0100000 – General Information
| 1.3 |
| Acquisition of Additional Work |
| 1.4 |
| Background Information |
| 1.5 |
| Verification of Workload and Conditions |
| 1.8 |
| Navy Approach to Service Contracting |
| 1.8.1 |
| Partnering Philosophy |
| 1.8.2 |
| Contractor's Knowledge |
| 1.8.3 |
| Industry Best Practices |
| 1.11 |
| Technical Proposal Certification |
0100000 – General Information
| Spec Item |
| Title |
| Description |
| 1.1 |
| Outline of Services |
| Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Dahlgren Naval Support Facility (NSF), |
Dahlgren, VA.
The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).
Annex 1 General Information
Annex 2 Management and Administration
Annex 3 Command and Staff
Annex 4 Public Safety
Annex 5 Air Operations
Annex 6 Port Operations
Annex 7 Ordnance
Annex 8 Range Operations
Annex 9 Health Care Support
Annex 10 Supply
Annex 11 Personnel Support
Annex 12 Morale, Welfare and Recreation Support
Annex 13 Galley
Annex 14 Housing
Annex 15 Facilities Support
Annex 16 Utilities
Annex 17 Base Support Vehicles and Equipment
Annex 18 Environmental
| 1.2 |
| Project Location |
| The work shall be performed at: |
Dahlgren NSF, VA
| 1.3 |
| Acquisition of Additional Work |
| The Government reserves the right to acquire additional Facility Chemical Services in addition to the services and locations identified in the recurring work requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the Non-Recurring Work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract. |
| 1.4 |
| Background Information |
| HVAC Water Treatment and Testing Services are important to assure |
facility systems water condition quality is maintained within specified peripherals. Facility systems utilizing properly conditioned water optimize utility efficiency, extend equipment life, and maintain regulatory requirements.
| 1.5 |
| Verification of Workload and Conditions |
| Throughout the PWS, the workload data is generally referred to as being |
located in Section J. Section J provides data such as inventories, maps, floor plans, and tables to represent the type, quantity and location of services to be provided. However, offerors are encouraged to visit the project site during the site visit for offerors and to visit the technical library during posted hours as part of its due diligence to assess the nature of work and conditions under which work is to be performed.
| 1.6 |
| Climate Patterns |
| Virginia has weather influences derived from the Atlantic Ocean, Great |
Lakes, and Midwest. The Atlantic Ocean moderates temperatures along the coast and the temperatures rarely get below 0F. Summer tends to be moderately hot and humid, especially along the coast with temperatures consistently above 85F and 65% humidity. Northern and Western
Virginia’s climate and precipitation are widely influenced by the Blue
Ridge, Pocono, and Catskill mountains creating mild Spring and Fall
Seasons with pleasant weather punctuated by occasional late winter storms in April or early frosts in September. The only constant across the region is generous precipitation, usually between about 35 and 40 inches evenly distributed throughout the year. This generous pattern is the result of not only Gulf of Mexico moisture tracking up the Appalachians, storms
(including hurricanes) tracking northward up the coast, and storms blowing westward from the Atlantic. In winter, we are affected by the frigid Alberta Clippers and the big Nor'easters that bring wind and snow.
The average annual snowfall is normally less than 12 inches.
| 1.7 |
| Related Information |
| There are four types of Related Information that can be found in the |
Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked
“Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in
"Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
| 1.8 |
| Navy Approach to Service Contracting |
| The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations. The Navy also supports the following principles: |
| 1.8.1 |
| Partnering Philosophy |
| The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion. Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners. |
| 1.8.2 |
| Contractor's Knowledge |
| The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level. |
| 1.8.3 |
| Industry Best Practices |
| The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results). |
| 1.9 |
| Standard Template |
| Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations. |
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Recurring Work requirements. Specification item 4 will always contain the Non-recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.
| 1.10 |
| Navy PBSA Approach |
| The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan. |
| 1.11 |
| Technical Proposal Certification |
| The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract. |
0200000 – Management and Administration
Table of Contents
| 2 |
| Management and Administration |
| 2.1 |
| Definitions and Acronyms |
| 2.2.1 |
| Government Regular Working Hours |
| 2.2.1.1 |
| Observed Federal Holidays |
| 2.2.1.2 |
| Restriction to Contractor Working Hours |
| 2.2.2 |
| Wage Determinations |
| 2.2.3 |
| Requirements Hierarchy |
| 2.3 |
| General Administrative Requirements |
| 2.3.1 |
| Required Conferences and Meetings |
| 2.3.2 |
| Training for Maintenance and Operation of New and Replacement Systems and Equipment |
| 2.3.3.1 |
| Informal Partnering |
| 2.3.3.2 |
| Contract Partnering Administration |
| 2.3.3.3 |
| Contract Partnering Session Attendees |
| 2.3.4 |
| Permits and Licenses |
| 2.3.5.1 |
| Certificate of Insurance |
| 2.3.5.2 |
| Minimum Insurance Amounts |
| 2.3.6 |
| Protection of Government Property |
| 2.3.7 |
| Government Information Technology (IT) System |
| 2.3.8 |
| Directives, Instructions, and References |
| 2.3.9 |
| Invoicing Procedures |
| 2.4 |
| Government-Furnished Property, Materials and Services |
| 2.4.1 |
| Government-Furnished Facilities (GFF) |
| 2.4.2 |
| Government-Furnished Utilities |
| 2.4.3 |
| Government-Furnished Materials (GFM) |
| 2.4.4 |
| Government-Furnished Equipment (GFE) |
| 2.4.5 |
| Government-Furnished Services (GFS) |
| 2.5 |
| Contractor-Furnished Items |
| 2.6.5 |
| Service Interruptions |
| 2.6.6.2 |
| MAXIMO Method of Data Entry |
| 2.6.7 |
| Quality Management System (QMS) |
| 2.6.7.1 |
| Quality Management (QM) Plan |
| 2.6.7.2 |
| Quality Inspection and Surveillance |
| 2.6.7.3 |
| Quality Inspection and Surveillance Report |
| 2.6.8 |
| Property Management Plan |
| 2.6.9 |
| System and Equipment Replacement |
| 2.7 |
| Personnel Requirements |
| 2.7.1.1 |
| Project Manager (PM) |
| 2.7.1.3 |
| Site Safety and Health Officer (SSHO) |
| 2.7.1.4 |
| Environmental/Energy Manager |
| 2.7.2 |
| Employee Requirements |
| 2.7.2.1 |
| Employee Certification and Training |
| 2.7.2.2 |
| Employee Appearance |
| 2.7.2.4 |
| Identification as Contractor Employee |
| 2.7.2.5 |
| Removal of Employees |
| 2.7.2.6 |
| Proof of Legal Residency |
| 2.7.3 |
| Enterprise-wide Contractor Manpower Reporting Application (eCMRA) |
| 2.8 |
| Security Requirements |
| 2.8.4 |
| Access to Installation |
| 2.8.5 |
| Access to Buildings |
| 2.8.6 |
| Access Arrangements |
| 2.8.6.1 |
| Escort Arrangement for Secured Areas |
| 2.8.7 |
| Security Clearances |
| 2.8.8 |
| Access to Sensitive Unclassified Information |
| 2.9 |
| Contractor Safety Program |
| 2.9.1 |
| Accident Prevention Plan (APP) |
| 2.9.2 |
| Activity Hazard Analysis (AHA) |
| 2.9.3 |
| Safety and Occupational Health (SOH) Risks and Compliance Plans |
| 2.9.3.1 |
| Alcohol and Drug Abuse Prevention Plan |
| 2.9.3.2 |
| Chemical Hazard Communication Program |
| 2.9.3.3 |
| Confined Space Program |
| 2.9.3.4 |
| Critical Lift Plan |
| 2.9.3.5 |
| Fall Prevention and Protection Plan |
| 2.9.4.1 |
| Crane Inspections |
| 2.9.5 |
| Accident and Damage Reporting |
| 2.9.5.1 |
| Accident Reporting and Notification Criteria |
| 2.9.7 |
| Monthly On-Site Labor Report |
| 2.9.8 |
| OSHA Citations and Violations |
| 2.9.9 |
| Safety Inspections and Monitoring |
| 2.9.10 |
| Safety Certification |
| 2.9.11 |
| Safety Apparel on Jobsites |
| 2.9.12 |
| Emergency Medical Treatment |
| 2.10 |
| Environmental Management and Sustainability |
| 2.10.1 |
| Energy Management Program |
| 2.10.1.1 |
| Water Conservation Plan |
| 2.10.1.2 |
| Energy Efficient Products |
| 2.10.2 |
| Environmental Protection |
| 2.10.2.1 |
| ODS Requirements for Refrigerant Recycling |
| 2.10.2.2 |
| Non-Hazardous Waste Disposal |
| 2.10.2.3 |
| Hazardous Waste Disposal |
| 2.10.2.4 |
| Spill Prevention, Containment, and Clean-up |
| 2.10.2.5 |
| Hazardous Material Management |
| 2.10.2.6 |
| Protection of Endangered and Threatened Species (Flora and Fauna) |
| 2.10.2.9 |
| Asbestos Containing Material (ACM) |
| 2.10.3 |
| Sustainable Procurement and Practices |
| 2.10.3.1 |
| Environmentally Preferable Products |
| 2.10.3.2 |
| Use of Recovered Materials |
| 2.10.3.3 |
| Use of Biobased Products |
| 2.11 |
| Disaster Preparedness |
| 2.14 |
| Recurring Work Procedures |
| 2.14.1 |
| Notification to the Government for Work Above the Recurring Work Limitations |
| 2.14.2 |
| Recurring Work Exhibit Line Item Numbers (ELINs) |
| 2.14.3 |
| Common Output Level Standards (COLS) Options |
| 2.14.3.1 |
| Optional COLS CLINs for Region Funded Facility Services |
| 2.14.3.2 |
| Option to Change COLS at Contract Award |
| 2.14.3.3 |
| Option to Change COLS at Exercise of an Option Period |
| 2.15.1 |
| Unit Priced Task (UPT) Work (Non-Negotiated) |
| 2.15.1.1 |
| Acceptance and Performance |
| 2.15.1.2 |
| Invoicing and Receiving Payment |
| 2.15.2 |
| Unit Priced Labor (UPL)Work (Negotiated) |
| 2.15.2.1 |
| Non-recurring Preparation of Proposals |
| 2.15.2.1.1 |
| Labor Requirements |
| 2.15.2.1.2 |
| Material and Equipment Requirements |
| 2.15.2.2 |
| Issuance of Final Task Order |
| 2.15.3 |
| Non-recurring ELINS |
0200000 - Management and Administration
| Spec Item |
| Title |
| Description |
| 2 |
| Management and Administration |
| 2.1 |
| Definitions and Acronyms |
| Definitions and Acronyms are listed in J-0200000-01. |
| 2.2.1 |
| Government Regular Working Hours |
| The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.>> |
| 2.2.1.1 |
| Observed Federal Holidays |
| The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. |
| 2.2.1.2 |
| Restriction to Contractor Working Hours |
| If the Contractor wishes to work outside of the Government's regular |
working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular
Working Hours per Section F. Excludes work to be performed during specified hours. There will be no additional compensation for work performed outside regular working hours.
| 2.2.2 |
| Wage Determinations |
| Wage Determinations are included in J-0200000-02. |
| 2.2.3 |
| Requirements Hierarchy |
| Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on. |
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
| 2.3 |
| General Administrative Requirements |
| 2.3.1 |
| Required Conferences and Meetings |
| The Contractor may be required to attend administrative and coordination |
meetings, pre-performance conferences, performance assessment board meetings, partnering sessions, etc., as scheduled by the KO.
| 2.3.2 |
| Training for Maintenance and Operation of New and Replacement Systems and Equipment |
| When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government. |
| 2.3.3 |
| Partnering |
| To increase the likelihood of successful performance of this contract, the |
Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractors teams, including senior management personnel must participate. The partnership will draw on the strength each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
Partnering should accomplish three goals:
- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
| 2.3.3.1 |
| Informal Partnering |
| The Contracting Officer shall organize the initial Partnering Meeting with |
key personnel of the project team, including Contractor's personnel and
Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (video and/or accompanying forms) provided by
Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
| 2.3.3.2 |
| Contract Partnering Administration |
| Upon award, the ACO will contact the Contractor, supported |
command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
| 2.3.3.3 |
| Contract Partnering Session Attendees |
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager
* Quality Manager
Site Safety and Health Officer
| 2.3.4 |
| Permits and Licenses |
| The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F. |
| 2.3.5 |
| Insurance |
| The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period. |
| 2.3.5.1 |
| Certificate of Insurance |
| The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause. |
| 2.3.5.2 |
| Minimum Insurance Amounts |
| The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage: |
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law
| 2.3.6 |
| Protection of Government Property |
| During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government. |
| 2.3.7 |
| Government Information Technology (IT) System |
| Information about NMCI may be obtained at http://www.eds.com/nmci. |
| 2.3.8 |
| Directives, Instructions, and References |
| Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief |
of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
| 2.3.9 |
| Invoicing Procedures |
| Refer to Section G for invoicing instructions. |
| 2.3.10 |
| Forms |
| Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-04. |
| 2.4 |
| Government-Furnished Property, Materials and Services |
| In accordance with FAR 52.245, GOVERNMENT PROPERTY and |
NAVFAC Clause 5252.245-9300, GOVERNMENT-FURNISHED
PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the
Contractor certain Government-owned facilities, utilities, materials, equipment and services for use in connection with this contract as stated below.
| 2.4.1 |
| Government-Furnished Facilities (GFF) |
| The Government will not provide office space and operational facilities to |
the Contractor. The Contractor shall secure and maintain the necessary office space and other facilities required for the performance of this contract at its expense.
| 2.4.2 |
| Government-Furnished Utilities |
| The Government will furnish water and electricity at existing outlets |
required for the work to be performed under the contract at no cost to the
Contractor. Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the
Contractor at no cost to the Government.
| 2.4.3 |
| Government-Furnished Materials (GFM) |
| The Government will not provide materials to the Contractor. |
| 2.4.4 |
| Government-Furnished Equipment (GFE) |
| The Government will not provide any equipment to the Contractor. |
| 2.4.5 |
| Government-Furnished Services (GFS) |
| The Government will not provide any services to the Contractor. |
| 2.5 |
| Contractor-Furnished Items |
| Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Material Safety Data Sheets (MSDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract. |
| 2.6 |
| Management |
| The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met. |
| 2.6.1 |
| Work Reception |
| The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours. |
| 2.6.2 |
| Work Control |
| The Contractor shall implement all necessary work control procedures to |
ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
| 2.6.3 |
| Work Schedule |
| The Contractor's work shall not interfere with normal Government |
business. In those cases where some interference is unavoidable, the
Contractor shall minimize the impact and effects of the interference. The
Contractor shall provide advance access of all of its work schedules to the Government. Schedules shall be submitted to the KO for approval as specified in Section F, Deliverables and approved before work commences. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.
| 2.6.4 |
| Deliverables |
| Records and reports are specified in Section C and listed as deliverables in Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Section F. |
Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
| 2.6.5 |
| Service Interruptions |
| If any utilities or other services must be discontinued (even temporarily) |
due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures.
Contractor shall notify customer (facility coordinator, manager, or affected tenants), local KO, Facility Services Contract Manager (FSCM), and assigned Performance Assessment Representative (PAR) at least 14 calendar days and 2 business days before scheduled/planned service interruption/ occurrence. If the discontinued service is due to an emergency breakdown, the Contractor shall notify t customer (facility coordinator, manager, or affected tenants), local KO, Facility Services
Contract Manager (FSCM), and assigned Performance Assessment
Representative (PAR) immediately or as soon as practicable due to safety and service restoration.
| 2.6.7 |
| Quality Management System (QMS) |
| The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address: |
· Accurate documentation of work processes, procedures, and output measures.
· A systematic procedure for assessing compliance with performance objectives and standards.
· Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
· Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
| 2.6.7.1 |
| Quality Management (QM) Plan |
| The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance. |
The Contractor’s QM Plan shall include, at a minimum, the following:
· Policy and objectives of Quality Management System (QMS)
· Quality organization
· List of personnel
· Responsibilities & lines of authority
· Training and qualifications
· Approach to assuring quality of services provided and conformance with performance objectives and standards
· Methods and procedures for effective planning, operation and control of processes and performance of work
· Procedures for inspection and surveillance of services
· Scheduling and performance of inspection and surveillance
· Measurement, data collection and analysis
· Corrective action, preventive action, and continuous improvement
· Oversight of subcontracted work
· Documentation and records management
· Communication with government (customers)
| 2.6.7.2 |
| Quality Inspection and Surveillance |
| The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract. |
| 2.6.7.3 |
| Quality Inspection and Surveillance Report |
| The Contractor shall submit a copy of the Contractor Quality Inspection |
and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month.
The Government may adjust the frequency of the submittal based on the
Contractor’s quality of performance.
| 2.6.9 |
| System and Equipment Replacement |
| The Contractor shall maintain the integrity and performance of existing |
energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced.
Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.
| 2.7 |
| Personnel Requirements |
| The Contractor shall comply with the personnel requirements stated below. |
| 2.7.1 |
| Key Personnel |
| The Contractor shall submit a List of Key Personnel and Qualifications |
per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.
The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality
Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract.
| 2.7.1.1 |
| Project Manager (PM) |
| The Contractor shall provide a PM and designated alternate who have full |
authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be available and on-site within one hour during the Government's regular working hours at Government request.
| 2.7.1.2 |
| Quality Manager |
| The Contractor shall provide a Quality Manager or designated alternate |
and shall be available on site within one hour during the Government's regular working hours. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project
Manager.
The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:
-The Quality Manager shall have at least three years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity.
-The Quality Manager may be the same person as the SSHO.
| 2.7.1.3 |
| Site Safety and Health Officer (SSHO) |
| The SSHO must meet the requirements of EM 385-1-1 Section 1 and |
ensure that the requirements of 29 CFR 1910 and 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one Competent Person available within one hour at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be available at each site when work is being performed to implement and administer the
Contractor's safety program and government-accepted Accident
Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY
AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.
A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be available at all times when the work that presents the hazards associated with their professional expertise is being performed. Contractor shall provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.
The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:
The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years’ experience if he possesses a
Certified Safety Professional (CSP) or safety and health degree. The
SSHO shall have completed the OSHA 30-hour General Industry
Procedures safety class or equivalent and maintain competency through
24 hours of formal safety and health related coursework every four years.
The SSHO may be the same person as the project manager but shall have fulfilled the pre-requisite qualification and experience.
| 2.7.1.4 |
| Environmental/Energy Manager |
| The Contractor shall provide an Environmental/Energy Manager whose |
primary duty and responsibility is to ensure Contractor operations adhere to the goals and policies of the Environmental Management System, the
Installation Energy Plan, and other specified Sustainability requirements affecting this contract. The Environmental/Energy Manager shall develop, implement and monitor environmental strategies, policies and programs that promote sustainable development and examine the contract activities to establish where improvements can be made and ensure compliance with environmental legislation and energy policy.
The Environmental/Energy Manager shall have a minimum two years experience with environmental procedures similar to those of this contract; familiarity with Environmental Management Systems (EMSs);
and knowledge of environmental regulations and federal energy laws and policy (including energy and water reduction requirements and renewable energy requirements) that are applicable to operations similar to those of this contract. The Environmental/Energy Manager role can be fulfilled by any competent Key Personnel.
| 2.7.2 |
| Employee Requirements |
| The Contractor shall provide experienced, qualified, and capable |
personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.
| 2.7.2.1 |
| Employee Certification and Training |
| The Contractor shall maintain personnel certification, training, and |
licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for
Government review within 4 hours of request.
| 2.7.2.2 |
| Employee Appearance |
| The Contractor shall ensure that all employees present a professional |
appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All
Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.
| 2.7.2.3 |
| Employee Conduct |
| Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner. |
| 2.7.2.4 |
| Identification as Contractor Employee |
| Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence. |
| 2.7.2.5 |
| Removal of Employees |
| The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security. |
| 2.7.2.6 |
| Proof of Legal Residency |
| No employee or representative of the Contractor will be admitted to the |
site of work unless satisfactory Proof of Legal Residency is furnished per Section F.
| 2.7.3 |
| Enterprise-wide Contractor Manpower Reporting Application (eCMRA) |
The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://doncmra.nmci.navy.mil.
Per Section F, reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk , linked at https://doncmra.nmci.navy.mil.
| 2.8 |
| Security Requirements |
| The Contractor shall comply with all Federal, state, and local security |
statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The
Contractor shall ensure that all security/entrance clearances are obtained.
| 2.8.1 |
| Employee Listing |
| The Contractor shall maintain a current Employee List and submit per |
Section F. The list shall include employee’s name, social security number, home address, phone number, date and place of birth, citizenship, resident alien card number if applicable, supervisor, company, and level of security clearance.
| 2.8.2 |
| Vehicles |
| The company name shall be displayed on each of the Contractor's vehicles |
in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable. Contractor collection vehicles shall be operated in accordance with activity rules and regulations while in the activity area, and shall be kept closed when moving or when not actually engaged in collecting wastes. All vehicular equipment shall be maintained in good repair and in a safe, clean, and well-painted condition. Vehicles that are identified as unserviceable or unsightly by KO or appointed Government authority shall be repaired or replaced within ten working days at no additional cost to the Government. The Contractor shall have sufficient equipment for backup of regularly assigned vehicles to insure completion of contract requirements in the event of breakdowns or other equipment problems.
| 2.8.3 |
| Passes and Badges |
| All Contractor employees shall obtain the required employee and vehicle |
passes. The Contractor employees must be able to obtain Common
Access Cards (CAC) in accordance with security requirements. Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within 10 calendar days.
| 2.8.4 |
| Access to Installation |
| All Contractor personnel shall obtain access to the installation by |
participating in the Navy Commercial Access Control System (NCACS), or by obtaining passes each day from the Base Pass and Identification
Office. Costs for obtaining passes through the NCACS are the responsibility of the Contractor. One-day passes, issued through the Base
Pass and Identification Office, will be furnished without charge.
The Contractor shall furnish a completed EMPLOYMENT ELIGIBILITY
VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9). Immediately report instances of lost or stolen badges to the Contracting Officer.
| 2.8.4.1 |
| NCACS Program |
| NCACS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. |
The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued NCACS participation and installation access privileges. Under the NCACS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON).
Information on costs and requirements to participate and enroll in NCACS is available at http://www.rapidgate.com/vendors/how-to-enroll or by calling 1-877-727-4342.
| 2.8.4.2 |
| One-Day Passes |
| Participation in the NCACS is not mandatory, and if the Contractor |
chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the NCACS.
Contractor personnel requiring Daily Passes at Dahlgren NSF, Dahlgren, VA shall fully complete and submit Approved AC PAS ID Form, SECNAV 5512 1 11787 , in section J-0200000-04 and Expected Visitor
Form, NSASP 5512/17V (Rev04-11), in J-0200000-04 no later than 5 business days before scheduled visit. Completed forms can be emailed to the assigned NAVFAC/FSC/PAR or representative for submission to Pass and ID section.
| 2.8.5 |
| Access to Buildings |
| The Contractor shall monitor and control access into restricted areas under |
their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The
Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.
| 2.8.6 |
| Access Arrangements |
| The Contractor shall make all arrangements through the appropriate office |
necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor.
The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.
| 2.8.6.1 |
| Escort Arrangement for Secured Areas |
| The Contractor shall make arrangements for Government escort into |
secured areas requiring escort. The KO will provide information on applicable buildings, spaces and the appropriate point of contact.
The Contractor may experience delays while waiting for escorts. The
Government estimates the wait period can be up to 15 minutes. The
Contractor shall notify the Government Performance Assessment
Representative (PAR) and appropriate point of contract if an escort is not available after 15 minutes and access to accomplish the work is denied.
Unscheduled requirements, e.g., trouble calls, may require a longer wait for an escort.
| 2.8.7 |
| Security Clearances |
| The Contractor shall obtain all required corporate and personnel Security |
Clearances prior to commencement of work. The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending.
| 2.8.8 |
| Access to Sensitive Unclassified Information |
| The Contractor personnel whose work involves access to sensitive |
unclassified information shall undergo a National Agency Check
Investigation (NACI) to verify their suitability. If the Contractor personnel currently have a favorably adjudicated NACI the Contractor shall notify the Government Command Security Manager who will validate this in the Joint Personnel Adjudication System (JPAS).
The Contractor shall request from the Government for access to the E-QIP
Direct program for the Contractor employees to complete the SF-85 form on line for an NACI. The Security Manager will determine suitability.
Upon a favorable NACI, the Contractor personnel shall provide the completed Personnel Security Investigation (PSI) to the Security Manager along with the original signed release statements, applicant fingerprint card (FD87), and an OF-306 Declaration for Federal Employment per
Section F. The Contractor shall be responsible for providing the fingerprint card.
The request shall be renewed annually or for the duration of the contract if less than one year.
| 2.8.9 |
| Employee Status |
| The Contractor shall notify the KO of any changes to any employee’s status to include, but not limited to, termination, convictions/arrests, adverse actions taken on the job for any reason or any other documented misbehavior that may affect, or have the potential to affect, security standing in terms of access to federal facilities or IT systems. |
| 2.9 |
| Contractor Safety Program |
| The Contractor shall develop and implement a Safety Program detailing |
how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers
Safety and Health Requirements Manual, EM 385-1-1 and Public Law 91-
596, Occupational Safety and Health Act.
| 2.9.1 |
| Accident Prevention Plan (APP) |