This solicitation is for life safety repairs at multiple buildings at the North Carolina Lyndon B. Johnson Job Corps Center. The required work includes installing fire dampers, tracing and labeling electrical circuits, and replacing door hardware. Bids are due within 14 calendar days of the pre-construction conference, with award made for all base items. Optional items may or may not be awarded depending on funding. The work must be completed between 8 am and 4:30 pm Monday through Friday. The Department of Agriculture Forest Service is the contracting agency.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PACKAGE 004
LYNDON B. JOHNSON JOB CORPS CENTER
MULTIPLE BUILDING LIFE SAFETY
SPECIFICATIONS AND PLANS
MAY 2023
MULTIPLE BUILDING LIFE SAFETY 010150 – 1
LYNDON B. JOHNSON JOB CORPS CCC GENERAL REQUIREMENTS
LYNDON B. JOHNSON JOB CORPS CENTER
MULTIPLE BUILDING LIFE SAFETY
SECTION 010150
GENERAL REQUIREMENTS
PART 1 – SUMMARY OF WORK
1.1 DESCRIPTION
A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:
1. Base Item No. 1 – Male Dorm (Bldg 81) Laundry Rooms Transfer Grilles.
2. Base Item No. 2 – Jackson 4 (Bldg 16) West Panelboard Directory.
3. Base Item No. 3 – Administration (Bldg 46) Panelboard Directories.
4. Base Item No. 4 – Wellness (Bldg 47) Panelboard Directories.
5. Base Item No. 5 – Welding (Bldg 58) Panelboard Directories.
6. Base Item No. 6 – Kennedy 1, 2, &3 (Bldg 10, 12, 14) Door Hardware.
7. Base Item No. 7 – Jackson 4, (Bldg 16) Door Hardware.
8. Optional Item No. 8 – Administration, (Bldg 46) Service Equipment
Identification.
9. Optional Item No. 9 – Cement Masonry, (Bldg 55) Unit Heater Disconnects.
10. Optional Item No. 10 – Welding, (Bldg 58) Electric Service and Switchboard
Identifications.
1.2 LOCATION
A. This project is located at the Lyndon B. Johnson Job Corps Center campus located approximately 8.6 miles from Franklin, NC in Macon County. The address is 3170 Wayah Rd, Franklin, NC 28734. Driving instructions can be obtained from the Center by calling (828) 524-4446.
1.3 WORK HOURS
A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday.
1.4 USE OF PREMISES
A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-to-day operations.
MULTIPLE BUILDING LIFE SAFETY 010150 – 2
C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.
Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government.
1.5 WORK RESTRICTIONS
A. Smoking is permitted on campus only in the designated smoking area.
1.6 SCHEDULE OF ITEMS
A. Schedule of Items:
1. Provide pricing for all items listed in the Schedule of Items.
2. Contract award will be made for all Base Items.
3. Optional Items may or may not be awarded, depending on funding availability.
B. Base Items (BI):
1. Base Item No. 1 – Male Dorm (Bldg 81) Laundry Rooms Transfer Grilles.
a. Unit: Lump Sum.
b. JCC Deficiency #’s: 125244.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
1. Install fire dampers with wall sleeves and grilles through interior wall of 1st and 2nd floor laundry rooms (2 per laundry room).
2. Base Item No. 2 – Jackson 4 (Bldg 16) West Panelboard Directory.
b. JCC Deficiency #’s: 123878.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
1. Trace circuits and create new circuit directory for West panelboard in
South dormitory room area.
3. Base Item No. 3 – Administration (Bldg 46) Panelboard Directories.
b. JCC Deficiency #’s: 123909.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
1. Trace circuits and create new circuit directories for panelboard located in the central mechanical room.
MULTIPLE BUILDING LIFE SAFETY 010150 – 3
4. Base Item No. 4 – Wellness (Bldg 47) Panelboard Directories.
b. JCC Deficiency #’s: 123916.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
located in the lab/electrical room.
5. Base Item No. 5 – Welding (Bldg 58) Panelboard Directories.
b. JCC Deficiency #’s: 123940.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
located in the lab/electrical room.
6. Base Item No. 6 – Kennedy 1, 2, &3 (Bldg 10, 12, 14) Door Hardware.
b. JCC Deficiency #’s: 87238, 87515.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
1. Install latching ADA compliant door cylinder sets on multiple doors.
2. Adjust and modify existing hardware (deadbolts, cover plates, etc) as required for new hardware installation.
7. Base Item No. 7 – Jackson 4, (Bldg 16) Door Hardware.
b. JCC Deficiency #’s: 87243.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
1. Install latching ADA compliant door cylinder sets on multiple doors.
2. Adjust and modify existing hardware (deadbolts, cover plates, etc) as required for new hardware installation.
C. Optional Items (OI):
1. Optional Item No. 8 – Administration, (Bldg 46) Service Equipment.
Identification.
MULTIPLE BUILDING LIFE SAFETY 010150 – 4
b. JCC Deficiency #’s: 123910.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
1. Label 400A disconnect with code required markings to identify building served and power source.
2. Repair disconnect ground.
2. Optional Item No. 9 – Cement Masonry, (Bldg 55) Unit Heater Disconnects.
b. JCC Deficiency #’s: 125284.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
1. Install equipment disconnects for 2 ceiling mount electric unit heaters.
3. Optional Item No. 10 – Welding, (Bldg 58) Electric Service and Switchboard Identifications.
a. Unit: Lump Sum.
b. JCC Deficiency #’s: 123936.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
1. Label disconnect at transform, building disconnect, and switchboards in accordance with NFPA 70 requirements.
2. Trace circuits and provide directories for switchboards.
PART 2 – PROJECT SCHEDULE
2.1 PROJECT SCHEDULE
ITEM* REQUIRED DUE DATE (calendar days)
Pre-Construction Conference
Within 14 calendar days of Award (Virtually)
Notice To Proceed (NTP)
Issued first weekday after Pre-Construction Conference
Bonds 10 days after NTP
MULTIPLE BUILDING LIFE SAFETY 010150 – 5
Action and Informational Submittals
10 days after NTP (CORs have 10 calendar days to return)
Closeout Submittals prior to CO acceptance of project
Contract Release form and final pay request
10 days after CO acceptance of project
* All items above must be included in contractor’s construction schedule
PART 3 – SUBMITTAL PROCEDURES
3.1 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Government approval.
B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements.
3.2 PROCEDURES
A. Contractor Responsibilities
1. Review each submittal and check for compliance with the Contract Documents.
2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
3. Include the following information on label or cover sheet for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. Date of Contractor’s approval.
i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents.
4. The Government will not review submittals that do not bear Contractor's approval and will return them without action.
MULTIPLE BUILDING LIFE SAFETY 010150 – 6
5. Unless additional copies are required for final submittal, and unless the Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
6. Submittals must be submitted in electronic PDF format. Submit to CO via email or electronic file transfer site.
7. Only final submittals with mark indicating action taken by Government are to be used for construction.
8. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
B. Processing Time: Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Government will review initial submittal within 10 calendar days.
Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. Resubmittals: If resubmittal is necessary, it will be processed in same timeframe as initial submittal.
3.3 ACTION SUBMITTALS
A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.
B. Collect information into a single submittal for each element of construction and type of product or equipment.
1. Mark up each submittal to show which products and options are applicable.
2. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Required Action Submittals
1. Product Data: See Technical Specification Sections.
3.4 INFORMATIONAL SUBMITTALS
A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated below:
B. Required Informational Submittals:
1. Accident Prevention Plan.
MULTIPLE BUILDING LIFE SAFETY 010150 – 7
2. Construction Schedule.
3.5 CLOSEOUT SUBMITTALS
A. Prepare and submit Closeout Submittals, as follows:
1. See Technical Specification Sections.
2. One-Year Warranty on Entire Project as required by FAR 52.246–21
3. Project Record Documents.
PART 4 – TEMPORARY FACILITIES AND CONTROLS
6.1 USE OF UTILITIES
A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service. The contractor is expected to provide whatever phone service he deems necessary for the duration of the project.
6.2 SANITARY FACILITIES
A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily.
6.3 STAGING AND STORAGE
A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR).
6.4 CONSTRUCTION WASTE DISPOSAL FACILITIES
A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Use of Government waste containers will not be permitted.
6.5 SAFETY AND ENVIRONMENTAL PROTECTION
A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
MULTIPLE BUILDING LIFE SAFETY 010150 – 8
B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform personnel, students, and the public of possible hazards.
C. Fire Protection.
1. Store combustible materials in containers in fire-safe locations.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.
3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.
PART 5 – EXECUTION REQUIREMENTS
7.1 EXAMINATION
A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
B. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
C. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
7.2 INSTALLATION
A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction.
B. Make vertical work plumb and make horizontal work level.
C. Install per manufacturer's written instructions and recommendations.
D. Finish areas disturbed by new construction to match existing finishes.
7.3 PROGRESS CLEANING
A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris.
MULTIPLE BUILDING LIFE SAFETY 010150 – 9
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
7.4 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion.
7.5 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
PART 6 – CLOSEOUT PROCEDURES
8.1 SUBSTANTIAL COMPLETION
A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise the CO of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.
4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities.
5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.
6. Complete startup testing of systems.
7. Submit changeover information related to Government occupancy, use, operation, and maintenance.
8. Complete final cleaning requirements, including touchup painting.
MULTIPLE BUILDING LIFE SAFETY 010150 – 10
9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final
Completion.
8.2 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
8.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
8.4 PROJECT RECORD DOCUMENTS
MULTIPLE BUILDING LIFE SAFETY 010150 – 11
A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.
B. Provide Draft of Project Record Drawings at Substantial Completion. CO will return reviewed copy. Provide Final Project Record Drawings at Final Completion.
C. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.
1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.
a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.
b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.
2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.
3. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.
4. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets;
bind each set with durable paper cover sheets. Include identification on cover sheets.
8.5 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
2. Remove tools, construction equipment, machinery, and surplus material from Project site.
MULTIPLE BUILDING LIFE SAFETY 010150 – 12
3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.
Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
D. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 010150
THIS PAGE IS INTENTIONALLY LEFT BLANK
MULTIPLE BUILDING LIFE SAFETY 260100 - 1
LYNDON B. JOHNSON JOB CORPS CCC COMMON WORK RESULTS
FOR ELECTRICAL
SECTION 260100
COMMON WORK RESULTS FOR ELECTRICAL
PART 1 - GENERAL
1.1 SUMMARY
A. This section includes requirements for electrical materials and methods.
1.2 WORK INCLUDED
A. As specified and as shown, furnish, install, test, and place in satisfactory and successful operation all equipment, materials, devices, and necessary appurtenances to provide a complete and operable electrical system. The work also includes the completion of those details of electrical work not mentioned or shown which are necessary for the successful operation of all electrical systems.
1.3 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specifications, apply to Division 26 Sections.
1.4 QUALITY ASSURANCE
A. Worker's Qualifications: All electrical work shall be performed by North Carolina State licensed electricians or under the direct supervision of a North Carolina State licensed electrician.
B. Codes and Regulations:
1. All work shall meet requirements of governing codes and regulations, NFPA 70- 2020 (NEC), and NESC.
2. Advise the Contracting Officer of conflicting codes or conflicts between codes and drawings and specifications.
3. When the requirements of specifications or drawings are more stringent than the codes, regulations, or standards, the specifications or drawings shall prevail.
4. The electrical installation shall meet the requirements of NECA Standard of Installation, except where otherwise specified.
C. UL Listing:
1. All electrical materials and equipment shall meet requirements of the applicable standards of UL if UL standards exist for such materials and equipment.
2. The UL authorized listing mark is acceptable as evidence that the materials meet this requirement.
MULTIPLE BUILDING LIFE SAFETY 260100 - 2
FOR ELECTRICAL
3. In lieu of UL authorized listing mark, the Contractor may submit independent proof satisfactory to the Contracting Officer that the materials meet the standards.
4. Materials and equipment shall be installed only for their intended operational purpose.
D. Standard Products: Provide only new electrical equipment of current standard design.
1.5 INTENT OF CONSTRUCTION DRAWINGS
A. Electrical drawings do not attempt to show complete details of building construction that affect installation. Diagrams are schematic only and do not necessarily show physical arrangement of equipment. Refer to drawings of other trades for additional details that affect work.
B. Conduit, conductor and ground connections are shown diagrammatically only. Layout does not necessarily show total number of conduits or conductors for circuits required and should not be used for obtaining quantities for linear runs of conduits or wires.
Locations of indicated runs are not intended to show actual routing of conduits.
Provide additional conduits and wire wherever needed to complete installation of specific equipment furnished.
C. Locations of outlets, switches, and junction boxes on drawings are approximate and may be distorted for clarity in representation.
D. Install electrical outlets and other equipment clear of and in proper relation to radiators, ducts, grilles, pipes, and other equipment, and items such as cabinets and counters.
E. Changes such as offsetting conduit runs, moving outlets, or other minor changes necessary to facilitate installation shall be made at no additional expense to the Government.
1.6 COORDINATION
A. Coordinate chases, slots, inserts, sleeves, and openings for electrical supports, raceways, and cable with general construction work.
B. Coordinate electrical work with the work of the various trades on the project.
1.7 SUBMITTALS
A. Closeout Submittals: As specified in “Closeout Procedures” paragraph in Division 1 Section “General Requirements”
1. Field quality test reports.
MULTIPLE BUILDING LIFE SAFETY 260100 - 3
FOR ELECTRICAL
PART 2 – PRODUCTS
2.1 GROUNDING
A. Grounding Electrode Conductors: Stranded copper cable, without splice throughout its length; bare or green insulated wire is acceptable.
B. Equipment Grounding Conductors: Copper, insulated with green-colored insulation.
Use same type as other wires in the circuit.
C. Bonding Jumpers: Bare copper tape or tinned-copper tape, braided copper conductors, terminated with copper ferrules.
D. Connectors: Comply with IEEE 837 and UL 467; listed for use for specific types, siz-es, and combinations of conductors and connected items.
PART 3 – EXECUTION
3.1 ELECTRICAL REMOVAL AND EXTENSION OF EXISTING ELECTRICAL
WORK
A. Disconnect, demolish, and remove electrical systems, equipment, and components in-dicated to be removed.
1. Circuits to Be Removed: Remove portion of circuits, including conductors and conduit, indicated to be removed to source of supply. Disconnect abandoned outlets and remove devices. Remove abandoned outlets if conduit servicing them is abandoned and removed. Provide blank cover for abandoned outlets which are not removed.
2. Equipment to Be Removed: Disconnect equipment. Remove circuit to source of supply where circuit is indicated to be removed. Temporarily terminate con-ductors in a safe manner where circuit will be reattached to new equipment or devices. Remove equipment.
3. Equipment to Be Removed and Reinstalled: Disconnect and remove circuit to source of supply. Remove, clean, and store equipment; when appropriate, rein-stall, reconnect, and make equipment operational.
4. Equipment to Be Removed and Salvaged: Disconnect and remove circuit to source of supply. Remove equipment and deliver to Government.
B. Verify that abandoned wiring and equipment serve only abandoned facilities. Main-tain electrical continuity to remaining wiring and equipment.
C. If during construction electrical conductors, conduits, or equipment to remain is dam-aged in appearance or is unserviceable, remove damaged or unserviceable portions and replace with new products of equal capacity and quality.
MULTIPLE BUILDING LIFE SAFETY 260100 - 4
FOR ELECTRICAL
D. Disconnect electrical systems in ceilings scheduled for removal.
E. Existing Electrical Service: Maintain existing systems in service until new systems are accepted. Disable systems only to make switchovers and connections. Notify the Contracting Officer at least 36 hours before partially or completely disabling system.
Minimize outage duration. Make temporary connections to maintain service in areas adjacent to work area.
F. Where the reuse of existing conduits, outlets, junction boxes, etc. is permissible, make certain that the wiring for them is continuous from outlet to outlet.
G. Provide temporary wiring and connections to maintain existing systems in service dur-ing construction.
H. Remove exposed abandoned conduit, including abandoned conduit above accessible ceiling finishes. Cut conduit flush with walls and floors, and patch surfaces.
I. Repair adjacent construction and finishes damaged during demolition and extension work. Provide modifications to assure that circuits or systems wiring shall not pass through outlet or junction boxes that may be rendered inaccessible by changes made to the building.
J. Connect new work to existing work in a manner that will assure proper raceway grounding throughout in conformance with the National Electrical Code.
K. Removed conduits, wire, devices, fixtures, etc. is the property of the Contractor unless otherwise noted.
L. Panelboards: Replace circuit breakers damaged during construction and provide clo-sure plates for vacant positions. Provide typed circuit directory showing revised cir-cuiting arrangement.
3.2 CUTTING AND PATCHING
A. Cut, channel, chase, and drill floors, walls, partitions, ceilings, and other surfaces required to permit electrical installations. Perform cutting by skilled mechanics of trades involved.
B. Repair, refinish and touch up disturbed finish materials and other surfaces to match adjacent undisturbed surfaces.
3.3 ELECTRICAL EQUIPMENT INSTALLATION
A. Headroom Maintenance: If mounting heights or other location criteria are not indicated, arrange and install components and equipment to provide maximum possible headroom.
MULTIPLE BUILDING LIFE SAFETY 260100 - 5
FOR ELECTRICAL
B. Materials and Components: Install level, plumb, and parallel and perpendicular to other building systems and components, unless otherwise indicated.
C. Equipment: Install to facilitate service, maintenance, and repair or replacement of components. Connect for ease of disconnecting, with minimum interference with other installations.
D. Right of Way: Give to raceways and piping systems installed at a required slope.
3.4 GROUNDING
A. Size and install grounding electrode conductors in accordance with NEC.
B. Provide a corrosion-resistant finish to field connections, bonding products, and where factory applied protective coatings have been destroyed, where subject to corrosive ac-tion.
C. Route grounding connections, conductors to ground, and grounding conductors to protective devices in the shortest and straightest paths possible to minimize transient voltage rises.
D. Install equipment-grounding conductor in feeder and branch circuits. Route to switches, receptacles, equipment enclosures, equipment, and panels. Ground as required by NEC. Terminate each ground conductor to the bushing and ground lug.
E. Install an equipment-grounding conductor in non-metallic and flexible metallic conduits.
F. Bonding Straps and Jumpers: Install so vibration by equipment mounted on vibration isolation hangers or supports is not transmitted to rigidly mounted equipment. Use exothermic-welded connectors for outdoor locations, unless a disconnect-type connection is required; then use a bolted clamp. Bond straps directly to the basic structure taking care not to penetrate any adjacent parts. Install straps only in locations accessible for maintenance.
G. Connections: Make connections so galvanic action or electrolysis possibility is minimized. Select connectors, connection hardware, conductors, and connection methods so metals in direct contact are galvanically compatible.
1. Equipment Grounding Conductor Terminations:
a. No. 8 AWG and larger: Use pressure-type, such as setscrew or hydraulic compression, grounding lugs.
b. No. 10 AWG and smaller: Terminate with winged pressure-type connectors.
MULTIPLE BUILDING LIFE SAFETY 260100 - 6
FOR ELECTRICAL
2. Non-contact Metal Raceway Terminations: If metallic raceways terminate at metal housings without mechanical and electrical connection to housing, terminate each conduit with a grounding bushing. Connect grounding bushings with a bare grounding conductor to grounding bus or terminal in housing. Bond electrically non-continuous conduits at entrances and exists with grounding bushings and bare grounding conductors, unless otherwise indicated.
3. Tighten screws and bolts for grounding and bonding connectors and terminals according to manufacturer’s published torque-tightening values. Use values specified in UL 486A if manufacturer’s torque values are not indicated.
4. Moisture Protection: If insulated grounding conductors are connected to ground rods or grounding buses, insulate entire area of connection and seal against moisture penetration of insulation and cable.
3.5 ELECTRICAL SUPPORTING DEVICE APPLICATION
A. Damp Locations and Outdoors: Use hot-dip galvanized materials or nonmetallic, slotted channel system components.
B. Dry Locations: Use steel materials.
C. Strength of Supports: Adequate to carry present and future loads, times a safety factor of at least four with, 200-lb minimum design load for each support element.
D. Clean cuts and welds. Coat unpainted surfaces with cold application zinc galvanizing.
Coat cuts and welds on painted surfaces with zinc chromate primer and finish to match existing paint.
3.6 SUPPORT INSTALLATION
A. Arrange supports to prevent misalignment during wiring installation.
B. Support parallel runs of horizontal raceways together on trapeze- or bracket-type hangers.
C. Group related conduits and support using conduit rack. Construct rack using steel channel. Size so capacity can be increased by a 25 percent in the future.
D. Support individual horizontal single raceways with separate, malleable-iron pipe hangers or clamps except use spring-steel fasteners for 1-1/2-inch and smaller single raceways above suspended ceilings and for fastening raceways to slotted channel and angle supports.
E. Install sleeves for cable and raceway penetrations of concrete slabs and walls unless core-drilled holes are used. Install sleeves for cable and raceway penetrations of masonry and fire-rated gypsum walls and of all other fire-rated floor and wall assemblies. Install sleeves during erection of concrete and masonry walls.
MULTIPLE BUILDING LIFE SAFETY 260100 - 7
FOR ELECTRICAL
F. Do not support conduit with wire or perforated pipe straps. Do not attach conduit or supports to ceiling support wires.
G. Secure electrical items and their supports to building structure, using the following methods unless other fastening methods are indicated:
1. Wood: Wood screws or screw-type nails.
2. Gypsum Board: Toggle bolts. Seal around sleeves with joint compound, both sides of wall.
3. Fasteners for Damp, Wet, or Weather-Exposed Locations: Stainless steel.
4. Fasteners: Select so load applied to each fastener does not exceed 25 percent of its proof-test load.
3.7 INSPECTION
A. Demonstrate that electrical work operates satisfactorily and in accordance with the requirements of the drawings and specifications. Before final inspection, remove the front covers on all panelboards and wire gutters. Replace covers after the final inspection is completed.
3.8 TESTING
A. Notify Contracting Officer at least 48 hours before inspection and testing. Perform tests and inspections in the presence of the Contracting Officer. Prepare report for each test signed by Installer, General Contractor, and Contracting Officer.
B. General: See individual specification sections for test requirements.
1. Furnish instruments and provide qualified personnel to perform tests in accordance with the drawings and specifications.
2. Operate electrical equipment within the ranges specified by manufacturer.
3. Correct defects revealed by the tests.
END OF SECTION 260100
LYNDON B. JOHNSON JOB CORPS CCC
260553 - 1
IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Labels.
2. Tapes and stencils.
3. Signs.
4. Labels.
5. Miscellaneous identification products.
B. Items requiring identification:
1. Panelboards, including fire alarm panels.
a. Panelboard identification label/sign (e.g. A, B, 1, 2).
b. Location/identification of device where the power supply originates from.
c. Working Clearance warning.
Figure 1: Example Working Clearance Warning Label.
d. Circuit directory clearly indicating room/area served and branch circuit type (e.g.
NW Office, receptacles, lights, furnace).
1) Trace circuits as required to identify area/devices served by unmarked existing circuits.
e. Voltage and phase label/sign.
2. Fire alarm and fire protection boxes, panels, overcurrent protective devices. Paint/mark red.
1.2 SUBMITTAL
A. Action Submittals:
1. Provide Draft Directories for approval after completion of circuit tracing, coordinate naming convention with COR.
260553 - 2
IDENTIFICATION FOR ELECTRICAL SYSTEMS
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Comply with 29 CFR 1910.144 for color identification of hazards; 29 CFR 1910.145 for danger, caution, warning, and safety instruction signs and tags; and the following:
1. Fire-protection and fire-alarm equipment must be finished, painted, or suitably marked safety red.
B. Signs, labels, and tags required for personnel safety must comply with the following standards:
1. Safety Colors: NEMA Z535.1.
2. Facility Safety Signs: NEMA Z535.2.
3. Safety Symbols: NEMA Z535.3.
4. Product Safety Signs and Labels: NEMA Z535.4.
5. Safety Tags and Barricade Tapes for Temporary Hazards: NEMA Z535.5.
C. Adhesive-attached labeling materials, including label stocks, laminating adhesives, and inks used by label printers, must comply with UL 969.
D. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes.
2.2 COLOR AND LEGEND REQUIREMENTS
A. Warning Label Colors:
1. Identify system voltage with black letters on orange background.
B. Warning labels and signs must include, but are not limited to, the following legends:
1. Workspace Clearance Warning: "WARNING - OSHA REGULATION - AREA IN
FRONT OF ELECTRICAL EQUIPMENT MUST BE KEPT CLEAR FOR 36” (or 3
FEET) MINIMUM."
C. Equipment Identification Labels:
1. Black letters on white field.
2.3 LABELS
A. Self-Adhesive Labels: Polyester or Vinyl, thermal, transfer-printed, 3 mil thick, multicolor, weather- and UV-resistant, pressure-sensitive adhesive labels, configured for intended use and location.
1. Minimum Nominal Size:
a. 3-1/2 by 5 inch for equipment.
260553 - 3
IDENTIFICATION FOR ELECTRICAL SYSTEMS
2.4 TAPES AND STENCILS
A. Tape and Stencil: 4 inch wide black stripes on 10 inch centers placed diagonally over orange background and are 12 inch wide. Stop stripes at legends.
B. Stenciled Legend: In nonfading, waterproof, black ink or paint. Minimum letter height must be 1 inch.
2.5 SIGNS
A. Baked-Enamel Signs:
1. Preprinted aluminum signs, punched or drilled for fasteners, with colors, legend, and size required for application.
2. 1/4 inch grommets in corners for mounting.
3. Nominal Size: 7 by 10 inch.
B. Metal-Backed Butyrate Signs:
1. Weather-resistant, nonfading, preprinted, cellulose-acetate butyrate signs, with
0.0396 inch galvanized-steel backing, punched and drilled for fasteners, and with colors, legend, and size required for application.
2. 1/4 inch grommets in corners for mounting.
3. Nominal Size: 7 by 10 inch.
C. Laminated Acrylic or Melamine Plastic Signs:
1. Engraved legend.
2. Thickness:
a. For signs up to 20 sq. inch, minimum 1/16 inch thick.
b. For signs larger than 20 sq. inch, 1/8 inch thick.
2.6 MISCELLANEOUS IDENTIFICATION PRODUCTS
A. Paint: Retain paint system applicable for surface material and location (exterior or interior).
B. Fasteners for Labels and Signs: Self-tapping, stainless steel screws or stainless steel machine screws with nuts and flat and lock washers.
PART 3 - EXECUTION
3.1 PREPARATION
A. Self-Adhesive Identification Products: Before applying electrical identification products, clean substrates of substances that could impair bond, using materials and methods recommended by manufacturer of identification product.
260553 - 4
IDENTIFICATION FOR ELECTRICAL SYSTEMS
3.2 INSTALLATION
A. Verify and coordinate identification names, abbreviations, colors, and other features with requirements in other Sections requiring identification applications, Drawings, Shop Drawings, manufacturer's wiring diagrams, and operation and maintenance manual. Use consistent designations throughout Project.
B. Verify identity of item before installing identification products.
C. Install signs with approved legend to facilitate proper identification, operation, and maintenance of electrical systems and connected items.
D. Self-Adhesive Labels:
1. Install unique designation label that is consistent with wiring diagrams, schedules, and operation and maintenance manual.
2. Unless otherwise indicated, provide single line of text with 1/2 inch high letters on 1- 1/2 inch high label; where two lines of text are required, use labels 2 inch high.
E. Self-Adhesive Vinyl Tape: Secure tight to surface at location with high visibility and accessibility.
1. Field-Applied, Color-Coding Conductor Tape: Apply in half-lapped turns for minimum distance of 6 inch where splices or taps are made. Apply last two turns of tape with no tension to prevent possible unwinding.
F. Tape and Stencil: Comply with requirements in painting Sections for surface preparation and paint application.
G. Baked-Enamel Signs:
1. Attach signs that are not self-adhesive type with mechanical fasteners appropriate to location and substrate.
2. Unless otherwise indicated, provide single line of text with 1/2 inch high letters on minimum 1-1/2 inch high sign; where two lines of text are required, use signs minimum 2 inch high.
H. Metal-Backed Butyrate Signs:
1. Attach signs that are not self-adhesive type with mechanical fasteners appropriate to location and substrate.
2. Unless otherwise indicated, provide single line of text with 1/2 inch high letters on 1- 1/2 inch high sign; where two lines of text are required, use labels 2 inch high.
I. Laminated Acrylic or Melamine Plastic Signs:
1. Attach signs that are not self-adhesive type with mechanical fasteners appropriate to location and substrate.
2. Unless otherwise indicated, provide single line of text with 1/2 inch high letters on 1- 1/2 inch high sign; where two lines of text are required, use labels 2 inch high.
260553 - 5
IDENTIFICATION FOR ELECTRICAL SYSTEMS
3.3 IDENTIFICATION SCHEDULE
A. Install identification materials and devices at locations for most convenient viewing without interference with operation and maintenance of equipment. Install access doors or panels to provide view of identifying devices.
B. Warning Labels for Indoor Cabinets, Boxes, and Enclosures for Power and Lighting: Self-adhesive labels, Baked-enamel warning signs, or Metal-backed, butyrate warning signs.
1. Apply to exterior of door, cover, or other access.
C. Equipment Identification Labels:
1. Indoor Equipment: Self-adhesive label, Baked-enamel signs, or Metal-backed butyrate signs Laminated acrylic or melamine plastic sign.
2. Outdoor Equipment: Laminated acrylic or melamine sign or Stenciled legend 4 inch high.
END OF SECTION 260553
STATE VICINITIY MAP
SYMBOL
U.S. HIGHWAY
STATE HIGHWAY
DESCRIPTION
INTERSTATE HIGHWAY
NORTH CAROLINA
PROJECT
LOCATION
BREVARD
RALEIGH
DURHAM
ASHEVILLE
CHARLOTTE
FAYETTEVILLE
ROCKY MOUNT
HENDERSON
GREENSBORO
North Carolina
FRANKLIN
JOB CORPS
NATIONAL OFFICE
MULTIPLE BUILDING LIFE
SAFETY
LYNDON B. JOHNSON
JOB CORPS
CIVILIAN CONSERVATION
CENTER
NATIONAL FORESTS IN
NORTH CAROLINA
03/2023 10
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DATENO. REVISION / ISSUE
TITLESHEET
A. GARRISON, PE
W. KNAACK, PE
T1.0
1. T1.0 TITLE SHEET GENERAL
2. G1.0 SITE PLAN GENERAL
3. LS1.0 WELDING LIFE SAFETY PLAN - BASE 58
4. LS2.0 KENNEDY 1 & 2 LIFE SAFETY PLAN - BASE/OPTIONAL 10 &12
5. LS3.0 KENNEDY 3 LIFE SAFETY PLAN - BASE 14
6. LS4.0 JACKSON 4 LIFE SAFETY PLAN - BASE 16
7. LS5.0 MALE DORM LIFE SAFETY PLAN - BASE 81
8. LS6.0 ADMINISTRATION LIFE SAFETY PLAN - BASE/OPTIONAL 46
9. LS7.0 WELLNESS LIFE SAFETY PLAN - BASE 47
10. LS8.0 CEMENT MASONRY LIFE SAFETY PLAN - OPTIONAL 55
INDEX
SHEET SHEET
SUB
TITLE OF SHEET
(NO SCALE)
PROJECT LOCATION
BUILDING
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
MULTIPLE BUILDING LIFE SAFETY
NATIONAL FORESTS IN NORTH CAROLINA
LYNDON B. JOHNSON
JOB CORPS CENTER
MACON COUNTY, NORTH CAROLINA
SOUTHERN REGION
U.S. LOCATION MAP
PROJECT
LOCATION
PROJECT ADDRESS
3170 WAYAH ROAD
FRANKLIN, NORTH CAROLINA, 28734
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5/1/23 10:06 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\TITLE_SHEET 2023 MBLDG LS.DWG; 10:06 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\TITLE_SHEET 2023 MBLDG LS.DWG;10:06 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\TITLE_SHEET 2023 MBLDG LS.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\TITLE_SHEET 2023 MBLDG LS.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\TITLE_SHEET 2023 MBLDG LS.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\TITLE_SHEET 2023 MBLDG LS.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\TITLE_SHEET 2023 MBLDG LS.DWG;;
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
STAMPS, LOGOS, AND SEALS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
ARCHIVE NO.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
DATE
10 12 62
14 19
16 18
70 48
WAYAH CREEK
WAYAH ROAD
SEMAPHORE GATE
80'
70'
80'
90'
40'
30'
20'
10'
100'
80'
80' 70'
80'
80'
70'
70'
13A
22B
22A
87B
87A
FOOTBALL/SOCCER
FIELD
TRACK
11A
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DATENO. REVISION / ISSUE
SITE PLAN
A. GARRISON, PE
W. KNAACK, PE
G1.0
JOB CORPS
NATIONAL OFFICE
XX PROJECT NAME
LYNDON B. JOHNSON JOB
CORPS
CIVILIAN CONSERVATION
CENTER
NATIONAL FORESTS IN NORTH
CAROLINA
03/2023 10
Existing Site Plan
L. B. Johnson Civilian Conservation Center Franklin, North Carolina
BUILDING LEGEND
10 - KENNEDY I
12 - KENNEDY II
13 - TRAINING CENTER
14 - KENNEDY III
15 - INDEPENDENT LIVING
16 - JACKSON 4
18 - JACKSON 5
19 - STUDENT SUPPORT SERVICES
22 - GYMNASIUM
23 - DINING HALL
24 - LAUNDRY FACILITY
30 - BUSINESS TECHNOLOGIES
34 - BRICK MASONRY
36 - CSO
46 - ADMINISTRATION
47 - WELLNESS
48 - STORAGE
50 - SUPPLY WAREHOUSE
51 - MAINTENANCE STORAGE/OFFICE
52 - CARPENTRY
53 - FACILITY MAINTENANCE AND CONSTRUCTION
54 - PAINT SHOP
55 - CONCRETE FINISHING
58 - WELDING
62 - DUTY OFFICE
70 - VOCATIONAL OFFICE
71 - HAZMAT STORAGE
81 - MALE DORMITORY
84 - DRY FOOD STORAGE
87 - EDUCATION BUILDING
STRUCTURES
11A-STORAGE
13A-STORAGE
20 - RECREATION STORAGE
21 - RECREATION SHELTER
22A-STORAGE
22B-STORAGE
25 - SUPPLY WATER TREATMENT
26 - GAZEBO
28 - POOL WATER TREATMENT
20 - STORAGE
31 - RESIDENTIAL LIVING STORAGE
32 - SHELTER
33 - GROUND STORAGE
61 - BRICK STORAGE
72 - STORAGE SHED
73 - POLE SHED STORAGE
75 - GAZEBO
76 - GAZEBO
77 - GAZEBO
78 - SHELTER
79 - GAZEBO
82 - SHELTER
85 - GAZEBO
86 - GAZEBO
87A-STORAGE
87B-STORAGE
88 - GAZEBO
89 - GAZEBO
90 - SHELTER
91 - PICNIC SHELTER
BUILDING LEGEND
100 0 100
SCALE OF FEET
SHADING DENOTES BUILDINGS
INCLUDED IN THIS PACKAGE
AutoCAD SHX Text 5/30/23 15:57 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\2023 LBJ MBLDG LS REV 20230530.DWG; 15:57 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\2023 LBJ MBLDG LS REV 20230530.DWG;15:57 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\2023 LBJ MBLDG LS REV 20230530.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\2023 LBJ MBLDG LS REV 20230530.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\2023 LBJ MBLDG LS REV 20230530.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\2023 LBJ MBLDG LS REV 20230530.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\03_MULTIBLDG\2023 MBLDG LS\DWGS\2023 LBJ MBLDG LS REV 20230530.DWG;;
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
STAMPS, LOGOS, AND SEALS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
ARCHIVE NO.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
CLASSROOM
DN RAMP
MECH
W
DN
M
EQUIPMENT
ST. ST.
WELDING SHOP
WELDING
BOOTHS
STOR.
STOR.
OFFICE
TOOL RM
LOCKERS
GRINDING
ROOM UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DATENO. REVISION / ISSUE
BLDG 58 - WELDING LIFE
SAFETY PLAN -
BASE/OPTIONAL
A. GARRISON, PE
W. KNAACK, PE
LS1.0
JOB CORPS
NATIONAL OFFICE
MULTIPLE BUILDING
LIFE SAFETY
LYNDON B. JOHNSON JOB
CORPS
CIVILIAN CONSERVATION
CENTER
NATIONAL FORESTS IN NORTH
CAROLINA
03/2023 10
GENERAL NOTES
1. EXISTING INFORMATION SHOWN ON DRAWINGS HAS BEEN
TAKEN FROM LIMITED FIELD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .