This is a Reflected Ceiling Plan (RCP) and Roof Plan architectural drawing prepared by V3 Architecture & Engineering for the California Department of Corrections and Rehabilitation's San Quentin Rehabilitation Center Upper Yard Phase 2 project located at 100 Main Street, San Quentin, California. The drawing, dated February 26, 2025, specifies the roof system components and layout for the project, including metal roof panels, polycarbonate roof panels, roof gutters, downspouts, and associated hardware. The plan indicates new structural support requirements referenced in separate structural drawings and shows detailed specifications for materials including 14-gauge stainless steel downspout straps, standing seam metal roofing, 2-inch closure flashing, and polycarbonate drip edge systems. The drawing includes both a roof plan and ground-level reflected ceiling plan at 1/16-inch scale, along with detailed sections at larger scales (3/4-inch and 1-1/2-inch) illustrating downspout transitions and connections to existing storm drain infrastructure.

The architectural drawing serves as a reference document supporting the state and local contract opportunity FPCM-SQRC-I001125-1125-087-A-RS for roof panels and accessories. This product-only solicitation requires bidders to review the complete Invitation for Bid and any addendums for information essential to the bidding process. The drawing was prepared under the supervision of Loyd Rolle, Supervising Architect, and Shan Li, Senior Architect, with approval contingent upon compliance with all applicable regulations and no omission or deviation from specification requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

110-A

26a 26b 26c

09 08

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A

B

A2.2

A3.3

S P

A C

IN

G

P

U R

L

IN

S P

A C

IN

G

P

U R

L

IN

S P

A C

IN

G

P

U R

L

IN

S P

A C

IN

G

P

U R

L

IN

S P

A C

IN

G

P

U R

L

IN

10 10 10

A2.2

41' - 6" 1' - 6" 1' - 6" 1' - 6" 1' - 6"

88 84

110-A

26a 26b 26c

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A

B

LEGEND

METAL ROOF PANEL

POLYCARBONATE ROOF PANEL

ADJACENT BUILDING

14 GA ⌀4"

STAINLESS

STEEL

DOWNSPOUT

STRAP

S E

E S

T R

U C

T U

R A

L D

W G

SEE STRCTURAL DWG

3' - 4 1/2"

CONCRETE

SIDEWALK

A3.3

CONNECT TO

STORMDRAIN

PIPE

4-3/4

APPROXIMATE PER

RECORD DWG

DOWNSPOUT

BOOT

TUBE MULLION

BASE CHANNEL

SOLID

POLYCARBONATE

SYSTEM END CAP

(WITH WEEP HOLES

FOR WATER

DRAINAGE)

PLASTIC TUBE CAP

2" TALL

STANDING SEAM

METAL ROOF

(E) PURLIN

NEW STRUCTURAL

SUPPORT, SEE

STRUCTURAL

DWGS

POLYCARBONATE

DRIP EDGE

BONDED TO PANEL

MOUNTING BASE

2"

CLOSURE

FLAHSING

BETWEEN

MULLIONS - POP

RIVET TO EAVE

FLASHING

CONT. EAVE

FLASHING

BETWEEN MULLION

AND TUBE

R E

V

IT

F

IL

E

DATE:

SHEET NUMBER

A

B

C

D

E

F

G

H

J

K

L

M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

OF SHEETS V3

ARCHITECTURE & ENGINEERING

CALIFORNIA DEPARTMENT OF

CORRECTIONS AND REHABILITATION

CALIFORNIA DEPARTMENT OF

CORRECTIONS AND REHABILITATION

ACCESS COMPLIANCE REVIEW

APPROVAL OF THIS PLAN DOES NOT AUTHORIZE

OR APPROVE ANY OMMISION OR DEVIATION

FROM APPLICABLE REGULATIONS

LOYD ROLLE

SUPERVISING ARCHITECT

SHAN LI

SENIOR ARCHITECT

D L S

\S Q

R C

\2 -0

\0 D

R A

W

IN

G S

\3 A

A c ti v e D ra w in g s \2

-0

S Q

R C

.r v t

/2

/2

:3 :3

P

M

A2.2

R C

P A

N D

R O

O F

P L

A N

02/26/2025

S Q

R C

U P

P E

R Y

A R

D P

H A

S E

24-026

S A

N Q

U E

N T

IN

R

E H

A B

IL

IT

A T

IO

N

C E

N T

E R

M

A

IN

S T

S

A N

Q U

E N

T

IN

C

A

SQRC

1/16" = 1'-0"ROOF PLAN 3

08 (N) ROOF PANEL

09 (N) ROOF GUTTER

10 (N) DOWNSPOUT

83 (E) GUARD WALK W/ (N) PAINT

84 (E) GUARDRAIL W/ (N) PAINT

88 PATCH AND PAINT GUARD WALK AND GUARDRAIL AFTER STATION

REMOVAL

KEYNOTE

1/16" = 1'-0"GROUND LEVEL REFLECTED CEILING PLAN 2

3/4" = 1'-0"DOWNSPOUT 4

1 1/2" = 1'-0"TRANSITION DETAIL 1

REV. DATE: DESCRIPTION

4 09/26/25 CB-04

Sheets
A2.2 - RCP AND ROOF PLAN
A3.3 - DETAILS
G1.0 - COVER SHEET
R1.1 - RECORD DRAWING FOR REFERENCE ONLY
R1.2 - RECORD DRAWING FOR REFERENCE ONLY
R1.3 - RECORD DRAWING FOR REFERENCE ONLY

File details come from the government source that posted it. Updated .