009 SCH B26 DRYWALL FINISH SPECS_PLANS reduced.pdf
PDF 792 KB Posted
- Solicitation number
- 1282A723R0015
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for life safety repairs at multiple North Carolina Job Corps centers operated by the Department of Agriculture Forest Service. Base requirements include repairing and upgrading fire alarm, sprinkler, and suppression systems. Contractors must provide all labor, materials, supervision, equipment, tools and incidentals to complete the work. The period of performance is one year from NTP with two optional one-year extensions. The solicitation was issued on June 20, 2023 with proposals due by July 15, 2023. Award is anticipated by August 15, 2023. Pricing shall be fixed for the base period with economic price adjustments for option years. The NAICS code is 238210 and the size standard is $16.5M.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PACKAGE 009
SCHENCK JOB CORPS CENTER
COUNSELING BUILDING (BLDG. 26) DRYWALL FINISHING
SPECIFICATIONS AND PLANS
JUNE 2023
COUNSELING BUILDING DRYWALL FINISHING 010150 – 1
SCHENCK JOB CORPS CCC GENERAL REQUIREMENTS
SECTION 010150
GENERAL REQUIREMENTS
PART 1 – SUMMARY OF WORK
1.1 DESCRIPTION
A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:
1. Base Item No. 1 – Counseling Building (Bldg. 26) Drywall Finishing
1.2 LOCATION
A. This project is located at 98 Schenck Drive, Pisgah Forest N.C 28768. Driving instructions can be obtained from the Center by calling 828.862.6100.
1.3 WORK HOURS
A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday.
1.4 USE OF PREMISES
A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-to-day operations.
C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.
Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government.
1.5 WORK RESTRICTIONS
A. Smoking is not permitted on Center property.
B. Daily check-in/out is required for all contract employees at the Administration Building (Bldg. 50).
COUNSELING BUILDING DRYWALL FINISHING 010150 – 2
1.6 SCHEDULE OF ITEMS
A. Schedule of Items:
1. Provide pricing for all items listed in the Schedule of Items.
2. Contract award will be made for all Base Items.
3. Optional Items may or may not be awarded, depending on funding availability.
B. Base Items (BI):
1. Base Item No. 1 – Counseling Building (Bldg. 26) Drywall Finishing
a. Measurement: This item is measured as a Lump Sum quantity.
b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to finish existing walls as indicated in the plans utilizing government furnished compound, gypsum board, and paint. This will include minor repairs of existing ceiling popcorn texture and paint utilizing Contractor furnished repair materials matching the existing. Doors, trims, bathroom fixtures, and flooring installation/re-installation is not the responsibility of the Contractor.
c. Deficiencies: #NA.
C. Optional Items (OI):
a. NA.
1.7 REQUIREMENTS
A. The building, mechanical, plumbing, and electrical requirements indicated below shall be in conformance with the most recent versions of the International Building Code (IBC), International Mechanical Code (IMC), International Energy Conservation Code (IECC), International Plumbing Code (IPC), the American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) Standard 90.1 and 62.1, the National Electric Code (NEC), Architectural Barriers Act Standards (ABA, ABAS) and Energy Star qualified. The Contractor shall install products in accordance with all the manufacturer’s written directions and recommendations provided these do not conflict with the referenced codes and standards. Utilize low and/or zero VOC products when available and compatible with adjoining materials. All products shall be asbestos and lead free.
B. Finish and/or re-finish gypsum board walls within the area of work indicated in the plans utilizing government furnished compound and primer/paint. This includes:
1. Skim coating over existing wall textures and finishing new gypsum board to provide a National Gypsum Association’s Level 4 Finish per GA-214.
COUNSELING BUILDING DRYWALL FINISHING 010150 – 3
2. Minor miscellaneous ceiling texture repair/painting to match surrounding areas using contractor furnished materials at wall/ceiling intersections.
3. Protection of other building materials, devices, appliances, etc from dust, splatter, drips, etc associated with wall finishing/painting.
4. This does not include installation/re-installation of doors, trims, bathroom fixtures, cabinets, and flooring – this will be the responsibility of the government after completion of this contract’s work.
PART 2 – PROJECT SCHEDULE
3.1 PROJECT SCHEDULE
ITEM* REQUIRED DUE DATE (calendar days)
Pre-Construction Conference
Within 10 days of Award (Virtually)
Notice To Proceed (NTP)
Issued first weekday after Pre-Construction Conference
Bonds 10 days after NTP
Action and Informational Submittals
10 days after NTP (CORs have 10 calendar days to return)
Closeout Submittals prior to CO acceptance of project
Contract Release form and final pay request
10 days after CO acceptance of project
* All items above must be included in contractor’s construction schedule
COUNSELING BUILDING DRYWALL FINISHING 010150 – 4
PART 3 – SUBMITTAL PROCEDURES
4.1 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Government approval.
B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements.
4.2 PROCEDURES
A. Contractor Responsibilities
1. Review each submittal and check for compliance with the Contract Documents.
2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
3. Include the following information on label or cover sheet for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. Date of Contractor’s approval.
i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents.
4. The Government will not review submittals that do not bear Contractor's approval and will return them without action.
5. Unless additional copies are required for final submittal, and unless the
Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
6. Submittals must be submitted in electronic PDF format. Submit to CO via email or electronic file transfer site.
7. Only final submittals with mark indicating action taken by Government are to be used for construction.
8. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
B. Processing Time: Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Government will review initial submittal within 10 calendar days.
Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
COUNSELING BUILDING DRYWALL FINISHING 010150 – 5
2. Resubmittals: If resubmittal is necessary, it will be processed in same timeframe as initial submittal.
4.3 ACTION SUBMITTALS
A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.
B. Collect information into a single submittal for each element of construction and type of product or equipment.
1. Mark up each submittal to show which products and options are applicable.
2. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Required Action Submittals
1. Product Data: See Technical Specification Sections.
4.4 INFORMATIONAL SUBMITTALS
A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated below:
B. Required Informational Submittals:
1. Accident Prevention Plan.
2. Construction Schedule.
4.5 CLOSEOUT SUBMITTALS
A. Prepare and submit Closeout Submittals, as follows:
1. See Technical Specification Sections.
2. One-Year Warranty on Entire Project as required by FAR 52.246–21
3. Project Record Documents.
PART 4 – TEMPORARY FACILITIES AND CONTROLS
7.1 USE OF UTILITIES
COUNSELING BUILDING DRYWALL FINISHING 010150 – 6
A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service. The contractor is expected to provide whatever phone service he deems necessary for the duration of the project.
7.2 SANITARY FACILITIES
A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily.
7.3 STAGING AND STORAGE
A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR).
7.4 CONSTRUCTION WASTE DISPOSAL FACILITIES
A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Use of Government waste containers will not be permitted.
7.5 SAFETY AND ENVIRONMENTAL PROTECTION
A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform personnel, students, and the public of possible hazards.
C. Fire Protection.
1. Store combustible materials in containers in fire-safe locations.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.
3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.
COUNSELING BUILDING DRYWALL FINISHING 010150 – 7
PART 5 – EXECUTION REQUIREMENTS
8.1 EXAMINATION
A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
B. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
C. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
8.2 INSTALLATION
A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction.
B. Make vertical work plumb and make horizontal work level.
C. Install per manufacturer's written instructions and recommendations.
8.3 PROGRESS CLEANING
A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
8.4 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion.
8.5 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
COUNSELING BUILDING DRYWALL FINISHING 010150 – 8
PART 6 – CLOSEOUT PROCEDURES
9.1 SUBSTANTIAL COMPLETION
A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise the CO of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.
4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities.
5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.
6. Complete startup testing of systems.
7. Submit changeover information related to Government occupancy, use, operation, and maintenance.
8. Complete final cleaning requirements, including touchup painting.
9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final
Completion.
9.2 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
COUNSELING BUILDING DRYWALL FINISHING 010150 – 9
1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
9.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
9.4 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
2. Remove tools, construction equipment, machinery, and surplus material from Project site.
3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.
Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
COUNSELING BUILDING DRYWALL FINISHING 010150 – 10
D. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 010150
THIS PAGE IS INTENTIONALLY LEFT BLANK
JOB CORPS
NATIONAL OFFICE
COUNSELING
BUILDING DRYWALL
FINISHING
SCHENCK JOB CORPS
CIVILIAN CONSERVATION
CENTER
PISGAH
NATIONAL FOREST
6/2023 4
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DATENO. REVISION / ISSUE
COVER SHEET
A.GARRISON, PE
D. VALLES, PE
T1.0
1. T1.0 COVER SHEET NA
2. G1.0 SITE PLAN NA
3. A1.0 DRYWALL FINISHING PLAN B26
4. A1.1 PHOTOS B26
INDEX
SHEET SHEET
SUB
TITLE OF SHEET
PROJECT ADDRESS
98 SCHENCK DRIVE,
PISGAH FOREST, NC 28768
GOOGLE MAPS (2022), NO SCALE
PROJECT LOCATION
BUILDING
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
COUNSELING BUILDING
DRYWALL FINISHING
PISGAH
NATIONAL FOREST
SCHENCK JOB CORPS
CENTER
TRANSYLVANIA COUNTY,
NORTH CAROLINA
SOUTHERN REGION
U.S. LOCATION MAP
PROJECT
LOCATION
PROJECT
LOCATION
AutoCAD SHX Text 6/21/23 09:23 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH JCC 2022 B21 COUNSELING DRYWALL FINISH COVER.DWG; 09:23 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH JCC 2022 B21 COUNSELING DRYWALL FINISH COVER.DWG;09:23 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH JCC 2022 B21 COUNSELING DRYWALL FINISH COVER.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH JCC 2022 B21 COUNSELING DRYWALL FINISH COVER.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH JCC 2022 B21 COUNSELING DRYWALL FINISH COVER.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH JCC 2022 B21 COUNSELING DRYWALL FINISH COVER.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH JCC 2022 B21 COUNSELING DRYWALL FINISH COVER.DWG;;
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
STAMPS, LOGOS, AND SEALS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
ARCHIVE NO.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
DATE
PARKING
PARKING
Schenck Civilian Conservation Center Pisgah Forest, North Carolina
BUILDINGS
3 - BREVARD HALL
10 - CENTER MAINTENANCE
11 - LANDSCAPING STORAGE
16 - WELDING/ BLDG. MAINTENANCE
20 - IT OFFICES
26 - ORIENTATION/COUNSELING
27 - RECREATION STORAGE
28 - STORAGE
29 - PAINT BOOTH/STORAGE
30 - GYMNASIUM
36 - FORESTRY DORMITORY
38 - PISGAH HALL (FEMALE DORM)
45 - INDEPENDENT LIVING
46 - INDEPENDENT LIVING
47 - INDEPENDENT LIVING
48 - LAUNDRY/ WAREHOUSE
49 - AUTOMOTIVE MECHANICS SHOP
50 - ADMINISTRATION BUILDING
51 - EDUCATION BUILDING
53 - WELLNESS
60 - FRESH START STORAGE
62 - VOCATIONAL BUILDING
66 - VOCATIONAL OFFICES
75 - LANDSCAPING CLASSROOM
77 - EDUCATION ANNEX
78 - MAINTENANCE STORAGE
79 - VACANT
80 - FIRE MANAGEMENT
81 - MALE DORMITORY
83 - DINING HALL
84 - DUTY OFFICE
STRUCTURES
32 - GREENHOUSE
59 - STORAGE SHED
69 - PICNIC SHELTER
73 - DUG-OUT NO.1
74 - DUG-OUT NO. 2
82 - BALLFIELD RESTROOM
85 - STORAGE
86 - GATE HOUSE
87 - VOCATIONAL STORAGE
32-1 - GREENHOUSE
32-2 - PUMP HOUSE
32-3 - STORAGE
32-4 - GREENHOUSE
36-1 - STORAGE
46-1 - RESIDENTIAL STORAGE
47-1 - RESIDENTIAL STORAGE
49-1 - STORAGE
49-2 - STORAGE
80-1 - STORAGE
G1 - GAZEBO
80-1 47-1 46-1 49
49-1 49-2 16
LEGEND
Figure ES-1
Existing Site Plan 150 300 600 Feet
36-1
G-1 46 45 80
32-4
73 28
32-2
MINIATURE
GOLF
32-1
32-3
DAVID
SON R
IVER
PARKING
SC
HE
NC
K
RD
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
.\Job_Corps_Logo.jpg
DATENO. REVISION / ISSUE
SITE PLAN
A.GARRISON, PE
D. VALLES, PE
G1.0
JOB CORPS
NATIONAL OFFICE
COUNSELING BUILDING
DRYWALL FINISHING
SCHENCK
JOB CORPS
CIVILIAN CONSERVATION
CENTER
PISGAH NATIONAL FOREST
6/2023 4
HATCHING DENOTES BUILDING
INCLUDED IN THIS CONTRACT
AutoCAD SHX Text 6/21/23 09:21 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG; 09:21 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;09:21 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;;
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
STAMPS, LOGOS, AND SEALS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
ARCHIVE NO.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
.\Job_Corps_Logo.jpg
DATENO. REVISION / ISSUE
DRYWALL
FINISHING PLAN
A.GARRISON, PE
D. VALLES, PE
A1.0
JOB CORPS
NATIONAL OFFICE
COUNSELING BUILDING
DRYWALL FINISHING
SCHENCK JOB CORPS
CIVILIAN CONSERVATION
CENTER
PISGAH NATIONAL FOREST
6/2023 4
NOTES:
1. DIMENSIONS, SCALES, AND PHOTOS ARE FOR GENERAL PROJECT SCOPING ONLY. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ACCURATELY MEASURING AND REVIEWING SPACES TO ASCERTAIN THE FULL EXTENT OF THE WORK REQUIRED AND FOR MATERIAL PROCUREMENT AND INSTALLATION PURPOSES.
PH1
A1.0
MAIN ROOM
NO SCALE
A A1.0
BLDG 26, COUNSELING BLDG WALL FINISH PLAN
3/16"=1' 4 0 4 128
SCALE OF FEET
PH6
A1.1
ROOM #1
606 SF
ROOM #3
684 SF
ROOM #5
516 SF
HALLWAY AND
MAIN ROOM,
2400 SF.ROOM #2
606 SF
ROOM #4
576 SF
ROOM #6
576 SF
IT
R
O O
M
SF
M
EC
H
SF
MECH #1
200 SF
KEY NOTES
HATCHED AREA DENOTES AREA OF WORK. SQUARE FOOTAGE OF WALLS REQUIRING REFINISHING ARE PROVIDED FOR GENERAL PROJECT SCOPING, CONTRACTOR SHALL VERIFY EXISTING CONDITIONS. THE WALLS WITHIN THIS AREA SHALL BE FINISHED AND PAINTED BY THE CONTRACTOR UTILIZING GOVERNMENT FURNISHED COMPOUND AND PRIMER/PAINT .
WALLS CONSIST OF A MIX OF PREVIOUSLY FINISHED GYPSUM BOARD WITH A KNOCKDOWN TEXTURE AND NEW UNFINISHED GYPSUM BOARD. MOST GYPSUM WALL BOARD HAS ALREADY BEEN INSTALLED, THE CONTRACTOR SHALL INSTALL GOVERNMENT FURNISHED GYPSUM BOARD IN AREAS IT IS NOT INSTALLED PRIOR TO FINISHING - SEE MECHANICAL ROOM PHOTOS. THE WALLS SHALL BE TAPED , SKIM COATED, FILLED, AND SANDED AS NEEDED FOR A LEVEL 4 FINISH (SMOOTH/FLAT, NO TEXTURE) PRIOR TO PAINTING. SOME INCIDENTAL CEILING REPAIR TO PATCH POPCORN TEXTURE, MATCH EXISTING CEILING PAINT FOR AREAS WHERE TEXTURE IS PATCHED/REPAIRED. THE CONTRACTOR SHALL PROVIDE DUST CONTROL MEASURES AND PROTECTIVE SHEETS AND MASKING TO PROTECT WINDOWS, FLOORS, ELECTRICAL DEVICES, AND SIMILAR EXISTING BUILDING MATERIALS FROM PAINT/COMPOUND, UPON COMPLETION OF WORK
PROTECTIVE SHEETS SHALL BE REMOVED.
A. DOORS, TRIM, BATHROOM FIXTURES, CABINETS, AND FLOORING INSTALLATION OR RE-INSTALLATION ARE NOT
INCLUDED IN THIS CONTRACT.
PH1
A1.0
PH2
A1.0
MAIN ROOM
NO SCALE
PH2
A1.0
PH3
A1.0
MAIN ROOM/HALLWAY
NO SCALE
PH3
A1.0
BA
TH
BATH #2
PH4
A1.0
MAIN ROOM
NO SCALE
PH4
A1.0
PH5
A1.0
MECH ROOM #1
NO SCALE
PH6
A1.0
MECH ROOM #2
NO SCALE
PH7
A1.0
MAIN ROOM
NO SCALE
PH6
A1.0
PH7
A1.0
PH5
A1.0
PH1
A1.1
PH2
A1.1
PH4
A1.1
PH5
A1.1
PH3
A1.1
PH10
A1.1
PH7
A1.1
PH11
A1.1
PH9
A1.1
PH8
A1.1
AutoCAD SHX Text 6/21/23 09:21 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG; 09:21 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;09:21 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;;
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
STAMPS, LOGOS, AND SEALS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
ARCHIVE NO.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
.\Job_Corps_Logo.jpg
DATENO. REVISION / ISSUE
PHOTOS
A.GARRISON, PE
D. VALLES, PE
A1.1
JOB CORPS
NATIONAL OFFICE
COUNSELING BUILDING
DRYWALL FINISHING
SCHENCK JOB CORPS
CIVILIAN CONSERVATION
CENTER
PISGAH NATIONAL FOREST
6/2023 4
NOTES:
1. DIMENSIONS, SCALES, AND PHOTOS ARE FOR GENERAL PROJECT SCOPING
ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACCURATELY
MEASURING AND REVIEWING SPACES TO ASCERTAIN THE FULL EXTENT OF
THE WORK REQUIRED AND FOR MATERIAL PROCUREMENT AND
INSTALLATION PURPOSES.
PH2
A1.1
HALLWAY
NO SCALE
PH3
A1.1
HALLWAY
NO SCALE
PH5
A1.1
ROOM #1
NO SCALE
PH7
A1.1
ROOM #3
NO SCALE
PH1
A1.1
MAIN ROOM/HALLWAY
NO SCALE
PH4
A1.1
HALLWAY
NO SCALE
PH10
A1.1
ROOM #6
NO SCALE
PH11
A1.1
IT ROOM
NO SCALE
PH9
A1.1
ROOM #5
NO SCALE
PH6
A1.1
ROOM #2
NO SCALE
PH8
A1.1
ROOM #4
NO SCALE
AutoCAD SHX Text 6/21/23 09:21 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG; 09:21 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;09:21 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\B26_COUNSELING\2023-DRYWALL\DWGS\SCH B21 COUNSELING DRYWALL FINISH DWGS.DWG;;
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
STAMPS, LOGOS, AND SEALS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
ARCHIVE NO.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
| PACKAGE 009 COVERSHEET |
| Div1 Spec w WarrantySubm REV 15Feb2023 |
| 1. |
| 1.1 Description |
| A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows: |
| 1. Base Item No. 1 – Counseling Building (Bldg. 26) Drywall Finishing |
| 1.2 location |
| A. This project is located at 98 Schenck Drive, Pisgah Forest N.C 28768. Driving instructions can be obtained from the Center by calling 828.862.6100. |
| 1.3 work hours |
| A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday. |
| 1.4 USE OF PREMISES |
| A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated. |
| B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's... |
| C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Do not close or ob... |
| 1.5 WORK RESTRICTIONS |
| A. Smoking is not permitted on Center property. |
| B. Daily check-in/out is required for all contract employees at the Administration Building (Bldg. 50). |
| 1.6 schedule of items |
| A. Schedule of Items: |
| 1. Provide pricing for all items listed in the Schedule of Items. |
| 2. Contract award will be made for all Base Items. |
| B. Base Items (BI): |
| 1. Base Item No. 1 – Counseling Building (Bldg. 26) Drywall Finishing |
| a. Measurement: This item is measured as a Lump Sum quantity. |
| b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to finish existing walls as indicated in the plans utilizing government furnished compound, gypsum board, and paint. T... |
| c. Deficiencies: #NA. |
| C. Optional Items (OI): |
| a. NA. |
1.7 requirements
| 2. |
| A. The building, mechanical, plumbing, and electrical requirements indicated below shall be in conformance with the most recent versions of the International Building Code (IBC), International Mechanical Code (IMC), International Energy Conservat... |
| B. Finish and/or re-finish gypsum board walls within the area of work indicated in the plans utilizing government furnished compound and primer/paint. This includes: |
| 1. Skim coating over existing wall textures and finishing new gypsum board to provide a National Gypsum Association’s Level 4 Finish per GA-214. |
| 2. Minor miscellaneous ceiling texture repair/painting to match surrounding areas using contractor furnished materials at wall/ceiling intersections. |
| 3. Protection of other building materials, devices, appliances, etc from dust, splatter, drips, etc associated with wall finishing/painting. |
| 4. This does not include installation/re-installation of doors, trims, bathroom fixtures, cabinets, and flooring – this will be the responsibility of the government after completion of this contract’s work. |
| 3. |
| 3.1 project schedule |
| * All items above must be included in contractor’s construction schedule |
| REQUIRED DUE DATE (calendar days) |
| ITEM* |
| Within 10 days of Award (Virtually) |
| Pre-Construction Conference |
| Issued first weekday after Pre-Construction Conference |
| Notice To Proceed (NTP) |
| 10 days after NTP |
| Bonds |
| 10 days after NTP (CORs have 10 calendar days to return) |
| Action and Informational Submittals |
| prior to CO acceptance of project |
| Closeout Submittals |
| 10 days after CO acceptance of project |
| Contract Release form and final pay request |
| 4. |
| 4.1 DEFINITIONS |
| A. Action Submittals: Written and graphic information that requires Government approval. |
| B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements. |
| 4.2 PROCEDURES |
| A. Contractor Responsibilities |
| 1. Review each submittal and check for compliance with the Contract Documents. |
| 2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals. |
| 3. Include the following information on label or cover sheet for processing and recording action taken: |
| a. Project name. |
| b. Date. |
| c. Name and address of Contractor. |
| d. Name of manufacturer. |
| e. Unique identifier, including revision number. |
| f. Number and title of appropriate Specification Section. |
| g. Drawing number and detail references, as appropriate. |
| h. Date of Contractor’s approval. |
| i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents. |
| 4. The Government will not review submittals that do not bear Contractor's approval and will return them without action. |
| 5. Unless additional copies are required for final submittal, and unless the Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal. |
| 6. Submittals must be submitted in electronic PDF format. Submit to CO via email or electronic file transfer site. |
| 7. Only final submittals with mark indicating action taken by Government are to be used for construction. |
| 8. Submittals not required by the Contract Documents will not be reviewed and may be discarded. |
| B. Processing Time: Time for review shall commence on CO's receipt of submittal. |
| 1. Initial Review: Government will review initial submittal within 10 calendar days. Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being pro... |
| 2. Resubmittals: If resubmittal is necessary, it will be processed in same timeframe as initial submittal. |
| 4.3 ACTION SUBMITTALS |
| A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection. |
| B. Collect information into a single submittal for each element of construction and type of product or equipment. |
| 1. Mark up each submittal to show which products and options are applicable. |
| 2. Include the following information, as applicable: |
| a. Manufacturer's written recommendations. |
| b. Manufacturer's product specifications. |
| c. Manufacturer's installation instructions. |
| d. Manufacturer's catalog cuts. |
| e. Wiring diagrams showing factory-installed wiring. |
| f. Compliance with recognized trade association standards. |
| g. Compliance with recognized testing agency standards. |
| C. Required Action Submittals |
| 1. Product Data: See Technical Specification Sections. |
| 4.4 INFORMATIONAL SUBMITTALS |
| A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated below: |
| B. Required Informational Submittals: |
| 1. Accident Prevention Plan. |
| 2. Construction Schedule. |
| 4.5 CLOSEOUT SUBMITTALS |
| A. Prepare and submit Closeout Submittals, as follows: |
| 1. See Technical Specification Sections. |
| 2. One-Year Warranty on Entire Project as required by FAR 52.246–21 |
| 3. Project Record Documents. |
| 5. |
| 6. |
| 7. |
| 7.1 use of UTILITies |
| A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilitie... |
| 7.2 sanitary facilities |
| A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily. |
| 7.3 Staging and storage |
| A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR). |
| 7.4 construction WASTE DISPOSAL faciLITIES |
| A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Use of Government waste containers ... |
| 7.5 safety and environmental PROTECTION |
| A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamina... |
| B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform p... |
| C. Fire Protection. |
| 1. Store combustible materials in containers in fire-safe locations. |
| 2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas. |
| 3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition. |
| 8. |
| 8.1 EXAMINATION |
| A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions. |
| B. Field verify all new and existing dimensions affecting the work of this contract before ordering products. |
| C. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents. |
| 8.2 INSTALLATION |
| A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction. |
| B. Make vertical work plumb and make horizontal work level. |
| C. Install per manufacturer's written instructions and recommendations. |
| 8.3 PROGRESS CLEANING |
| A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully. |
| 1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris. |
| 2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C). |
B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
| 8.4 PROTECTION OF INSTALLED CONSTRUCTION |
| A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion. |
| 8.5 CORRECTION OF THE WORK |
| A. Repair or remove and replace defective construction. Restore damaged substrates and finishes. |
| 1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. |
| 9. |
| 9.1 SUBSTANTIAL COMPLETION |
| A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use fo... |
| B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request. |
| 1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete. |
| 2. Advise the CO of pending insurance changeover requirements. |
| 3. Submit specific warranties, workmanship bonds, final certifications, and similar documents. |
| 4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. |
| 5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable. |
| 6. Complete startup testing of systems. |
| 7. Submit changeover information related to Government occupancy, use, operation, and maintenance. |
| 8. Complete final cleaning requirements, including touchup painting. |
| 9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects. |
| C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Comple... |
| 1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected. |
| 2. Results of completed inspection will form the basis of requirements for Final Completion. |
| 9.2 FINAL COMPLETION |
| A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following: |
| 1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved f... |
| 2. Submit evidence of final, continuing insurance coverage complying with insurance requirements. |
| 3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems. |
| B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspe... |
| 1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected. |
| 9.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST) |
| A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are o... |
| 9.4 fiNAL CLEANING |
| A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. |
| B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces. |
| C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project: |
| 1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances. |
| 2. Remove tools, construction equipment, machinery, and surplus material from Project site. |
| 3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration. |
D. Remove waste materials from Project site and dispose of lawfully.
| SCH B21 CounselingDrywall Dwg |
| SCH JCC 2022 B21 Counseling Drywall Finish Cover-Layout1 |
| Sheets and Views |
| SCH JCC 2022 B21 Counseling Drywall Finish Cover-Layout1 |
| SCH B21 Counseling Drywall Finish dwgs-A1.0 B26 |
| Sheets and Views |
| SCH B21 Counseling Drywall Finish dwgs-A1.0 B26 |
| SCH B21 Counseling Drywall Finish dwgs-A1.1 B26 |
| Sheets and Views |
| SCH B21 Counseling Drywall Finish dwgs-A1.1 B26 |