02 41 00 Demolition.pdf
PDF 114 KB Posted
- Attached to
- Renovate Laguna Campground Picnic Tables
- Solicitation number
- 127EAW22Q0018
- Issued by
-
Department of Agriculture Forest Service
About this file
This document outlines specifications for a demolition project and related federal contract opportunity. The demolition specifications require removing existing picnic tables from Laguna Campground in Cleveland National Forest, restoring the site to its natural state, and complying with EPA regulations and waste disposal requirements. The related solicitation seeks quotations to renovate the picnic tables at Laguna Campground between $100,000 to $250,000. Quotations are due by the date specified in Section L and must meet requirements in Section M. The opportunity is set aside 100% for Service-Disabled Veteran Owned Small Businesses. Bidders must submit a bid guarantee if the quote exceeds $150,000. Proposals should be returned to the Department of Agriculture Forest Service contacts listed.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION Section 02 41 00-1
SECTION 02 41 00 - DEMOLITION
PART 1 - GENERAL
1.01 SCOPE
A. The work within this section includes but is not limited to the following items: demolition, removal and disposal of existing tables. It shall also include salvage materials. The site shall be returned to a natural state. The work within this Section includes, but is not limited to, the following items:
1. Base Bid: Demolish and remove and dispose of construction debris off National Forest land as describe in Section 01 74 00 Cleaning and Waste Management, and Section 01 74 19, Construction Waste Management.
“Demo Sites” shall include removing existing picnic tables. Site shall be restored back to its natural state.
1.02 MEASUREMENT AND PAYMENT
A. No separate measurement or payment will be made for work specified in this section.
1.03 QUALITY ASSURANCE
A. Regulatory Assurance: Comply with governing EPA notification refulations before beginning demolition Comply with hauling, abatement, and disposal regulations or authoriities having jurisdiction.
B. Disposal Records: Provide routine review of all receipts and documentation for all disposal, recycling and landfill disposal. Upon project completion, provide all manifests and tickets documenting final disposal of recycled and disposed wastes in accordance with Section 01 33 23 Shop Drawings, Product Data and Submittals.
1.04 PROJECT CONDITIONS
A. Contractor shall perform their own independent site inspection of the site conditions during the pre-work site inspection.
1.05 DEFINITIONS
A. Demolish: Completely remove and legally dispose of off-site.
B. Salvage: Carefully detach from existing construction, in a manner to prevent damage, reduce size or configuration as necessary and deliver to the designated location.
C. Inert Material: A material passively resistant to change. For this project, these include block, masonry, pavement and concrete.
1.06 MATERIAL OWNERSHIP
A. Unless otherwise indicated, demolition debris becomes the property of the Contractor.
DEMOLITION Section 02 41 00-2
PART 2 - PRODUCTS
2.01 N/A
PART 3 - EXECUTION
3.01 Prior to starting demolition work, the Contractor shall make an inspection with the Contracting
Officer’s Representative to determine the physical condition of adjacent improvements scheduled to remain. The Contractor shall exercise caution to minimize disturbance to existing improvements.
3.02 Demolition work shall be performed in such a manner as to ensure the safety of persons working or visiting the area. The use of explosives is prohibited on this project. Do not burn demolished materials under any circumstance. Remove and transport debris in a manner that will prevent spreading or spillage into adjacent areas. All loads of debris (dump trucks or bins) are to be covered when in motion to prevent airborne dust.
3.03 All designated salvageable material shall be removed without unnecessary damage and shall be stored in locations designated by the COR.
3.04 Debris resulting from the demolition portion of this project shall be removed from the work site as it accumulates in accordance with Section 01 74 00, Cleaning and Waste Management, and 01 74 19 Construction and Waste Management. Keep all pavement areas adjacent to and leading from the site, clean and free of debris at all times.
3.06 UTILITY DEMOLITION
A. Locate and identify all existing utilities. It is the Contractors responsibility to protect existing utilities from damage. All damage to utilities caused by the Contractor shall be repaired by the Contractor at no cost to the government.
B. Prior to commencing work, erosion control measures shall be established in accordance with Section
01 57 24, Storm Water Pollution Control and Section 31 20 00 Earth Moving.
3.08 PROTECTION OF SENSITIVE RESOURCE AREAS AND ADJACENT TREES
A. Existing trees and vegetation adjacent to the demolition areas shall be protected against any unnecessary damage in accordance with Section 31 10 00, Site Clearing.
3.09 ABESTOS DISCLOSURE
A. Comply with hauling, abatement, and disposal regulations or authorities having jurisdiction for all hazardous material.
END OF SECTION 02 41 00