0138VL00-00001-0138-VL00 DID A008 DI-MISC-81321A.pdf

PDF 133 KB Posted

Attached to
Demineralizers Federal contract opportunity
Solicitation number
N4523A20Q4071
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document summarizes a federal solicitation for demineralizers. The solicitation is a 100% small business set-aside issued by the Department of the Navy Naval Supply Systems Command seeking quotes for demineralizers to be delivered to Naval Base Kitsap, Puget Sound Naval Shipyard in Bremerton, Washington. The solicitation requests quotes for seven demineralizers with delivery dates of 2 December 2020, 1 February 2022, and 14 December 2022. Quotes must be submitted electronically by 23 September 2020 to two Navy email addresses and include the RFQ number, company information, completed specification sheet, and technical description of items. Award will be made to the lowest priced technically acceptable offeror on a firm-fixed price basis.

View the file

Other files for this federal contract opportunity

Other files attached to Demineralizers, newest first.
File Type Posted
Specifications for N4523A20Q4071 (revisied)(JF).docx DOCX document
Combined Synopsis Document for N4523A20Q4071.docx DOCX document
0138VL00-00001-0138-VL00 DID A003 DI-MISC-80678.pdf PDF
0138VL00-00001-0138-VL00 DID A006 DI-SESS-82038.pdf PDF
0138VL00-00001-0138-VL00 Demin ODS.pdf PDF
0138VL01-00002-0138-VL01 Demin ODS.pdf PDF
0138VL00-00001-0138-VL00 A008 CDRL_Certified_Dewatering_Procedure - Signed.pdf PDF
0138VL00-00001-0138-VL00 DID A002 DI-SESS-81000F.pdf PDF
0138VL00-00001-0138-VL00 A007 CDRL_MT_Inspection_Report - Signed.pdf PDF
0138VL00-00001-0138-VL00 A003 CDRL_Tapped_Lifting_Hole_Material_Test - Signed.pdf PDF
0138VL00-00001-0138-VL00 DID A005 DI-MISC-81391A.pdf PDF
0138VL00-00001-0138-VL00 Demineralizer_Technical_Specification_Sheet.docx DOCX document
0138VL00-00001-0138-VL00 A001 CDRL_COC - Signed.pdf PDF
0138VL00-00001-0138-VL00 DID A004 DI-NDTI-80809B.pdf PDF
0138VL00-00001-0138-VL00 A004 CDRL_Hydrostatic_Test_Report_Material_Test - Signed.pdf PDF
0138VL00-00001-0138-VL00 A002 CDRL_Drawing_Review - Signed.pdf PDF
0138VL00-00001-0138-VL00 A006 CDRL_Load_Test_Report - Signed.pdf PDF
0138VL00-00001-0138-VL00 Demineralizer MR.docx DOCX document
0138VL00-00001-0138-VL00 A005 CDRL_Pre-Post_Load_Test_Inspection - Signed.pdf PDF
0138VL01-00002-0138-VL00 Demineralizer_Technical_Specification_Sheet.docx DOCX document
0138VL00-00001-0138-VL00 DID A007 DI-NDTI-80809B.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Equipment Installation Instructions

Number: DI-MISC-81321A Approval Date: 20130419

AMSC Number: N9364 Limitation: N/A

DTIC Applicable: N/A GIDEP Applicable: N/A

Office of Primary Responsibility: AS/PMA-207

Applicable Forms: N/A

Use/Relationship:

This Document provides equipment installation, operation, and maintenance instructions.

This Data Item Description (DID) contains the format, content, and intended use information, and content preparation instructions for the data product resulting from the work task described in the contract Statement of

Work or Performance Work Statement.

This DID supersedes DI-MISC-81321.

Requirements:

1. Format: The data shall be in Contractor format or if a commercial commodity as designated per FAA regulations.

2. Content: The Equipment Installation Instructions shall have a title page containing the title, date, application, and document number.

Section 1. Installation Instructions. The equipment installation instructions include step-by-step assembly, mounting and connection procedures, and grounding and bonding procedures and procedures to demonstrate that the equipment is operating correctly. The instructions shall include the information necessary for personnel to properly engineer the installation of the system. The instruction shall include dimensions of the equipment, mounting brackets, consoles/panels, wiring and pictures to assist in the location of wiring runs. The instructions are in sufficient detail to enable a technician with little or no formal training on the equipment to perform installation functions.

Section 2. Operations Instructions. The operations instructions contain the complete, step-by-step description

Source: http://assist.dla.mil -- Downloaded: 2019-08-07T17:19Z Check the source to verify that this is the current version before use.

ps180296 Highlight ps180296 Highlight ps180296 Highlight ps180296 Highlight ps180296 Highlight ps180296 Highlight ps180296 Highlight ps180296 Highlight

DI-MISC-81321A

of all operating procedures. The instructions are in sufficient detail to enable a technician with little or no formal training on the equipment to perform operational functions.

Section 3. Maintenance Instructions. The maintenance instructions contain the complete, step-by-step description of the following for each subsystem and assembly:

a. All maintenance procedures and adjustments performed during installation.

b. All maintenance procedures and actions required to diagnose and locate any fault of any part of the system during and after installation.

c. All test equipment required to inspect, test, calibrate, service, repair, overhaul and end items shall be identified. This information shall include the identification of test cables, connectors, extender kits, and adapters required.

3. The instructions are in sufficient detail to enable a technician with little or no formal training on the equipment to perform maintenance functions.

4. END OF DI-MISC-81321A.