01 N40080-22-D-XXXX ELINs - Solicitation2-Blank.xlsx

XLSX spreadsheet 51 KB Posted

Attached to
HVAC Chemical Treatment and Testing Services Federal contract opportunity
Solicitation number
N4008022B9502
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Chemical Treatment and Testing Services, newest first.
File Type Posted
14 N4008022B9502 Bid Abstract.pdf PDF
11 Amendment 04.pdf PDF
11 Amendment 03.pdf PDF
01 Dahlgren Chiller Inventory.pdf PDF
01 Dahlgren Boiler Inventory.pdf PDF
11 Amendment 02.pdf PDF
11 Amendment 01.pdf PDF
01 Section F Complete.doc DOC document
11 N4008022B9502.pdf PDF
Expected Visitor Form NSASP 5512_17V AUG 2020.docx DOCX document
SECNAV_5512_1_11787 APPROVED AC PASS ID FORM 05282014.pdf PDF
01 Section C Complete.doc DOC document
01 Copy of N40080-22-D-XXXX Inventory - Solicitation - 020122.xlsx XLSX spreadsheet
01 Section J Complete.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ExA

ATTACHMENT J-0200000-05
N40080-22-D-XXXX HVAC Water Testing and Treatment Services
RECURRING WORK EXHIBIT LINE ITEM NUMBERS
BY - EXHIBIT A
ELINSUB ELINDescriptionQuantityUnit of IssueUnit PriceTotal
PWD South Potomac Dahlgren NSF, VA
A001PWD South Potomac Dahlgren NSWC
AAHVAC Chilled Water Treatment and Testing Building 18012Month
HVAC Chilled Water Treatment and Testing Building 18312Month
HVAC Chilled Water Treatment and Testing Building 22112Month
HVAC Chilled Water Treatment and Testing Building 147012Month
HVAC Chilled Water Treatment and Testing Building 149012Month
HVAC Chilled Water Treatment and Testing Building 150012Month
HVAC Chilled Water Treatment and Testing Building 151012Month
HVAC Chilled Water Treatment and Testing Building 153012Month
HVAC Chilled Water Treatment and Testing Building 156012Month
HVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 15012Month
HVAC Boiler Water Treatment and Testing Building 18312Month
HVAC Boiler Water Treatment and Testing Building 19412Month
HVAC Boiler Water Treatment and Testing Building 20212Month
HVAC Boiler Water Treatment and Testing Building 37112Month
HVAC Boiler Water Treatment and Testing Building 45612Month
HVAC Boiler Water Treatment and Testing Building 156012Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
PWD South Potomac Dahlgren NSWC Subtotal$0.00$0.00
A002PWD South Potomac Dahlgren ATRC
AASKID Chilled Water Treatment and Testing Building 152012Month
PWD South Potomac Dahlgren ATRC Subtotal$0.00$0.00
A003PWD South Potomac Dahlgren NDW
AAHVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, BMD 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 22012Month
HVAC Boiler Water Treatment and Testing Building 96312Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Chilled Water Treatment and Testing Building 152012Month
HVAC Boiler Water Treatment and Testing Building 152012Month
HVAC Boiler Water Treatment and Testing Building 20612Month
HVAC Chilled and Boiler Water Treatment and Testing Building 161012Month
PWD South Potomac Dahlgren NDW Subtotal$0.00$0.00
PWD South Potomac Dahlgren NAVFAC
ABHVAC Boiler Water Treatment and Testing Building 48112Month
HVAC Boiler Water Treatment and Testing Building 962A12Month
HVAC Boiler Water Treatment and Testing Building 128112Month
PWD South Potomac Dahlgren NAVFAC Subtotal$0.00$0.00
PWD South Potomac Dahlgren CNIC Total$0.00$0.00
A004PWD South Potomac Dahlgren BMD
AAHVAC Chilled Water Treatment and Testing Building 1705A12Month
PWD South Potomac Dahlgren BMD Subtotal$0.00$0.00
A005PWD South Potomac Dahlgren Air Force
AAHVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
PWD South Potomac Dahlgren Air Force Subtotal$0.00$0.00

PWD South Potomac Dahlgren NSF (A001-A005) Total $0.00 $0.00

ExB

ATTACHMENT J-0200000-06
N40080-17-D-2502 HVAC Water Testing and Treatment Services
NON-RECURRING WORK EXHIBIT LINE ITEM NUMBERS
BASE PERIOD - EXHIBIT B
ELINSupplies/ServicesEstimated QuantityUnit of IssueUnit PriceExtended Price
PWD South Potomac Dahlgren NSF,VA
B001The Contractor shall conduct replacement of chemical feed pump(s) and associated tubing/plumbing for non operational chemical feed pump systems. Contractor shall provide all labor, material, and tools/equipment for replacement, render replacement operational, and maintain replacement as existing designated inventory. Replacement shall of new condition and like composition, quality, and funtion.8Each
B002The Contractor shall conduct installation of new (non existing) chemical feed pump(s) and associated tubing/plumbing. Contractor shall provide all labor, material, and tools/equipment for new installation and render newly installed equipment operational. Contractor installation responsibility shall be from Chemical containment to point of chemical injection.8Each
B003The Contractor shall conduct replacement chemical feed pump controllers for non operational chemical feed pump conttrollers. Contractor shall provide all labor, material, and tools/equipment for new installation and render newly installed equipment operational. Replacement shall of new condition and like composition, quality, and funtion.6Each
TOTAL NON-RECURRING WORK PRICE (B001 through B003)- Not to Exceed$0.00

ExC

ATTACHMENT J-0200000-05
N40080-22-D-XXXX HVAC Water Testing and Treatment Services
RECURRING WORK EXHIBIT LINE ITEM NUMBERS
OY1 - EXHIBIT C
ELINSUB ELINDescriptionQuantityUnit of IssueUnit PriceTotal
PWD South Potomac Dahlgren NSF, VA
A001PWD South Potomac Dahlgren NSWC
AAHVAC Chilled Water Treatment and Testing Building 18012Month
HVAC Chilled Water Treatment and Testing Building 18312Month
HVAC Chilled Water Treatment and Testing Building 22112Month
HVAC Chilled Water Treatment and Testing Building 147012Month
HVAC Chilled Water Treatment and Testing Building 149012Month
HVAC Chilled Water Treatment and Testing Building 150012Month
HVAC Chilled Water Treatment and Testing Building 151012Month
HVAC Chilled Water Treatment and Testing Building 153012Month
HVAC Chilled Water Treatment and Testing Building 156012Month
HVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 15012Month
HVAC Boiler Water Treatment and Testing Building 18312Month
HVAC Boiler Water Treatment and Testing Building 19412Month
HVAC Boiler Water Treatment and Testing Building 20212Month
HVAC Boiler Water Treatment and Testing Building 37112Month
HVAC Boiler Water Treatment and Testing Building 45612Month
HVAC Boiler Water Treatment and Testing Building 156012Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
PWD South Potomac Dahlgren NSWC Subtotal$0.00$0.00
A002PWD South Potomac Dahlgren ATRC
AASKID Chilled Water Treatment and Testing Building 152012Month
PWD South Potomac Dahlgren ATRC Subtotal$0.00$0.00
A003PWD South Potomac Dahlgren NDW
AAHVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, BMD 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 22012Month
HVAC Boiler Water Treatment and Testing Building 96312Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Chilled Water Treatment and Testing Building 152012Month
HVAC Boiler Water Treatment and Testing Building 152012Month
HVAC Boiler Water Treatment and Testing Building 20612Month
HVAC Chilled and Boiler Water Treatment and Testing Building 161012Month
PWD South Potomac Dahlgren NDW Subtotal$0.00$0.00
PWD South Potomac Dahlgren NAVFAC
ABHVAC Boiler Water Treatment and Testing Building 48112Month
HVAC Boiler Water Treatment and Testing Building 962A12Month
HVAC Boiler Water Treatment and Testing Building 128112Month
PWD South Potomac Dahlgren NAVFAC Subtotal
PWD South Potomac Dahlgren CNIC Total$0.00$0.00
A004PWD South Potomac Dahlgren BMD
AAHVAC Chilled Water Treatment and Testing Building 1705A12Month
PWD South Potomac Dahlgren BMD Subtotal$0.00$0.00
A005PWD South Potomac Dahlgren Air Force
AAHVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
PWD South Potomac Dahlgren Air Force Subtotal$0.00$0.00

PWD South Potomac Dahlgren NSF (A001-A005) Total $0.00 $0.00

ExD

ATTACHMENT J-0200000-06
N40080-17-D-2502 HVAC Water Testing and Treatment Services
NON-RECURRING WORK EXHIBIT LINE ITEM NUMBERS
OY 1 - EXHIBIT D
ELINSupplies/ServicesEstimated QuantityUnit of IssueUnit PriceExtended Price
PWD South Potomac Dahlgren NSF,VA
D001The Contractor shall conduct replacement of chemical feed pump(s) and associated tubing/plumbing for non operational chemical feed pump systems. Contractor shall provide all labor, material, and tools/equipment for replacement, render replacement operational, and maintain replacement as existing designated inventory. Replacement shall of new condition and like composition, quality, and funtion.8Each
D002The Contractor shall conduct installation of new (non existing) chemical feed pump(s) and associated tubing/plumbing. Contractor shall provide all labor, material, and tools/equipment for new installation and render newly installed equipment operational. Contractor installation responsibility shall be from Chemical containment to point of chemical injection.8Each
D003The Contractor shall conduct replacement chemical feed pump controllers for non operational chemical feed pump conttrollers. Contractor shall provide all labor, material, and tools/equipment for new installation and render newly installed equipment operational. Replacement shall of new condition and like composition, quality, and funtion.6Each
TOTAL NON-RECURRING WORK PRICE (D001 through D003)- Not to Exceed$0.00

ExE

ATTACHMENT J-0200000-05
N40080-22-D-XXXX HVAC Water Testing and Treatment Services
RECURRING WORK EXHIBIT LINE ITEM NUMBERS
OY2 - EXHIBIT E
ELINSUB ELINDescriptionQuantityUnit of IssueUnit PriceTotal
PWD South Potomac Dahlgren NSF, VA
A001PWD South Potomac Dahlgren NSWC
AAHVAC Chilled Water Treatment and Testing Building 18012Month
HVAC Chilled Water Treatment and Testing Building 18312Month
HVAC Chilled Water Treatment and Testing Building 22112Month
HVAC Chilled Water Treatment and Testing Building 147012Month
HVAC Chilled Water Treatment and Testing Building 149012Month
HVAC Chilled Water Treatment and Testing Building 150012Month
HVAC Chilled Water Treatment and Testing Building 151012Month
HVAC Chilled Water Treatment and Testing Building 153012Month
HVAC Chilled Water Treatment and Testing Building 156012Month
HVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 15012Month
HVAC Boiler Water Treatment and Testing Building 18312Month
HVAC Boiler Water Treatment and Testing Building 19412Month
HVAC Boiler Water Treatment and Testing Building 20212Month
HVAC Boiler Water Treatment and Testing Building 37112Month
HVAC Boiler Water Treatment and Testing Building 45612Month
HVAC Boiler Water Treatment and Testing Building 156012Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
PWD South Potomac Dahlgren NSWC Subtotal$0.00$0.00
A002PWD South Potomac Dahlgren ATRC
AASKID Chilled Water Treatment and Testing Building 152012Month
PWD South Potomac Dahlgren ATRC Subtotal$0.00$0.00
A003PWD South Potomac Dahlgren NDW
AAHVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, BMD 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 22012Month
HVAC Boiler Water Treatment and Testing Building 96312Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Chilled Water Treatment and Testing Building 152012Month
HVAC Boiler Water Treatment and Testing Building 152012Month
HVAC Boiler Water Treatment and Testing Building 20612Month
HVAC Chilled and Boiler Water Treatment and Testing Building 161012Month
PWD South Potomac Dahlgren NDW Subtotal$0.00$0.00
PWD South Potomac Dahlgren NAVFAC
ABHVAC Boiler Water Treatment and Testing Building 48112Month
HVAC Boiler Water Treatment and Testing Building 962A12Month
HVAC Boiler Water Treatment and Testing Building 128112Month
PWD South Potomac Dahlgren NAVFAC Subtotal
PWD South Potomac Dahlgren CNIC Total$0.00$0.00
A004PWD South Potomac Dahlgren BMD
AAHVAC Chilled Water Treatment and Testing Building 1705A12Month
PWD South Potomac Dahlgren BMD Subtotal$0.00$0.00
A005PWD South Potomac Dahlgren Air Force
AAHVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
PWD South Potomac Dahlgren Air Force Subtotal$0.00$0.00

PWD South Potomac Dahlgren NSF (A001-A005) Total $0.00 $0.00

ExF

ATTACHMENT J-0200000-06
N40080-17-D-2502 HVAC Water Testing and Treatment Services
NON-RECURRING WORK EXHIBIT LINE ITEM NUMBERS
OY 2 - EXHIBIT F
ELINSupplies/ServicesEstimated QuantityUnit of IssueUnit PriceExtended Price
PWD South Potomac Dahlgren NSF,VA
F001The Contractor shall conduct replacement of chemical feed pump(s) and associated tubing/plumbing for non operational chemical feed pump systems. Contractor shall provide all labor, material, and tools/equipment for replacement, render replacement operational, and maintain replacement as existing designated inventory. Replacement shall of new condition and like composition, quality, and funtion.8Each
F002The Contractor shall conduct installation of new (non existing) chemical feed pump(s) and associated tubing/plumbing. Contractor shall provide all labor, material, and tools/equipment for new installation and render newly installed equipment operational. Contractor installation responsibility shall be from Chemical containment to point of chemical injection.8Each
F003The Contractor shall conduct replacement chemical feed pump controllers for non operational chemical feed pump conttrollers. Contractor shall provide all labor, material, and tools/equipment for new installation and render newly installed equipment operational. Replacement shall of new condition and like composition, quality, and funtion.6Each
TOTAL NON-RECURRING WORK PRICE (F001 through F003)- Not to Exceed$0.00

ExG

ATTACHMENT J-0200000-05
N40080-22-D-XXXX HVAC Water Testing and Treatment Services
RECURRING WORK EXHIBIT LINE ITEM NUMBERS
OY3 - EXHIBIT G
ELINSUB ELINDescriptionQuantityUnit of IssueUnit PriceTotal
PWD South Potomac Dahlgren NSF, VA
A001PWD South Potomac Dahlgren NSWC
AAHVAC Chilled Water Treatment and Testing Building 18012Month
HVAC Chilled Water Treatment and Testing Building 18312Month
HVAC Chilled Water Treatment and Testing Building 22112Month
HVAC Chilled Water Treatment and Testing Building 147012Month
HVAC Chilled Water Treatment and Testing Building 149012Month
HVAC Chilled Water Treatment and Testing Building 150012Month
HVAC Chilled Water Treatment and Testing Building 151012Month
HVAC Chilled Water Treatment and Testing Building 153012Month
HVAC Chilled Water Treatment and Testing Building 156012Month
HVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 15012Month
HVAC Boiler Water Treatment and Testing Building 18312Month
HVAC Boiler Water Treatment and Testing Building 19412Month
HVAC Boiler Water Treatment and Testing Building 20212Month
HVAC Boiler Water Treatment and Testing Building 37112Month
HVAC Boiler Water Treatment and Testing Building 45612Month
HVAC Boiler Water Treatment and Testing Building 156012Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
PWD South Potomac Dahlgren NSWC Subtotal$0.00$0.00
A002PWD South Potomac Dahlgren ATRC
AASKID Chilled Water Treatment and Testing Building 152012Month
PWD South Potomac Dahlgren ATRC Subtotal$0.00$0.00
A003PWD South Potomac Dahlgren NDW
AAHVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, BMD 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 22012Month
HVAC Boiler Water Treatment and Testing Building 96312Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Chilled Water Treatment and Testing Building 152012Month
HVAC Boiler Water Treatment and Testing Building 152012Month
HVAC Boiler Water Treatment and Testing Building 20612Month
HVAC Chilled and Boiler Water Treatment and Testing Building 161012Month
PWD South Potomac Dahlgren NDW Subtotal$0.00$0.00
PWD South Potomac Dahlgren NAVFAC
ABHVAC Boiler Water Treatment and Testing Building 48112Month
HVAC Boiler Water Treatment and Testing Building 962A12Month
HVAC Boiler Water Treatment and Testing Building 128112Month
PWD South Potomac Dahlgren NAVFAC Subtotal
PWD South Potomac Dahlgren CNIC Total$0.00$0.00
A004PWD South Potomac Dahlgren BMD
AAHVAC Chilled Water Treatment and Testing Building 1705A12Month
PWD South Potomac Dahlgren BMD Subtotal$0.00$0.00
A005PWD South Potomac Dahlgren Air Force
AAHVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
PWD South Potomac Dahlgren Air Force Subtotal$0.00$0.00

PWD South Potomac Dahlgren NSF (A001-A005) Total $0.00 $0.00

ExH

ATTACHMENT J-0200000-06
N40080-17-D-2502 HVAC Water Testing and Treatment Services
NON-RECURRING WORK EXHIBIT LINE ITEM NUMBERS
OY 3 - EXHIBIT H
ELINSupplies/ServicesEstimated QuantityUnit of IssueUnit PriceExtended Price
PWD South Potomac Dahlgren NSF,VA
H001The Contractor shall conduct replacement of chemical feed pump(s) and associated tubing/plumbing for non operational chemical feed pump systems. Contractor shall provide all labor, material, and tools/equipment for replacement, render replacement operational, and maintain replacement as existing designated inventory. Replacement shall of new condition and like composition, quality, and funtion.8Each
H002The Contractor shall conduct installation of new (non existing) chemical feed pump(s) and associated tubing/plumbing. Contractor shall provide all labor, material, and tools/equipment for new installation and render newly installed equipment operational. Contractor installation responsibility shall be from Chemical containment to point of chemical injection.8Each
H003The Contractor shall conduct replacement chemical feed pump controllers for non operational chemical feed pump conttrollers. Contractor shall provide all labor, material, and tools/equipment for new installation and render newly installed equipment operational. Replacement shall of new condition and like composition, quality, and funtion.6Each
TOTAL NON-RECURRING WORK PRICE (H001 through H003)- Not to Exceed$0.00

ExI

ATTACHMENT J-0200000-05
N40080-22-D-XXXX HVAC Water Testing and Treatment Services
RECURRING WORK EXHIBIT LINE ITEM NUMBERS
OY4 - EXHIBIT I
ELINSUB ELINDescriptionQuantityUnit of IssueUnit PriceTotal
PWD South Potomac Dahlgren NSF, VA
A001PWD South Potomac Dahlgren NSWC
AAHVAC Chilled Water Treatment and Testing Building 18012Month
HVAC Chilled Water Treatment and Testing Building 18312Month
HVAC Chilled Water Treatment and Testing Building 22112Month
HVAC Chilled Water Treatment and Testing Building 147012Month
HVAC Chilled Water Treatment and Testing Building 149012Month
HVAC Chilled Water Treatment and Testing Building 150012Month
HVAC Chilled Water Treatment and Testing Building 151012Month
HVAC Chilled Water Treatment and Testing Building 153012Month
HVAC Chilled Water Treatment and Testing Building 156012Month
HVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 15012Month
HVAC Boiler Water Treatment and Testing Building 18312Month
HVAC Boiler Water Treatment and Testing Building 19412Month
HVAC Boiler Water Treatment and Testing Building 20212Month
HVAC Boiler Water Treatment and Testing Building 37112Month
HVAC Boiler Water Treatment and Testing Building 45612Month
HVAC Boiler Water Treatment and Testing Building 156012Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
PWD South Potomac Dahlgren NSWC Subtotal$0.00$0.00
A002PWD South Potomac Dahlgren ATRC
AASKID Chilled Water Treatment and Testing Building 152012Month
PWD South Potomac Dahlgren ATRC Subtotal$0.00$0.00
A003PWD South Potomac Dahlgren NDW
AAHVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, BMD 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 22012Month
HVAC Boiler Water Treatment and Testing Building 96312Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Chilled Water Treatment and Testing Building 152012Month
HVAC Boiler Water Treatment and Testing Building 152012Month
HVAC Boiler Water Treatment and Testing Building 20612Month
HVAC Chilled and Boiler Water Treatment and Testing Building 161012Month
PWD South Potomac Dahlgren NDW Subtotal$0.00$0.00
PWD South Potomac Dahlgren NAVFAC
ABHVAC Boiler Water Treatment and Testing Building 48112Month
HVAC Boiler Water Treatment and Testing Building 962A12Month
HVAC Boiler Water Treatment and Testing Building 128112Month
PWD South Potomac Dahlgren NAVFAC Subtotal
PWD South Potomac Dahlgren CNIC Total$0.00$0.00
A004PWD South Potomac Dahlgren BMD
AAHVAC Chilled Water Treatment and Testing Building 1705A12Month
PWD South Potomac Dahlgren BMD Subtotal$0.00$0.00
A005PWD South Potomac Dahlgren Air Force
AAHVAC Chilled Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
HVAC Boiler Water Treatment and Testing Building 1700 (Cost Share- NDW 1/4, NSWC 1/4, and AF 1/2 each)12Month
PWD South Potomac Dahlgren Air Force Subtotal$0.00$0.00

PWD South Potomac Dahlgren NSF (A001-A005) Total $0.00 $0.00

ExJ

ATTACHMENT J-0200000-06
N40080-17-D-2502 HVAC Water Testing and Treatment Services
NON-RECURRING WORK EXHIBIT LINE ITEM NUMBERS
OY 4 - EXHIBIT J
ELINSupplies/ServicesEstimated QuantityUnit of IssueUnit PriceExtended Price
PWD South Potomac Dahlgren NSF,VA
J001The Contractor shall conduct replacement of chemical feed pump(s) and associated tubing/plumbing for non operational chemical feed pump systems. Contractor shall provide all labor, material, and tools/equipment for replacement, render replacement operational, and maintain replacement as existing designated inventory. Replacement shall of new condition and like composition, quality, and funtion.8Each
J002The Contractor shall conduct installation of new (non existing) chemical feed pump(s) and associated tubing/plumbing. Contractor shall provide all labor, material, and tools/equipment for new installation and render newly installed equipment operational. Contractor installation responsibility shall be from Chemical containment to point of chemical injection.8Each
J003The Contractor shall conduct replacement chemical feed pump controllers for non operational chemical feed pump conttrollers. Contractor shall provide all labor, material, and tools/equipment for new installation and render newly installed equipment operational. Replacement shall of new condition and like composition, quality, and funtion.6Each
TOTAL NON-RECURRING WORK PRICE (J001 through J003)- Not to Exceed$0.00

File details come from the government source that posted it. Updated .