008 SCH MULT BLDG LS MINORMECH SPECS_PLANS reduced.pdf

PDF 775 KB Posted

Attached to
North Carolina Multiple Job Corps Center Life Safety Repairs
Solicitation number
1282A723R0015
Issued by

About this file

This package includes specifications and drawings for life safety repairs at multiple buildings at the Schenck Job Corps Center in Pisgah Forest, North Carolina. The work includes replacing the air handler plenum and installing attic draftstops. For the plenum replacement in Building 80, the contractor must remove and reinstall ductwork, piping, equipment, and controls as needed. For Building 81, the contractor must construct draftstop walls in the attic to subdivide the space into sections no larger than 3,000 square feet, including access doors. The specifications provide requirements for submittals, site access, waste disposal, safety, and closeout procedures. The drawings depict the scope of work at each building. The solicitation number is 1282A723R0015 from the Department of Agriculture Forest Service for the North Carolina Multiple Job Corps Center Life Safety Repairs.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PACKAGE 008

SCHENCK JOB CORPS CENTER

MULTIPLE BUILDING LIFE SAFETY –MINOR MECHANICAL

SPECIFICATIONS AND PLANS

MAY 2023

MULTIPLE BUILDING LS MINOR MECHANICAL 010150 – 1

SCHENCK JOB CORPS CCC GENERAL REQUIREMENTS

SCHENCK JOB CORPS CENTER

MULTIPLE BUILDING LIFE SAFETY -

MINOR MECHANICAL

SECTION 010150 GENERAL

REQUIREMENTS

PART 1 – SUMMARY OF WORK

1.1 DESCRIPTION

A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:

1. Base Item No. 1 – Bldg 80, Fire Management Air Handler Plenum

2. Base Item No. 2 – Bldg 81, Male Dormitory Attic Draftstops

1.2 LOCATION

A. This project is located at 98 Schenck Drive, Pisgah Forest N.C 28768. Driving instructions can be obtained from the Center by calling 828.862.6100.

1.3 WORK HOURS

A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday.

1.4 POINT OF CONTACT

A. Center Point of Contact: John “Bill” Davis, ph: 828.577.3469, email:

john.davis6@usda.gov.

1.5 USE OF PREMISES

A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-to-day operations.

C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government.

1.6 WORK RESTRICTIONS

MULTIPLE BUILDING LS MINOR MECHANICAL 010150 – 2

A. Smoking is permitted on campus only in the designated smoking area.

1.7 SCHEDULE OF ITEMS

A. Schedule of Items:

1. Provide pricing for all items listed in the Schedule of Items.

2. Contract award will be made for all Base Items.

3. Optional Items may or may not be awarded, depending on funding availability.

B. Base Items (BI):

1. Base Item No. 1 – Bldg 80, Fire Management Air Handler Plenum

a. Measurement: This item is measured as a Lump Sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to:

i. Remove and reinstall air handler, refrigerant lines, electric controls, dx coil, and ducts as required for the plenum replacement.

ii. Remove air handler plenum and equipment platform constructed of wood in Fire Management Building.

iii. Provide standard metal supports for air handler, construct new plenum out of insulated sheet metal, incorporate air filter section, and access door.

c. Deficiencies: #133963.

2. Base Item No. 2 – Bldg 81, Male Dormitory Attic Draftstops

a. Measurement: This item is measured as a Lump Sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to:

i. Construct attic draft stop walls in attic, draft stops shall be located to subdivide attic into areas that do not exceed 3,000 sf.

ii. Incorporate self-closing and latching access panels in each draft stop wall, ensure location provides for full operability of the panels.

iii. Reroute or remove and reinstall ducts, pipes, electrical as needed to install draft stop walls.

iv. Draftstops shall fully enclose space between main level ceiling and roof deck.

a. Deficiencies: #96246.

C. Optional Items (OI):

1. Not used this contract.

MULTIPLE BUILDING LS MINOR MECHANICAL 010150 – 3

PART 2 – PROJECT SCHEDULE

2.1 PROJECT SCHEDULE

ITEM* REQUIRED DUE DATE (calendar days)

Pre-Construction Conference

Within 10 days of Award (Virtually)

Notice To Proceed (NTP)

Issued first weekday after Pre-Construction Conference

Bonds 10 days after NTP

Action and Informational Submittals

10 days after NTP (CORs have 10 calendar days to return)

Closeout Submittals prior to CO acceptance of project

Contract Release form and final pay request

10 days after CO acceptance of project

* All items above must be included in contractor’s construction schedule

PART 3 – SUBMITTAL PROCEDURES

3.1 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Government approval.

B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements.

MULTIPLE BUILDING LS MINOR MECHANICAL 010150 – 4

3.2 PROCEDURES

A. Contractor Responsibilities

1. Review each submittal and check for compliance with the Contract Documents.

2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

3. Include the following information on label or cover sheet for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. Date of Contractor’s approval.

i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents.

4. The Government will not review submittals that do not bear Contractor's approval and will return them without action.

5. Unless additional copies are required for final submittal, and unless the

Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

6. Submittals must be submitted in electronic PDF format. Submit to CO via email or electronic file transfer site.

7. Only final submittals with mark indicating action taken by Government are to be used for construction.

8. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

B. Processing Time: Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Government will review initial submittal within 10 working days.

Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. Resubmittals: If resubmittal is necessary, it will be processed in same timeframe as initial submittal.

3.3 ACTION SUBMITTALS

A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.

B. Collect information into a single submittal for each element of construction and type of product or equipment.

MULTIPLE BUILDING LS MINOR MECHANICAL 010150 – 5

1. Mark up each submittal to show which products and options are applicable.

2. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

C. Required Action Submittals

1. Product Data: See Technical Specification Sections.

3.4 INFORMATIONAL SUBMITTALS

A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated below:

B. Required Informational Submittals:

1. Accident Prevention Plan.

2. Construction Schedule.

3.5 CLOSEOUT SUBMITTALS

A. Prepare and submit Closeout Submittals, as follows:

1. See Technical Specification Sections.

2. Project Record Documents.

PART 4 – TEMPORARY FACILITIES AND CONTROLS

4.1 USE OF UTILITIES

A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service. The contractor is expected to provide whatever phone service he deems necessary for the duration of the project.

4.2 SANITARY FACILITIES

A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily.

MULTIPLE BUILDING LS MINOR MECHANICAL 010150 – 6

4.3 STAGING AND STORAGE

A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR).

4.4 CONSTRUCTION WASTE DISPOSAL FACILITIES

A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Use of Government waste containers will not be permitted.

4.5 SAFETY AND ENVIRONMENTAL PROTECTION

A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform personnel, students, and the public of possible hazards.

C. Fire Protection.

1. Store combustible materials in containers in fire-safe locations.

2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

PART 5 – EXECUTION REQUIREMENTS

5.1 EXAMINATION

A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

B. Field verify all new and existing dimensions affecting the work of this contract before ordering products.

MULTIPLE BUILDING LS MINOR MECHANICAL 010150 – 7

C. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.

5.2 INSTALLATION

A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction.

B. Make vertical work plumb and make horizontal work level.

C. Install per manufacturer's written instructions and recommendations.

5.3 PROGRESS CLEANING

A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.

1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris.

2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).

B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.

5.4 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion.

5.5 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

PART 6 – CLOSEOUT PROCEDURES

6.1 SUBSTANTIAL COMPLETION

A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.

MULTIPLE BUILDING LS MINOR MECHANICAL 010150 – 8

B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise the CO of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.

4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities.

5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.

6. Complete startup testing of systems.

7. Submit changeover information related to Government occupancy, use, operation, and maintenance.

8. Complete final cleaning requirements, including touchup painting.

9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final

Completion.

6.2 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.

MULTIPLE BUILDING LS MINOR MECHANICAL 010150 – 9

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

6.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

6.4 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

2. Remove tools, construction equipment, machinery, and surplus material from Project site.

3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

D. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION 010150

MULTIPLE BUILDING LS MINOR MECHANICAL 010150 – 10

THIS PAGE IS INTENTIONALLY LEFT BLANK

MULTIPLE BUILDING LS MINOR MECHANICAL

SCHENCK JOB CORPS CCC

024119 - 1

SELECTIVE DEMOLITION

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

2. Demolition and removal of selected site elements.

3. Salvage of existing items to be reused or recycled.

1.2 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1.3 INFORMATIONAL SUBMITTALS

A. Schedule of selective demolition activities with starting and ending dates for each activity.

1.4 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by government as far as practical.

C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. If suspected hazardous materials are encountered, do not disturb; immediately notify Contracting Officer.

D. Storage or sale of removed items or materials on-site is not permitted.

E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

024119 - 2

SELECTIVE DEMOLITION

F. Arrange selective demolition schedule so as not to interfere with government's operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Inventory and record the condition of items to be removed and salvaged. Notify the CO upon removal if the condition of mechanical equipment warrants replacement instead of salvage and reinstallation.

3.2 PREPARATION

A. General Contractor is responsible for coordination between trades and Contracting Officer (CO) for temporary shutdown of equipment, electricity, plumbing, mechanical systems, etc as required for removal and reinstallation associated with this project.

3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Arrange to shut off utilities with utility companies.

2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

024119 - 3

SELECTIVE DEMOLITION

3.4 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

C. Remove temporary barricades and protections where hazards no longer exist.

3.5 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required.

Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

4. Maintain fire watch during and for at least 1 hours after flame-cutting operations.

5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

6. Capture refrigerant for re-use for HVAC equipment that will be reinstalled. Add additional refrigerant as required by equipment manufacturer upon reinstallation to adhere with manufacturer’s installation requirements.

7. Dispose of demolished items and materials promptly in accordance with State and Federal requirements.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

024119 - 4

SELECTIVE DEMOLITION

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by the Contracting Officer, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.6 CLEANING

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn demolished materials.

C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

061000 - 1

ATTIC DRAFTSTOPPING

SECTION 061000 – ATTIC DRAFTSTOPPING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Framing with dimension lumber.

2. Draftstop wall panels.

3. Accessories:

a. Draftstop access doors.

1.2 SUBMITTALS

A. Product Data:

1. For each type of access door.

2. Wood structural panels.

3. Framing lumber.

B. Closeout: Furnish keys (if applicable) to Center POC.

C. Schedule: Door and Frame Schedule, including types, general locations, sizes, installation details, latching and/or locking provisions.

1. The contractor shall verify dimensions of existing mechanical equipment that if it were removed would need to pass through the draft stop access door and provide this information with the access door submittal.

1.3 Quality Assurance

A. Size and Location Verification: Determine specific location and sizes for access doors proposed for draftstop walls.

PART 2 - PRODUCTS

2.1 WOOD PRODUCTS, GENERAL

A. Lumber: Comply with DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, comply with the applicable rules of any rules-writing agency certified by the ALSC Board of Review. Grade lumber by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated.

1. Factory mark each piece of lumber with grade stamp of grading agency.

061000 - 2

ATTIC DRAFTSTOPPING

2. Dress lumber, S4S, unless otherwise indicated.

B. Maximum Moisture Content:

1. Dimension Lumber: 19 percent unless otherwise indicated.

2.2 DIMENSION LUMBER FRAMING

A. Interior Framing by Grade: Construction or No. 2 grade.

1. Application: All interior framing.

2. Species:

a. Southern pine or mixed southern pine; SPIB.

b. Northern species; NLGA.

c. Eastern softwoods; NeLMA.

d. Western woods; WCLIB or WWPA.

2.3 DRAFTSTOP WALL PANELS

A. Draftstop Wall Panels: Provide framing for draftstop panel support anchored to existing framing materials. Draftstop wall panels will consist of one or more of the following:

1. 1” minimum nominal lumber.

2. 15/32” minimum thickness wood structural panels of either plywood or OSB.

a. Exposure: Interior or exterior.

b. Grade: C or better.

3. ½” gypsum board.

4. Mineral wool or glass fiber batts/blankets/boards.

a. FSK Faced.

b. Lap and foil tape joint with tape compatible with foil facing.

c. Securely fasten to framing to support blanket gravity loads and resist air movement.

d. Minimum R-value: R-8.

5. Sealants and expanding foam: Noncombustible.

2.4 MISCELLANEOUS LUMBER

A. Provide miscellaneous lumber indicated and lumber for support or attachment of other construction, including the following:

1. Blocking.

2. Nailers.

3. Cants.

4. Furring.

5. Grounds.

061000 - 3

ATTIC DRAFTSTOPPING

B. Dimension Lumber Items: Construction or No. 2 grade lumber of any species.

C. Concealed Boards: 19 percent maximum moisture content and any of the following species and grades:

1. Mixed southern pine or southern pine.

2. Eastern softwoods.

3. Northern species.

4. Western woods.

2.5 FASTENERS

A. General: Fasteners are to be of size and type indicated and comply with requirements specified in this article for material and manufacture. Provide nails or screws, in sufficient length, to penetrate not less than 1-1/2 inches into wood substrate.

1. Where rough carpentry is exposed to weather, in ground contact, pressure-preservative treated, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with ASTM A153/A153M.

2.6 ACCESSORIES

A. Draftstop Access Doors: Doors shall be the larger of: sized to allow removal of HVAC existing equipment installed in the attic space served or no smaller than 22” wide x30” tall.

1. Frame: Minimum 16-gauge steel.

2. Door: Minimum 14-gauge steel.

a. Hinged, self-closing and self-latching.

b. Hinge: continuous piano or continuous pin type.

c. Latch: Self-latching, operable from both sides of the door without special tool or hardware.

d. Keyed: Not required, if latch is keyed provide a minimum of 2 keys per keyed latch

3. Finish: White powder coat.

4. Flange: 1” +/-

PART 3 - EXECUTION

3.1 INSTALLATION

A. Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame Construction," unless otherwise indicated.

061000 - 4

ATTIC DRAFTSTOPPING

B. Set work to required levels and lines, with members plumb, true to line, cut, and fitted.

Fit rough carpentry accurately to other construction. Locate furring, nailers, blocking, grounds, and similar supports to comply with requirements for attaching other construction.

C. Do not splice structural members between supports unless otherwise indicated.

D. Do not cut or notch existing structural members without approval by the Contracting Officer.

E. Securely attach rough carpentry work to substrate by anchoring and fastening as indicated, complying with the following:

1. Table 2304.9.1, "Fastening Schedule," in ICC's International Building Code

(IBC).

F. Draftstop walls shall be fastened to existing attic framing members and be continuous from the ceiling below to the roof deck sheathing above.

1. Add supplementary wood framing as required for support of draftstop panel materials and fasten securely to existing building framing.

2. Draft stop walls shall be paneled with any of the approved materials. Joints in finish materials shall have butt joints centered on wood framing members.

3. Lap and tape flexible wall materials and securely fasten to framing per manufacturer’s recommended fastening schedule with cap nails or similar fastening methods intended to distribute fastening surface area and prevent tearing.

4. Frame around ducts, and similar penetrations as required for support of draft stop finishes, seal edges, penetrations through draftstop wall, and gaps with non-combustible sealants.

5. Frame draftstop access door locations with 2x lumber, install draftstop access door in location that provides the best direct access through the wall without reducing attic insulation depths, install framing and supports as required for door installation and construct wooden landings above attic insulation spanning between adjoining ceiling joists or trusses on each side of the access doors that match the access door width. Adjust doors and hardware after installation for proper operation.

a. Landings at draftstop access doors shall be constructed to support a 20 psf live load.

END OF SECTION 061000

237300-1

AIR-HANDLING DUCTS AND ACCESSORIES

SECTION 237300 – AIR HANDLING DUCTS AND ACCESSORIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes replacement of air handler plenum, air handler supports, air filter frame and filter, and any required removal and reinstallation of existing equipment:

1. Equipment supports and vibration isolation.

2. Air filtration.

3. Dampers.

4. Ducts

5. Duct Insulation

6. Sealants and adhesives.

1.2 ACTION SUBMITTALS

A. Product Data: For the following:

1. Duct Insulation.

2. Air Filter and Frame Assembly.

3. Adhesives.

4. Equipment Supports.

B. Shop Drawings: For Contractor designed plenum, include air filter frame, and air handler support for approval by the Contracting Officer. Neatly printed hand-drawn and scanned/submitted in pdf format are acceptable.

1. Include plans, elevations, sections, and mounting attachment details.

2. Include details of equipment assemblies. Indicate dimensions, weights, loads, and required clearances.

3. Include required ASCE 7 load calculations and coordinate with equipment support submittals.

1.3 INFORMATIONAL SUBMITTALS

A. Condition Report: For the following:

1. Air handler and associated piping and electrical.

a. Contractor shall inspect air handler prior to removal for proper operation in accordance with manufacturer’s operating parameters. Include equipment data plate information. Make special note of any inoperable parts that will require either replacement of the part or of the air handling equipment as a

237300-2

AIR-HANDLING DUCTS AND ACCESSORIES

whole. The government may at their discretion elect to modify the contract to include replacement of parts or the air handler.

1) Note: This does not eliminate the Contractor’s responsibility to provide incidental parts, fittings, and extension of piping, electrical, etc. for the reinstallation of equipment to accommodate the new plenum in accordance with the current codes.

B. CLOSEOUT

1. Provide required spare air filters to center POC.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. NFPA Compliance: Comply with NFPA 90A for design, fabrication, and installation of air-handling units and components.

C. ASHRAE 62.1 Compliance: Applicable requirements in ASHRAE 62.1, Section 5 - "Systems and Equipment" and Section 7 - "Construction and Startup."

D. ASHRAE/IES 90.1 Compliance: Applicable requirements in ASHRAE/IES 90.1, Section 6 - "Heating, Ventilating, and Air-Conditioning."

E. All work shall conform to the requirements of the most recent versions of the International Code Council Family of Codes e.g. International Building Code and International Mechanical Code, and relevant National Fire Protection Agency standards and codes e.g. NFPA 70 (National Electric Code).

F. Delegated Duct Design: Duct construction, including sheet metal thicknesses, seam and joint construction, reinforcements, and hangers and supports, comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible".

G. Insulation:

1. Surface-Burning Characteristics: For insulation and related materials, as determined by testing identical products in accordance with ASTM E84, by a testing agency acceptable to the Contracting Officer. Factory label insulation, jacket materials, adhesive, mastic, tapes, and cement material containers with appropriate markings of applicable testing agency.

a. Flame-spread index of 25 or less, and smoke-developed index of 50 or less.

2. Products do not contain, asbestos, lead, mercury, or formaldehyde.

237300-3

AIR-HANDLING DUCTS AND ACCESSORIES

2.2 PRODUCTS

A. Plenum Ductwork, single wall round and rectangular:

1. General Fabrication Requirements: Comply with SMACNA’s “HVAC Duct Construction Standards – Metal and Flexible”.

2. Construct ducts of galvanized sheet steel, unless otherwise approved.

a. Galvanized Coating Designation: G60

B. Sealants and Gaskets: Surface- burning characteristics for sealants and gaskets are to be a maximum flame-spread index of 25 and a maximum smoke-developed index of 50 when tested in accordance with UL 723; certified by an NRTL.

C. Duct Hangers and Supports: Galvanized steel.

D. Filters:

1. MERV Rating: 13.

2. Size and Type: Per Contractors approved shop drawings.

a. Size filter to ensure air handler operates within manufacturer’s recommended operating limits.

E. Side-Access Filter Mounting Frames:

1. Particulate Air Filter Frames: Match inner casing and outer casing material, and insulation thickness. Galvanized steel track.

a. Sealing: Incorporate positive-sealing device to ensure seal between gasketed material on channels to seal top and bottom of filter cartridge frames to prevent bypass of unfiltered air.

F. Duct Insulation:

1. Glass-Fiber Blanket: Glass fibers bonded with a thermosetting resin; suitable for maximum use temperature up to 450 deg F in accordance with ASTM C411.

Comply with ASTM C553, Type II.

2. Factory-Applied Jacket:

a. FSK Jacket: Aluminum-foil, fiberglass-reinforced scrim with kraft-paper backing; complying with ASTM C1136, Type II.

3. Tapes: FSK, Foil-face, matching factory-applied jacket with acrylic adhesive;

complying with ASTM C1136.

a. Width: 3” Minimum.

b. Thickness: 6.5 Mils.

c. Adhesion: 90 ounces force/inch in width.

d. Tensile Strength: 40 lbf/inch in width.

4. Securements: Provide fasteners, staples, and other securements as recommended by insulation manufacturer for the duct assembly installation conditions.

237300-4

AIR-HANDLING DUCTS AND ACCESSORIES

G. Equipment supports:

1. Provide wall and/or ceiling mounted equipment supports for the air handling unit of galvanized steel. Calculate required load capacity in accordance with ASCE 7.

a. Material: Galvanized steel, steel gauge, dimensions, and other salient features in accordance with load requirements, manufacturer’s recommendations, and equipment clearance requirements.

b. Provide vibration isolation devices compatible with equipment and supports.

PART 3 - EXECUTION (Not Applicable)

3.1 INSTALLATION, GENERAL

A. Perform selective demolition in accordance with Section 024119. If air handler removal is required for new duct plenum construction, securely store equipment for future reinstallation. Protect piping, electrical, and existing ducts to be reconnected from damage.

B. Equipment Mounting:

1. Install air-handling units on wall and/or ceiling supported steel frames using threaded steel rods and spring hangers. Coordinate sizes and locations of structural-steel support members with actual equipment to be installed. Provide vibration isolation devices.

a. Arrange installation of units to provide access space around air-handling units for service and maintenance.

C. Duct Installation: Install ducts in accordance with approved shop drawings.

1. Install ducts in accordance with SMACNA's "HVAC Duct Construction

Standards - Metal and Flexible" unless otherwise indicated.

2. Install ducts in maximum practical lengths with fewest possible joints.

3. Install factory- or shop-fabricated fittings for changes in direction, size, and shape and for branch connections.

4. Unless otherwise indicated, install ducts vertically and horizontally, and parallel and perpendicular to building lines.

5. Install ducts close to walls, overhead construction, columns, and other structural and permanent enclosure elements of building.

6. Install ducts with a clearance of 1 inch, plus allowance for insulation thickness.

7. Route ducts to avoid passing through transformer vaults and electrical equipment rooms and enclosures.

8. Where ducts pass through non-fire-rated interior partitions and exterior walls and are exposed to view, cover the opening between the partition and duct or duct insulation with sheet metal flanges of same metal thickness as the duct. Overlap openings on four sides by at least 1-1/2 inches.

9. Protect duct interiors from moisture, construction debris and dust, and other foreign materials both before and after installation

237300-5

AIR-HANDLING DUCTS AND ACCESSORIES

10. Elbows: Use long-radius elbows wherever they fit.

11. Fabricate 90-degree rectangular mitered elbows to include turning vanes.

12. Fabricate 90-degree round elbows with a minimum of three segments for 12 inches and smaller and a minimum of five segments for 14 inches and larger.

13. Branch Connections: Use lateral or conical branch connections.

D. Duct Insulation: Install insulation materials, accessories, and finishes with smooth, straight, and even surfaces; free of voids throughout the length of ducts and fittings.

1. Install insulation materials, vapor barriers or retarders, jackets, and thicknesses required for each item of duct system as specified in insulation system schedules.

2. Install accessories compatible with insulation materials and suitable for the service. Install accessories that do not corrode, compress, or otherwise damage insulation or jacket.

3. Install insulation with longitudinal seams at top and bottom of horizontal runs.

4. Install multiple layers of insulation with longitudinal and end seams staggered.

5. Keep insulation materials dry during application and finishing. Replace insulation materials that get wet during storage or in the installation process.

6. Install insulation with tight longitudinal seams and end joints. Bond seams and joints with adhesive recommended by insulation material manufacturer.

7. Install insulation with least number of joints practical.

8. Apply adhesives, mastics, and sealants at manufacturer's recommended coverage rate and wet and dry film thicknesses.

9. Install insulation with factory-applied jackets as follows:

a. Draw jacket tight and smooth, but not to the extent of creating wrinkles or areas of compression in the insulation.

b. Cover circumferential joints with 3-inch-wide strips, of same material as insulation jacket. Secure strips with adhesive and outward clinching staples along both edges of strip, spaced 4 inches o.c.

c. Overlap jacket longitudinal seams at least 1-1/2 inches. Clean and dry surface to receive self-sealing lap. Staple laps with outward clinching staples along edge at 4 inches o.c.

1) For below ambient services, apply vapor-barrier mastic over staples.

d. Cover joints and seams with tape, according to insulation material manufacturer's written instructions, to maintain vapor seal.

10. Cut insulation in a manner to avoid compressing insulation.

11. Finish installation with systems at operating conditions. Repair joint separations and cracking due to thermal movement.

12. Repair damaged insulation facings by applying same facing material over damaged areas. Extend patches at least 4 inches beyond damaged areas. Adhere, staple, and seal patches similar to butt joints.

13. Install insulation continuously through non-rated wall/ceiling penetrations.

a. Seal penetrations with flashing sealant.

E. Reconnect air handler piping, electrical, controls, and other connections (if applicable) in accordance with referenced codes, standards, and manufacturer installation instructions.

237300-6

AIR-HANDLING DUCTS AND ACCESSORIES

F. Do not operate fan system until filters (temporary or permanent) are in place. Replace temporary filters used during construction and testing with new, clean filters.

G. Connect duct to air-handling units with flexible connections.

3.2 STARTUP SERVICE

A. Perform startup service.

1. Complete installation and startup checks and tests according to manufacturer's written instructions.

2. Verify that unit is secure on mountings and supporting devices and that connections to piping, ducts, and electrical systems are complete. Verify that proper thermal-overload protection is installed in motors, controllers, and switches.

3. Verify proper motor rotation direction, free fan wheel rotation, and smooth bearing operations. Reconnect fan drive system, align belts, and install belt guards.

4. Verify that bearings, pulleys, belts, and other moving parts are lubricated with factory-recommended lubricants.

5. Verify that proper thermal-overload protection is installed for electric coils.

6. Check refrigerant pressures and adjust in accordance with manufacturer’s installation instructions.

7. Install new, clean filters.

3.3 CLEANING

A. After completing system installation and startup tests and checks, of air-handling unit and air-distribution systems, and after completing startup service, clean air-handling units internally to remove foreign material and construction dirt and dust. Clean fan wheels, cabinets, dampers, coils, and filter housings, and install new, clean filters.

3.4 DEMONSTRATION

A. Demonstrate performance of the equipment to Owner's maintenance personnel.

END OF SECTION 237300

JOB CORPS

NATIONAL OFFICE

MULTIPLE BUILDING

LIFE SAFETY -

MINOR MECHANICAL

SCHENCK JOB CORPS

CIVILIAN CONSERVATION

CENTER

PISGAH

NATIONAL FOREST

1/2023 4

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

COVER SHEET

A.GARRISON, PE

L. CARROLL, PE

T1.0

1. T1.0 COVER SHEET NA

2. G1.0 SITE PLAN NA

3. LS1.0 FIRE MANAGEMENT LIFE SAFETY PLAN B80

4. LS2.0 MALE DORMITORY LIFE SAFETY PLAN B81

INDEX

SHEET SHEET

SUB

TITLE OF SHEET

PROJECT ADDRESS

98 SCHENCK DRIVE,

PISGAH FOREST, NC 28768

GOOGLE MAPS (2022), NO SCALE

PROJECT LOCATION

BUILDING

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

MULTIPLE BUILDING LIFE

SAFETY MINOR MECHANICAL

PISGAH

NATIONAL FOREST

SCHENCK JOB CORPS

CENTER

TRANSYLVANIA

COUNTY, NORTH

CAROLINA

SOUTHERN REGION

U.S. LOCATION MAP

PROJECT

LOCATION

PROJECT

LOCATION

AutoCAD SHX Text 3/20/23 13:40 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDGLS COVER MECH.DWG; 13:40 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDGLS COVER MECH.DWG;13:40 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDGLS COVER MECH.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDGLS COVER MECH.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDGLS COVER MECH.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDGLS COVER MECH.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDGLS COVER MECH.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

DATE

PARKING

PARKING

Schenck Civilian Conservation Center Pisgah Forest, North Carolina

BUILDINGS

3 - BREVARD HALL

10 - CENTER MAINTENANCE

11 - LANDSCAPING STORAGE

16 - WELDING/ BLDG. MAINTENANCE

20 - IT OFFICES

26 - ORIENTATION/COUNSELING

27 - RECREATION STORAGE

28 - STORAGE

29 - PAINT BOOTH/STORAGE

30 - GYMNASIUM

36 - FORESTRY DORMITORY

38 - PISGAH HALL (FEMALE DORM)

45 - INDEPENDENT LIVING

46 - INDEPENDENT LIVING

47 - INDEPENDENT LIVING

48 - LAUNDRY/ WAREHOUSE

49 - AUTOMOTIVE MECHANICS SHOP

50 - ADMINISTRATION BUILDING

51 - EDUCATION BUILDING

53 - WELLNESS

60 - FRESH START STORAGE

62 - VOCATIONAL BUILDING

66 - VOCATIONAL OFFICES

75 - LANDSCAPING CLASSROOM

77 - EDUCATION ANNEX

78 - MAINTENANCE STORAGE

79 - VACANT

80 - FIRE MANAGEMENT

81 - MALE DORMITORY

83 - DINING HALL

84 - DUTY OFFICE

STRUCTURES

32 - GREENHOUSE

59 - STORAGE SHED

69 - PICNIC SHELTER

73 - DUG-OUT NO.1

74 - DUG-OUT NO. 2

82 - BALLFIELD RESTROOM

85 - STORAGE

86 - GATE HOUSE

87 - VOCATIONAL STORAGE

32-1 - GREENHOUSE

32-2 - PUMP HOUSE

32-3 - STORAGE

32-4 - GREENHOUSE

36-1 - STORAGE

46-1 - RESIDENTIAL STORAGE

47-1 - RESIDENTIAL STORAGE

49-1 - STORAGE

49-2 - STORAGE

80-1 - STORAGE

G1 - GAZEBO

80-1 47-1 46-1 49

49-1 49-2 16

LEGEND

Figure ES-1

Existing Site Plan 150 300 600 Feet

36-1

G-1 46 45 80

32-4

73 28

32-2

MINIATURE

GOLF

32-1

32-3

DAVID

SON R

IVER

PARKING

SC

HE

NC

K

RD

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

SITE PLAN

A.GARRISON, PE

L. CARROLL, PE

G1.0

JOB CORPS

NATIONAL OFFICE

SCHENCK JCC 2022

MULT. BLDG. LIFE

SAFETY MINOR

MECHANICAL

SCHENCK

JOB CORPS

CIVILIAN CONSERVATION

CENTER

PISGAH NATIONAL FOREST

1/2023 4

HATCHING DENOTES BUILDINGS

INCLUDED IN THIS CONTRACT

AutoCAD SHX Text 3/20/23 13:40 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDG LS MECH.DWG; 13:40 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDG LS MECH.DWG;13:40 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDG LS MECH.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDG LS MECH.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDG LS MECH.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDG LS MECH.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\SCHENCK\03_MULTIBLDG\2022-SCH MULT BLDG LS MINOR MECH\_DWGS\SCH JCC 2022 MULTBLDG LS MECH.DWG;;

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

DESIGNER

AutoCAD SHX Text

STAMPS, LOGOS, AND SEALS

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text

DRAWING TITLE

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

ARCHIVE NO.

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

UNITED STATES

DEPARTMENT OF AGRICULTURE

FOREST SERVICE

DATENO. REVISION / ISSUE

BUILDING 80, FIRE

MANAGEMENT

LIFE SAFETY

PLAN

A.GARRISON, PE

L. CARROLL, PE

LS1.0

JOB CORPS

NATIONAL OFFICE

MULTIPLE BUILDING

LIFE SAFETY - MINOR

MECHANICAL

SCHENCK JOB CORPS

CIVILIAN CONSERVATION

CENTER

PISGAH NATIONAL FOREST

1/2023 4

NOTES:

1. DIMENSIONS, SCALES, AND PHOTOS ARE FOR GENERAL PROJECT SCOPING

ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACCURATELY

MEASURING AND REVIEWING SPACES TO ASCERTAIN THE FULL EXTENT OF

THE WORK REQUIRED AND FOR MATERIAL PROCUREMENT AND INSTALLATION

PURPOSES.

KEY NOTES

REMOVE WOODEN RETURN PLENUM, CONSTRUCT AND INSTALL A REPLACEMENT SHEET METAL

PLENUM, INSULATE PLENUM IN ACCORDANCE WITH ASHRAE 90.1(2019) AND IECC (2021)

STANDARDS (R-6 MINIMUM). NEW PLENUM SHALL INCORPORATE A FILTER HOUSING AND MERV 13

FILTER + 3 SPARES, AND AN ACCESS DOOR FOR MAINTENANCE. DEMO AND REMOVE WOODEN

EQUIPMENT PLATFORM. REMOVE AND REINSTALL AIR HANDLING UNIT AND ASSOCIATED

DUCTWORK,…