Institute of Standards and Technology Special Publication
NMCI
Navy Marine Corps Intranet
NOSC
Navy-On-Scene Coordinator
PAP
Performance Assessment Plan
PAR
Performance Assessment Representative
PAW
Performance Assessment Worksheet
PEO
Program Executive Officer
PM
Project Manager
PM
Planned Maintenance or Preventative Maintenance
POAM
Plan of Action and Milestones
PRCSP
Permit Required Confined Space Program
PWS
Performance Work Statement
PWO
Public Works Officer
Q
Quarterly
QC
Quality Control
RSIP
Regional Shore Infrastructure Plan
RPIE
Real Property Inventory Equipment
RSL
Remaining Service Life
SC
Security Clearances
SM
Semimonthly
SPAR
Senior Performance Assessment Representative
TE
Technical Exhibit
VIQ
Variation in Quantity
WBS
Work Breakdown Structure

ATTACHMENT J-0200000-02

WAGE DETERMINATIONS

Placeholder for Collective Bargaining Agreements, Service Contract Labor Standards, Wage Rate Requirements and Davis Bacon Act Determination. Located in the Solicitation

See separately attached “Attachments J-0200000-02”.

ATTACHMENT J-0200000-03

DIRECTIVES, INSTRUCTIONS, AND REFERENCES

REFERENCE
TITLE
ANSI Al0.43
Confined Spaces
ANSI Al0.48
Safety Practices with Construction, Demolition, Modification & Maintenance
ANSI A14 Al0.48
Ladder Safety Requirements
ANSI/ASSE A1264
Workplace Surface Safety
ANSI/ASSE Z359
Fall Protection
ANSI/ASSP Z10.0
Occupational Health & Safety
ANSI/ISEA 101
Clothing & Equipment Safety
ANSI/ISEA 107-2010
High Visibility Garment Standard
ANSI Z490.1
Criteria for Accepted Practices in Safety, Health & Environmental Training
ASMEB 30.5
Mobile Crane Standards
ASMEB30.22
Articulating Boom Cranes
29 CFR 1904
Recording and Reporting Occupational Injuries and Illness
29 CFR 1910
Occupational Safety and Health Standards
29 CFR 1910.1025
Toxic and Hazardous substances - Lead
29 CFR 1910.120
Hazardous Materials - Hazardous waste operations and emergency response
29 CFR 1910.134
Personal Protective Equipment-Respiratory protection.
DFARS 252.223-7004
Drug Free Work Force
DoD Directive 5200.2
DoD Personnel Security Program (PSP)
DoDI TM 5-610
Preventive Maintenance Facilities, Buildings & Structures
DoDI TM 5-6653
Steam, Water, Utilities Distribution Inspection & Maintenance
EMS 385-1-1
U.S. Army Corp of Engineers Safety and Health Requirements (https://www.usace.army.mil/Safety-and-Occupational-Health)
FAR 52.223-3
Hazardous Material Identification and Material Safety Data Sheet
FAR 52.232-36
Payment by Third Party
NAVFAC P-307
Management of Weight Handling Equipment
NEC
National Electric Code
NFPA 1
Fire Code
NFPA 10
Standard for Portable Fire Extinguishers
NSPC
National Standard Plumbing Code
P.L. 91-596
Occupational Safety and Health Act
UFC
Unified Facilities Criteria
UFC 3-420-02FA
Compressed Air

UFGS 01 35 26

Unified Facilities Guide Specifications https://www.wbdg.org/FFC/DOD/UFGS/UFGS%2001%2035%2026.pdf

UPC
Uniform Plumbing Code
NWSEARLEINST 5090.14F N4
Air Pollution Emergency Planning
CNRMAINST 11262.1BN4
Crane Lifting and Handling Equipment Oversight

ATTACHMENT J-0200000-04

INVOICE FORM

See Clause 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013) included in the solicitation

See separately attached “Attachments J-0200000-04”. WAWF Vendor Getting Started Guide

ATTACHMENT J-0200000-05

FORMS

Monthly On-Site Labor Report, Used Oil Disposal and Recycling Summary Report Form, Solid Waste Management Report, Directions for Process Material Log Sheets, Contractor Hazardous Material Inventory Log (EPRCA), VOC/HAP Tracking Form, Contractor Crane Operating Checklist for Critical Lifts NAVFAC Contractor Incident Report, WHE Accident Report, etc.

See separately attached “Attachments J-0200000-05”.

NAME
LOCATION
Contractor Safety Self-Evaluation Checklist
Attachment J-0200000-05
Contractor Production Report
Attachment J-0200000-05
Contractor Quality Control Report
Attachment J-0200000-05
Used Oil Disposal and Recycling Summary Report Form
Attachment J-0200000-05
Solid Waste Management Report
Attachment J-0200000-05
Directions for Process Material Log Sheets
Attachment J-0200000-05
Contractor Hazardous Material Inventory Log (EPRCA)
Attachment J-0200000-05
Hazardous Material List
Attachment J-0200000-05
VOC/HAP Tracking Form
Attachment J-0200000-05
Contractor Crane Operating Checklist For Critical Lifts
Attachment J-0200000-05
Crane and Rigging Gear Accident Report Instructions
Attachment J-0200000-05
Crane and Rigging Gear Accident Report
Attachment J-0200000-05
Crane and Rigging Gear Near Miss Instructions
Attachment J-0200000-05
Crane and Rigging Gear Near Miss Report
Attachment J-0200000-05
Contractor Significant Incident Report (CSIR) Instructions
Attachment J-0200000-05
Contractor Significant Incident Report (CSIR)
Attachment J-0200000-05
ID Card/Base Access Pass Registration SECNAV 5512/1 (Security Pre-Vetting Form)
Attachment J-0200000-05
Traffic Accident Report OPNAV 5580/1A
Attachment J-0200000-05
Employment Eligibility Form I-9
Attachment J-0200000-05

ATTACHMENT J-0200000-06

GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES

At this time the Government will not provide any property, materials, or service.

ATTACHMENT J-0200000-07

SERVICE PROVIDER INFORMATION

SERVICE PROVIDER INFORMATION V1 - 2013-07-07”. This attachment is referenced in ATTACHMENT J-0200000-07 titled: SERVICE PROVIDER INFORMATION. The below is presented in an uneditable format to show the offeror what information will be required. Editable EXCEL spreadsheets shall be supplied after award.

ATTACHMENT J-0200000-08

ASSET INFORMATION

ASSET INFORMATION PROVIDER INFORMATION V1 - 2017-04-26”. This attachment is referenced in ATTACHMENT J-0200000-08 titled: ASSET INFORMATION. The below is presented in an uneditable format to show the offeror what information will be required. Editable EXCEL spreadsheets shall be supplied after award.

ATTACHMENT J-0200000-09

SPECIFICATION INFORMATION

This attachment is referenced in ATTACHMENT J-0200000-09 titled: SPECIFICATION INFORMATION. The below is presented in an uneditable format to show the offeror what information will be required. Editable EXCEL spreadsheets shall be supplied after award.

Attachment J-0200000-10 Characteristic Meter Reading Information

This attachment is referenced in ATTACHMENT J-0200000-10 titled: CHARACTERISTIC METER READING. The below is presented in an uneditable format to show the offeror what information will be required. Editable EXCEL spreadsheets shall be supplied after award.

Attachment J-0200000-10 Characteristic Meter Reading Information

Name
Required
Length

Limit

NAVFAC MAXIMO FIELD

(MEASUMENT / ASSETMETER)

Site
Y
8
SITEID/SITEID
Asset
Y
25
ASSETNUM/ASSETNUM
Meter
Y
15
METER NAME/METER NAME
Observation
Y
2
OBSERVATION/LASTREADING
Measurement Date
Y
10
MEASUREDATE/LASTREADINGDATE
Inspector
Y
30
INSPECTOR / LASTREADINGINSPCTR

Observation Values

Facilities (DCR):

A
(Amber)
A+
(Amber Plus)
A-
(Amber Minus)
G
(Green)
G+
(Green Plus)
G-
(Green Minus)
R
(Red)
R+
(Red Plus)
R-
(Red Minus)

Utilities (UCR):

1
(Best/Highest CI Ranking)
5
(Worst/Lowest CI Ranking)

Attachment J-0200000-11

NAVFAC MAXIMO Data Reporting

This attachment details the process required for proper submission of Contractor work order, asset, specification, and condition assessment data for NAVFAC MAXIMO. The data is required for the Government’s use in long term asset management and planning.

Consult the NAVFAC MAXIMO User Guide, Appendix D001 for further information about the transfer of data to NAVFAC MAXIMO. Contact the NAVFAC MAXIMO Program Manager or your FEC MAXIMO lead if you have specific questions about these requirements.

PURPOSE AND OVERVIEW

The purpose of this attachment is to provide guidance on how data is to be recorded and provided by the Contractor in reporting Service Provider, Asset, Specification, and Characteristic Meter Reading Information for NAVFAC MAXIMO. This document outlines the methods that must be utilized by the Contractor and associated NAVFAC business process and procedures for how data is to be submitted.

GENERAL TYPES OF DATA

Work Order Data Work order data includes all necessary information for the documentation of all completed work orders, including, but not limited to, service orders, preventive maintenance (as performed under the PM program or as part of IMP), and work issued as IDIQ. Specific NAVFAC MAXIMO fields required for work order data are listed on the Service Provider Information spreadsheet provided in J-0200000-07.

Asset Data Asset data includes the specific details necessary for proper identification and tracking of assets. Asset data must be updated for all completed work orders where an asset is repaired, replaced, installed, or otherwise affected. Specific NAVFAC MAXIMO fields required for asset data are listed on the Asset Information spreadsheet provided in J-0200000-08. Utilities assets require the additional data listed on the Specification Information spreadsheet provided in J-0200000-09. When replacing existing assets, the Contractor shall change the status of the current asset which will remove it from the maintenance plan and add the new asset.

Condition Assessment Data Condition assessment data includes all necessary information for the accurate condition rating of all assets in support of the Infrastructure Condition Assessment Program (ICAP). Specific NAVFAC MAXIMO fields required for condition assessment data are listed on the Characteristic Meter Reading Information spreadsheet provided in J-0200000-10.

METHODS FOR DATA SUBMISSION

The Contractor shall provide work order, asset, specification, and condition assessment data using the methods as specified in Section C. Additional details are provided below for submission of data via Direct Entry and Flat File methods.

Direct Data Entry:

In this method a Contractor obtains authorized access as specified in Section C and directly enters data into NAVFAC MAXIMO. Detailed guidance on NAVFAC MAXIMO System Access Procedures is provided in 0200000 Management and Administration, Spec Item 2.6.6.1 System Access. All reference value verification is provided by NAVFAC MAXIMO.

All Contractors who obtain authorized access will be granted entry only within the applicable NAVFAC MAXIMO screens necessary to enter work order, asset, specification, and condition assessment data. Contractors are only authorized to view, edit, report or otherwise access data related to their work. Any unauthorized attempt to do otherwise may be grounds for removal of access privileges. Contractors will be assigned a specific work center code for their work and shall utilize this code for all such data entry and retrieval.

Attachment J-0200000-12 NAVFAC Maximo System Access Procedures

Purpose and Overview In order to obtain access to NAVFAC MAXIMO for direct entry, Contractor personnel must obtain a Common Access Card (CAC) with DoD PKI certificates for the access to Government Information Systems (IS) and must have an account established within NAVFAC MAXIMO.

CAC Application Procedures Once the Contractor has provided the list of personnel requiring MAXIMO accounts, the Government Trusted Agent (TA) will sponsor the Contractor personnel initiating the process to obtain a CAC. Contractor personnel must submit an application for the CAC within the Trusted Associate Sponsorship System (TASS). Contractor personnel must log into TASS within seven days of the application's approval and must complete the application for a CAC within 30 days of the initial login. More information can be found at: http://www.cac.mil/common-access-card/getting-your-cac/for-contractors/.

After approval in TASS, the Contractor personnel must go to a Real-Time Automated Personnel Identification System (RAPIDS) site for final verification and issuance of the CAC with associated DoD PKI certificates.

NCMI Access Procedures If a NMCI workstation is provided to the Contractor, add any additional requirements for NMCI access.

NAVFAC MAXIMO Account Requests The Contractor shall submit a request for establishing a NAVFAC MAXIMO account to the Contracting Officer using the System Access Authorization Request – Navy (SAAR-N) form (OPNAV 5239/14) and indicate the role the user will have and the specific account privileges desired. Account requests SHALL NOT be submitted prior to having received a CAC.

Specific steps for requesting account access include:

· Complete Information Assurance (IA) training

· Cyber Awareness Challenge version 3.0 (current requirement, subject to change based on policy)

· Annual IA training is required to maintain access to Government IS

· Submit a complete and digitally signed SAAR form detailing the following required access:

· Requesting a NITC portal SSO account

· Requesting a STS account

· Request a NAVFAC Maximo account.

· After the SSO/STS accounts are created, submit a STS ticket requesting a new Maximo account.

· The local NAVFAC Business Office will determine level of access and restrictions for users by configuring NAVFAC MAXIMO Work Center access. The Contractor will receive notification that the NAVFAC MAXIMO account has been created and NAVFAC MAXIMO access URL details.

Attachment J-0200000-13 Installation Spill Prevention, Control, and Countermeasure Plans

Contact NWS Environmental Division for current spill control plan - (732) 866-2540

The Contractor shall prevent, contain, clean up, and report all spills on Government property caused by the Contractor, in a manner that complies with applicable station, Federal, state, and local laws and regulations at no additional cost to the Government. Base Information and Installation Hazardous Waste Management Plans can be obtained from NWSE Environmental Management office. Contact NWS Environmental Division for current spill control plan - (732) 866-2540

ATTACHMENT J-0200000-14

CONTRACTOR HAZARDOUS MATERIAL INVENTORY LOG

See separately attached “ATTACHMENT J-0200000-14 HAZMAT Inventory List & Inventory Log”.

See separately attached “ATTACHMENT J-0200000-14 HAZMAT Inventory List & Inventory Log”.

ATTACHMENT J-0200000-15

EXHIBIT LINE-ITEM NUMBERS

See separately attached “Attachment J-0200000-15 Exhibit Line-Item Numbers”