This solicitation requests proposals for life safety repairs at multiple Job Corps centers in North Carolina. The solicitation seeks contractors to perform work such as replacing fire alarm systems, repairing water damage, and upgrading emergency lighting. Interested offerors must submit proposals by May 15, 2023. The Forest Service plans to award fixed-price contracts by June 30, 2023 to complete the proposed repairs by September 30, 2023. Small businesses, HUBZone small businesses, service-disabled veteran-owned small businesses, and women-owned small businesses may receive preference in the evaluation process.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PACKAGE 003
LYNDON B. JOHNSON JOB CORPS CENTER
BUILDING 81, MALE DORMITORY WATER DAMAGE RESTORATION
SPECIFICATIONS AND PLANS
MAY 2023
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 1
LYNDON B. JOHNSON JOB CORPS CCC SCOPE OF WORK
LYNDON B. JOHNSON JOB CORPS CENTER
BLDG. 81, WATER DAMAGE RESTORATION
SECTION 010150 SPECIFICATIONS
PART 1 – SUMMARY OF WORK
1.1 DESCRIPTION
A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:
1. Base Item No. 1 – Male Dorm (Bldg 81) Water Damage Restoration.
1.2 LOCATION
A. This project is located at the Lyndon B. Johnson (LBJ) Job Corps Civilian Conservation Center located 8.6 miles from Franklin, NC in Macon County. The address is 3170 Wayah Rd, Franklin, NC 28734. Driving instructions can be obtained from the Center by calling (828) 524-4446.
1.3 WORK HOURS
A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday.
1.4 POINT OF CONTACT
Center Point of Contact: Kent Gibson, (828) 524-1430, james.gibson1@usda.gov.
1.5 USE OF PREMISES
A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-to-day operations.
C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.
Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government.
1.6 WORK RESTRICTIONS
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 2
A. Smoking is permitted on campus only in the designated smoking area.
1.7 SCHEDULE OF ITEMS
A. Schedule of Items:
1. Provide pricing for all items listed in the Schedule of Items.
2. Contract award will be made for all Base Items.
3. Optional Items (if applicable) may or may not be awarded, depending on funding availability.
B. Base Items (BI):
1. Base Item No. 1 – Male Dorm (Bldg 81) Water Damage Restoration.
a. Unit: Lump Sum.
b. JCC Deficiency #’s: NA.
c. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:
1. Repair water damage and weatherize areas in Building 81 (Male
Dorm).
2. Replace water damaged finishes in one wing of the 2-story building as indicated in the drawings, this includes some selective demolition and replacement of finishes that were already removed during initial response and cleanup activities.
3. Replacement, patches, and repairs shall match existing finishes; note that 2 layers of 5/8” type x gypsum board is typical for ceilings.
walls/ceilings.
4. Finishes include, paints, gypsum wall/ceiling board, flooring, trims, mouldings, and wall base.
5. Replace water damaged or already removed cavity insulation from partition walls and ceilings in conjunction with finish patching and replacement, cavity insulation shall be of a depth/thickness that matches cavity framing members and spacing with an uncompressed tight fit.
6. Install pipe insulation on all water pipe (potable and/or sprinkler) in the attic within the area of work, upon installation of pipe insulation, cover with batt, blanket, or blown insulation to a minimum R-30 value – if attic insulation depth over insulated pipes exceeds an R-30 depth, additional batt insulation is not required.
7. Replace water damaged or already removed attic insulation and add insulation as required in undamaged/removed areas within the hatched area of work on the plans to a minimum R-49 value and install baffles between room framing members to maintain a 1” air gap between attic insulation and the roof sheathing. Blend insulation
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 3
depth to adjacent areas outside of hatched area to avoide abrupt depth changes.
8. Reinstall light fixtures, HVAC diffusers, sprinkler heads, and similar devices and appurtenances that were removed or will be removed for replacement and restoration activities.
9. Replace all fire/smoke alarm/detection devices and magnetic door releases within the areas of work.
a. Upon reinstallation test for proper function and provide test report to the Contracting Officer (CO).
b. Re-use of control/power circuit conductors is expected.
10. Replace corridor magnetic door releases and test in the presence of the Project POC.
11. After patching and replacement of wall/ceiling materials occurs. Re-paint all walls and ceilings within the area of work excluding any tiles, devices, escutcheons, laminates, and similar durable finishes not typically painted.
12. Notes:
a. The specific work required for each room or space with the overall areas of work indicated in the drawings varies; some spaces will only require repainting, pipe/attic insulation improvements, and fire/smoke alarm device replacement.
Other areas will require full replacement of ceiling and/or wall and floor finishes in addition to painting, fixture reinstallation, and fire/smoke alarm device replacement
b. Photos included in the drawings are intended to demonstrate the variety of finishes and damage that will require repair or restoration. The intent of this contract is to provide fully finished and functional spaces ready for re-occupancy; the contractor is responsible for accurately measuring and reviewing spaces to ascertain the full extent of the work required for material procurement and installation/repair purposes.
1.8 REQUIREMENTS
A. The building, mechanical, plumbing, and electrical requirements indicated below shall be in conformance with the most recent versions of the International Building Code (IBC), International Mechanical Code (IMC), International Energy Conservation Code (IECC), International Plumbing Code (IPC), the American Society of Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) Standard 90.1 and 62.1, the National Electric Code (NEC), Architectural Barriers Act Standards (ABA, ABAS) and Energy Star qualified. The Contractor shall install products in accordance with all the manufacturer’s written directions and recommendations provided these do not conflict with the
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 4
referenced codes and standards. Utilize low and/or zero VOC products when available and compatible with adjoining materials. All products shall be asbestos and lead free.
B. Basis-of-Design Products: Drawings and/or specifications may indicate “basis-of-design” products, the Contractor may submit alternate products for consideration and approval by the CO. The Contractor shall provide product submittals that demonstrate compliance with any specific salient features that are included with the basis-of-design schedule and/or specification.
C. Action/Approval Submittals:
1. Thermal insulation products.
2. Primer and paint product data.
3. Color charts for the following: paint, flooring, stains, vinyl base.
4. Wall and ceiling material product data.
5. Fire/smoke alarm/detector device product data.
6. Magnetic door release product data.
7. Replacement Flooring product data and mockup.
D. Informational Submittals:
1. Manufacturer’s installation manual for the following:
1) Fire/smoke alarm and detection devices.
2) Magnetic Door Releases.
3) Flooring.
4) Vinyl Base.
5) Primer and Paints.
6) Thermal insulation.
2. Qualifications:
a. NICET Certifications for Fire Alarm Technicians and testers.
b. State Licensure for Electrical Workers.
E. Closeout Submittals:
1. Test report for fire alarm components.
2. Product Warranties where warranty is indicated in product salient features; fully executed and/or registered per manufacturer’s directions including purchase information if required for warranty.
F. Ceiling and Wall Repair/Replacement:
1. For full replacement ceiling/wall finishes.
a. Gypsum Board, Type X.
1) Product Standard: ASTM C1396.
2) Flame Spread: 15 max per ASTM E 84.
3) Smoke Development: 0 per ASTM E 84.
4) Thickness: 5/8” (per layer) .
5) Ceiling shall consist of 2 layers with offset joints.
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 5
6) Accessories: Tapes, compounds, and fasteners per manufacturers instructions for UL Fire Resistant Classification cerification installation requirements.
b. Level 4 finish, 1 coat mold/mildew inhibiting primer, 2 coats zero VOC latex paint.
1) Color: As selected by CO.
2) Sheen:
a) Offices, corridors, and similar spaces: satin.
b) Restrooms and high humidity areas: gloss.
2. For partial surface patching:
a. Match existing and adjoining surfaces in material type, thickness, texture, and color.
G. Wall Moulding and Trim:
1. Window/Door Trim/Misc. Trim: 1x pine boards, ranch style, primed and painted or if other windows/doors in the space have existing trim that will be retained match new trim to existing.
2. Wall base: Vinyl base moulding with compatible adhesives or if existing wall base remains in the same space, match existing.
a. Product Standard: ASTM F1861, Type TV.
b. Group: I (solid, homogenous).
c. Style: Style B, Cove.
d. Minimum Thickness: 0.125”.
e. Height: 6”.
f. Lengths: Cut lengths 48” long or in coils in manufacturer’s standard length.
g. Inside/Outside Corners: Job formed or preformed.
h. Color and Pattern: As selected by CO.
H. Flooring: The contractor shall match the existing flooring that will remain in place. Cut back existing flooring back as required for staggered longitudinal joints or cut straight within door thresholds and provide manufacturer’s standard transition strips. The existing flooring is assumed to be Home Decorators Collection Waterproof Vinyl Plank in Cider Oak. The contractor shall provide a sample to verify exact match or an alternate product that is compatible in dimension, color, and salient feature. If an alternate product is submitted the Contractor shall mockup the transition from existing flooring to new flooring for approval by the CO. If approved, the mockup may be left in place as part of the new flooring installation.
1. Salient features:
a. Waterproof.
b. Click Lock joints.
c. Mark, skid, scratch, and stain resistant.
d. Phthalate Free.
e. Underlayment not required.
f. Low Gloss
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 6
I. Thermal Insulation:
1. All thermal insulation shall be trimmed and fitted to the areas they are installed in accordance with manufacturers’ recommendations. Contractor shall notify CO upon completion of insulation activities for inspection prior to enclosing with finishes. CO may allow/accept Contractor to provide photo documentation of the insulation at the CO’s discretion.
2. Wall/Ceiling Cavity Insulation:
a. Product Standards: ASTM C665 Type I.
b. Basis of Design: Owens Corning Unfaced Pink Next Gen Fiberglas
Insulation.
c. Flame Spread: ≤ 25 per ASTM E84.
d. Smoke Development: ≤ 50 per ASTM E84.
e. Combustibility: ASTM E136 Noncombustible.
f. Formaldehyde free.
g. Thickness/R-Value: Match to cavity framing thickness.
h. Warranty: Manufacturer’s standard limited lifetime warranty against manufacturer defects.
3. Attics:
a. Unfaced Fiberglass, batts, blankets, or rolls.
1) Product Standards: ASTM C665 Type I.
2) Basis of Design: Owens Corning Unfaced Pink Next Gen Fiberglas
Insulation.
3) Flame Spread: ≤ 25 per ASTM E84.
4) Smoke Development: ≤ 50 per ASTM E84.
5) Combustibility: ASTM E136 Noncombustible.
6) Formaldehyde free.
7) Thickness/R-Value: As indicated in plans and specifications.
8) Warranty: Manufacturer’s standard limited lifetime warranty against manufacturer defects.
9) Baffles: Provide pre-formed baffles between roof framing members in areas being insulated adjoining exterior wall/roof intersections to maintain soffit ventilation path and 1” between roof deck and new insulation.
b. Fiberglass or mineral wool, loose-fill, blown.
1) Product Standards: ASTM C764 Type I.
2) Basis of Design: Owens Corning Propink L77 Unbonded Loosefill or
Thermafiber Insul-Fill Blown-In Attic Insulation.
3) Flame Spread: 0 per ASTM E84.
4) Smoke Development: 5 or less per ASTM E84.
5) Combustibility: ASTM E136 Noncombustible.
6) Formaldehyde free.
7) Energy Star: Yes.
8) Thickness/R-Value: As indicated in plans and specifications.
9) Warranty: Manufacturer’s standard limited lifetime warranty against manufacturer defects.
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 7
c. Cellulose, loose-fill blown.
1) Product Standards: ASTM C739, chemically treated for flame-resistance, processing, and handling characteristics.
2) Thickness/R-Value: As indicated in plans and specifications.
3) Smoke Development: 450 or less per CAN/ULC S102.2.
4) CPSC 16 CFR Parts 1209 and 1404 compliant.
d. Baffles: Provide pre-formed baffles between roof framing members in areas being insulated adjoining exterior wall/roof intersections to maintain soffit ventilation path and 1” between roof deck and new insulation.
1) Depth Witness Indicators: For blown insulation, mark attic framing members with permanent marker in black or other contrasting color the insulation depth required prior to installation at a minimum of 2 locations per room in locations visible from the direction of attic accesses.
a) Mark: “R-49” above drawn horizontal level line at required height.
4. Pipe Insulation:
a. ASJ Jacketed Fiberglass.
1) Product Standards: ASTM C547 Type 1 Grade A..
2) Basis of Design: Owens Corning SSL II with ASJ Max Fiberglass.
3) Flame Spread: ≤ 25 per ASTM E84.
4) Smoke Development: ≤ 50 per ASTM E84.
5) Operating Temperature: 0°F (-18°C) to 1,000°F (538°C)
6) Insulation Accessories: ASJ Tape, Fitting/bend covers.
7) Pipe labels (“Hot Water”, “Cold water”, “Sprinkler”), apply to pipe insulation near each side of wall/ceiling penetrations and every 25’ of pipe runs matching type of water supplied.
8) Size: Match to pipe size per manufacturer’s instructions.
9) Insulation R-Value or thickness:
a) Hot/cold in exterior walls, or unheated attics: 1.5”.
J. Fire/Smoke Alarms, Detectors, and Devices and Magnetic Door Releases:
1. The Contractor shall inspect the existing systems and components and provide and install in-kind replacements within the area of work. Replacements shall be compatible with existing systems and shall be bear the same UL, ASTM, and NFPA listings and certifications. Upon completion of the installation, the Contractor shall commission and test the system in accordance with NFPA 3 “Standard for Commissioning of Fire Protection and Life Safety Systems”. Any deficiencies identified during this testing and commissioning associated with the replacement work shall be corrected by the Contractor at no additional expense to the Government. If other deficiencies are noted; not the responsibility of the Contractor, the CO may request a cost proposal for the correction. The Contractor shall not proceed with additional work on cost proposals until the proposal is accepted by the Government in accordance with FAR 52.243 and specific
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 8
subsections incorporated in other sections of this contract. Upon completion of the commissioning and testing, the Contractor shall provide a final report indicating the test results and corrections made. All Fire Alarm work shall be performed by technicians with NICET certifications relevant to the type of work performed.
K. Government Furnished Items:
1. Items indicated in the specifications and drawings for reinstallation are assumed to be in good operable condition. Upon initial mobilization to the project site, the Contractor’s designated representative shall inspect these items and notify the CO in writing they have inspected and taken them into their possession. In the event the Contractor finds physical damage to these items during this initial inspection, they shall notify the CO. The CO shall determine if reinstallation is still desired or will request a proposal for replacement. The Contractor shall be responsible for protection from damage after this inspection and acceptance.
2. All items shall be installed in accordance with specified code and manufacturer requirements.
3. If items are determined to be non-functional not due to visible physical damage; the Contractor shall provide a cost proposal for repair or replacement.
a. Repair or replacement of light fixtures shall be UL listed LED type retrofits or replacements with a color temperature, CRI, and lumen output, and appearance similar to the fixture proposed for replacement.
4. The Contractor shall not proceed with proposals requested in this section until accepted by the Government in accordance with FAR 52.243 and specific subsections incorporated in other sections of this contract.
PART 2 – PROJECT SCHEDULE
5.1 PROJECT SCHEDULE
ITEM* REQUIRED DUE DATE (calendar days)
Pre-Construction Conference
Within 10 days of Award (Virtually)
Notice To Proceed (NTP)
Issued first weekday after Pre-Construction Conference
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 9
Bonds 10 days after NTP
Action and Informational Submittals
10 days after NTP (CORs have 10 calendar days to return)
Closeout Submittals prior to CO acceptance of project
Contract Release form and final pay request
10 days after CO acceptance of project
* All items above must be included in contractor’s construction schedule
PART 3 – SUBMITTAL PROCEDURES
6.1 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Government approval.
B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements.
6.2 PROCEDURES
A. Contractor Responsibilities
1. Review each submittal and check for compliance with the Contract Documents.
2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
3. Include the following information on label or cover sheet for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. Date of Contractor’s approval.
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 10
i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents.
4. The Government will not review submittals that do not bear Contractor's approval and will return them without action.
5. Unless additional copies are required for final submittal, and unless the Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
6. Submittals must be submitted in electronic PDF format. Submit to CO via email or electronic file transfer site.
7. Only final submittals with mark indicating action taken by Government are to be used for construction.
8. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
B. Processing Time: Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Government will review initial submittal within 10 working days.
Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. Resubmittals: If resubmittal is necessary, it will be processed in same timeframe as initial submittal.
6.3 ACTION SUBMITTALS
A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.
B. Collect information into a single submittal for each element of construction and type of product or equipment.
1. Mark up each submittal to show which products and options are applicable.
2. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Required Action Submittals
1. Product Data: See Technical Specification Sections.
6.4 INFORMATIONAL SUBMITTALS
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 11
A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated below:
B. Required Informational Submittals:
1. Accident Prevention Plan.
2. Construction Schedule.
6.5 CLOSEOUT SUBMITTALS
A. Prepare and submit Closeout Submittals, as follows:
1. See Technical Specification Sections.
2. One-Year Warranty on Entire Project as required by FAR 52.246–21.
3. Project Record Documents.
PART 4 – TEMPORARY FACILITIES AND CONTROLS
7.1 USE OF UTILITIES
A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service. The contractor is expected to provide whatever phone service he deems necessary for the duration of the project.
7.2 SANITARY FACILITIES
A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily.
7.3 STAGING AND STORAGE
A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR).
7.4 CONSTRUCTION WASTE DISPOSAL FACILITIES
A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Use of Government waste containers will not be permitted.
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 12
7.5 SAFETY AND ENVIRONMENTAL PROTECTION
A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform personnel, students, and the public of possible hazards.
C. Fire Protection.
1. Store combustible materials in containers in fire-safe locations.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.
3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.
PART 5 – EXECUTION REQUIREMENTS
8.1 EXAMINATION
A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
B. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
C. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
8.2 INSTALLATION
A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction.
B. Make vertical work plumb and make horizontal work level.
C. Install per manufacturer's written instructions and recommendations.
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 13
8.3 PROGRESS CLEANING
A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
8.4 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion.
8.5 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
PART 6 – CLOSEOUT PROCEDURES
9.1 SUBSTANTIAL COMPLETION
A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise the CO of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.
4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities.
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 14
5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.
6. Complete startup testing of systems.
7. Submit changeover information related to Government occupancy, use, operation, and maintenance.
8. Complete final cleaning requirements, including touchup painting.
9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final Completion.
9.2 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 15
9.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
9.4 PROJECT RECORD DOCUMENTS
A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.
B. Provide Draft of Project Record Drawings at Substantial Completion. CO will return reviewed copy. Provide Final Project Record Drawings at Final Completion.
C. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.
1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.
a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.
b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.
2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.
3. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.
4. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets;
bind each set with durable paper cover sheets. Include identification on cover sheets.
9.5 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
MALE DORM – BLDG 81, WATER DAMAGE RESTORATION 010150 – 16
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
2. Remove tools, construction equipment, machinery, and surplus material from Project site.
3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.
Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
D. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 010150
JOB CORPS
NATIONAL OFFICE
BUILDING 81, MALE
DORMITORY WATER
DAMAGE RESTORATION
LYNDON B. JOHNSON
JOB CORPS
CIVILIAN CONSERVATION
CENTER
NANTAHALA
NATIONAL FOREST
2/2023 6
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DATENO. REVISION / ISSUE
COVER SHEET
A.GARRISON, PE
W.KNAACK, PE
T1.0
1. T1.0 COVER SHEET B81
2. G1.0 SITE PLAN B81
3. A1.0 2ND FLOOR RESTORATION PLAN B81
4. A1.1 2ND FLOOR PHOTOS B81
5. A2.0 1ST FLOOR RESTORATION PLAN B81
6. A2.1 1ST FLOOR PHOTOS B81
INDEX
SHEET SHEET
SUB
TITLE OF SHEET
PROJECT ADDRESS
3170 Wayah Rd, Franklin, NC 28734
GOOGLE MAPS (2023), NO SCALE
PROJECT LOCATION
BUILDING
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
BUILDING 81, MALE
DORMITORY WATER DAMAGE
RESTORATION
NANTAHALA
NATIONAL FOREST
LYNDON B. JOHNSON
JOB CORPS CENTER
MACON COUNTY,
NORTH CAROLINA
SOUTHERN REGION
U.S. LOCATION MAP
PROJECT
LOCATION
PROJECT
LOCATION
AutoCAD SHX Text 2/22/23 16:30 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGER COVER.DWG; 16:30 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGER COVER.DWG;16:30 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGER COVER.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGER COVER.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGER COVER.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGER COVER.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGER COVER.DWG;;
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
STAMPS, LOGOS, AND SEALS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
ARCHIVE NO.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text
DATE
L. B. Johnson Civilian Conservation Center Franklin, North Carolina
BUILDING LEGEND
10 - KENNEDY I
12 - KENNEDY II
13 - TRAINING CENTER
14 - KENNEDY III
15 - INDEPENDENT LIVING
16 - JACKSON 4
18 - JACKSON 5
19 - STUDENT SUPPORT SERVICES
22 - GYMNASIUM
23 - DINING HALL
24 - LAUNDRY FACILITY
30 - BUSINESS TECHNOLOGIES
34 - BRICK MASONRY
36 - CSO
46 - ADMINISTRATION
47 - WELLNESS
48 - STORAGE
50 - SUPPLY WAREHOUSE
51 - MAINTENANCE STORAGE/OFFICE
52 - CARPENTRY
53 - FACILITY MAINTENANCE AND CONSTRUCTION
54 - PAINT SHOP
55 - CONCRETE FINISHING
58 - WELDING
62 - DUTY OFFICE
70 - VOCATIONAL OFFICE
71 - HAZMAT STORAGE
81 - MALE DORMITORY
84 - DRY FOOD STORAGE
87 - EDUCATION BUILDING
STRUCTURES
11A-STORAGE
13A-STORAGE
20 - RECREATION STORAGE
21 - RECREATION SHELTER
22A-STORAGE
22B-STORAGE
25 - SUPPLY WATER TREATMENT
26 - GAZEBO
28 - POOL WATER TREATMENT
20 - STORAGE
31 - RESIDENTIAL LIVING STORAGE
32 - SHELTER
33 - GROUND STORAGE
61 - BRICK STORAGE
72 - STORAGE SHED
73 - POLE SHED STORAGE
75 - GAZEBO
76 - GAZEBO
77 - GAZEBO
78 - SHELTER
79 - GAZEBO
82 - SHELTER
85 - GAZEBO
86 - GAZEBO
87A-STORAGE
87B-STORAGE
88 - GAZEBO
89 - GAZEBO
90 - SHELTER
91 - PICNIC SHELTER
30'
BUILDING LEGEND
70 48 73 40'
80'
54 71
58 90
87A 34
20'
10'
87 87B 88
100'
16 18
70' 85
80'
90'
22B
22A
7680'
80'
70'
80' 70'
SEMAPHORE GATE
13A
WAYAH CREEK
80'
FOOTBALL/SOCCER
FIELD
TRACK
11A
70'
79 13
Existing Site Plan 100 200 400 Feet
WAYAH ROAD
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DATENO. REVISION / ISSUE
SITE PLAN
A.GARRISON, PE
W. KNAACK, PE
G1.0
JOB CORPS
NATIONAL OFFICE
BUILDING 81, MALE
DORM WATER DAMAGE
RESTORATION
LYNDON B. JOHNSON
JOB CORPS
CIVILIAN CONSERVATION
CENTER
NANTAHALA NATIONAL FOREST
11/2022 6
SHADING DENOTES BUILDINGS
INCLUDED IN THIS CONTRACT
AutoCAD SHX Text 2/22/23 16:27 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG; 16:27 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;16:27 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;;
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
STAMPS, LOGOS, AND SEALS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
ARCHIVE NO.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
J
DN
DN
MW
SECOND FLOOR
MECH/ELEC
DORMITORY ROOM
(TYPICAL)
DORMITORY ROOM
(TYPICAL)
LAUNDRY
SST ROOM
COUNSELING
OFFICE
R.A.
LUGGAGE ROOM
PLUMBING ROOM
J
DAY ROOM
DN
ST.
ST.
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DATENO. REVISION / ISSUE
2ND FLOOR
RESTORATION PLAN
A.GARRISON, PE
W. KNAACK, PE
A1.0
JOB CORPS
NATIONAL OFFICE
BUILDING 81, MALE
DORM WATER DAMAGE
RESTORATION
LYNDON B. JOHNSON
JOB CORPS
CIVILIAN CONSERVATION
CENTER
NANTAHALA NATIONAL FOREST
2/2023 6
WATER DAMAGED CORRIDOR
NO SCALE
PH1
A1.0
NOTES:
1. DIMENSIONS, SCALES, AND PHOTOS ARE FOR GENERAL PROJECT SCOPING ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACCURATELY MEASURING
AND REVIEWING SPACES TO ASCERTAIN THE FULL EXTEND OF THE WORK REQUIRED AND FOR MATERIAL PROCUREMENT AND INSTALLATION PURPOSES.
2. THE CONTRACTOR SHALL REMOVE AND RE-INSTALL LIGHT FIXTURES, DEVICE BOXES, ALARMS, SUPPLY/RETURN/EXHAUST LOUVERS, AND SIMILAR ITEMS NOT
DESIGNATED FOR REMOVAL OR REPLACEMENT AS REQUIRED FOR REPLACEMENT OF FRAMING AND FINISHES.
3. SPECIFIC WORK REQUIRED IN EACH WORK VARIES DUE TO VARIATION IN THE EXTENT OF WATER DAMAGE AND SELECTIVE DEMOLITION THAT WAS
PERFORMED DURING POST DAMAGE RESTORATION EFFORTS. THE DRAWINGS INDICATE LOCATIONS OF DAMAGE AND MAJOR WORK ITEMS FOR THOSE SPACES, BUT INCIDENTAL REPAIR, PATCHING, OR REPLACEMENT OF FINISHES AND INSULATION WILL BE REQUIRED FOR AREAS OF BUILDINGS THAT BORDER OR ADJOIN SPACES DESCRIBED IN THE DRAWINGS. REPAIR WORK SHALL MATCH EXISTING FINISHES UNLESS MODIFIED IN SPECIFICATION OR DRAWING
SCHEDULES AND SHALL PERFORM AS FULLY FINISHED SPACES READY FOR OCCUPANCY.
PH1
A1.0
KEY NOTES
WITHIN HATCHED AREA THE CONTRACTOR SHALL:
1. REPLACE AND PATCH DAMAGED FINISHES.
1.1. FINISH(ES) INCLUDES: PAINTS, GYPSUM WALL/CEILING BOARD, VINYL PLANK FLOORING, TRIMS AND MOULDINGS, WALL BASE TRIMS.
2. THE CONTRACTOR SHALL INSULATE ALL WATER LINES IN THE ATTIC SPACE. THE INSULATION SHALL CONSIST OF FIBERGLASS PIPE INSULATION
1.5" THICK WITH ASJ JACKET WHICH IS THEN COVERED WITH R-30 BATT INSULATION, WHERE WATERLINES ARE COVERED BY ATTIC INSULATION THE ATTIC INSULATION CAN BE COUNTED TOWARD THE R-30 COVERING (SEE ATTIC/PIPE INSULATION DETAIL BELOW). PIPE INSULATION SHALL BE SELECTED AND INSTALLED IN ACCORDANCE WITH INSULATION MANUFACTURES SIZE TABLE AND INSTALLATION INSTRUCTIONS.
3. THE CONTRACTOR SHALL INSULATE THE ATTIC SPACES WHERE INSULATION WAS REMOVED AND ADD INSULATION IN THE HATCHED AREA WHERE IT IS STILL PRESENT TO PROVIDE A MINIMUM R-VALUE OF R-49, INSTALL BAFFLES BETWEEN ROOF TRUSSES TO MAINTAIN A 1" AIR GAP
BETWEEN THE ROOF DECK AND NEW INSULATION.
4. REPLACE MISSING FINISHES - NOTE THAT 2 LAYERS OF 58" TYPE X GYPSUM BOARD IS TYPICAL FOR WALL /CEILING.
5. REPLACE INSULATION IN PARTITION WALLS WHERE IT WAS REMOVED.
6. RE-INSTALL LIGHT FIXTURES, HVAC DIFFUSERS AND SIMILAR DEVICES.
7. REPLACE ALL FIRE ALARM AND SMOKE DETECTION DEVICES; CONTROL AND ELECTRICAL WIRE IS INTENDED FOR RE-USE.
8. REPLACE CORRIDOR MAGNETIC DOOR RELEASE.
9. REPAINT ALL WALLS AND CEILINGS WITHIN THE CENTRAL CORRIDOR AND DORM ROOMS.
10.UPON COMPLETION OF THE RE-INSTALLATION WORK; THE CONTRACTOR SHALL TEST ALL FIRE ALARM (FA) SYSTEM COMPONENTS WITHIN THE
WORK AREA AND PROVIDE A REPORT OF FINDINGS TO THE CO WITH AN ITEMIZED COST PROPOSAL FOR REPAIR AND/OR REPLACEMENT OF ANY ITEMS FOUND TO BE INOPERABLE; FA ITEMS INCLUDE DETECTORS, ALARMS, AND MAGNETIC DOOR HOLD OPEN/RELEASES.
ADDITIONAL NOTES:
1. RESTORATION WORK VARIES BY ROOM, SOME AREAS WILL REQUIRE ONLY MINOR PATCHING, REPAINTING, AND INSULATION WORK. OTHERS
WILL REQUIRE INSTALLATION OF FULL CEILING AND FLOOR FINISHES. THE INTENT OF THIS CONTRACT IS TO PROVIDE FULLY FINISHED SPACES READY FOR RE-OCCUPANCY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE FULL EXTENT OF LABOR, MATERIALS, AND
INCIDENTALS REQUIRED TO FULLY RESTORE THESE SPACES.
2. PATCHED FINISHES SHALL MATCH EXISTING FINISHES.
3. NEW FINISHES SHALL MATCH EXISTING FINISHES IN OTHER ROOMS/AREAS UNLESS MODIFIED BY THIS DRAWING OR CONTRACT
SPECIFICATIONS.
4. VINYL PLANK FLOORING IN THE DORM TO BE MATCHED IS ASSUMED TO BE HOME DECORATORS COLLECTION WATERPROOF LUXURY VINYL
PLANK - CIDER OAK. CONTRACTOR SHALL PROVIDE SAMPLE TO CO APPROVAL OF COLOR AND DIMENSION MATCH PRIOR TO ACQUISITION OF
NEW REPLACEMENT FLOORING.
ITEMS STOCKPILED FOR RE-INSTALLATION
NO SCALE, NO LOCATION DESIGNATION
PH2
A1.0
FIRE ALARM DETECTOR BASE (TYPICAL)
NO SCALE, NO LOCATION DESIGNATION
PH3
A1.0
R-49 MIN. R-30 MIN.
R-30 MIN.
INSULATED
WATER
PIPEATTIC
INSULATION
FRAMING
R-30
BATT
BUILDING INFORMATION
1. OCCUPANCY: RESIDENTIAL GROUP, R-2
2. GSF: 26,520 SF
3. FLOORS: 2
4. CONSTRUCTION TYPE: 3
A A1.0
BUILDING 81- MALE DORMITORY 2ND FLOOR PLAN
1/16"=1'
B A1.0
ATTIC/PIPE INSULATION DETAILS
NO SCALE
16 0 16 32
SCALE OF FEET
AutoCAD SHX Text 2/22/23 16:27 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG; 16:27 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;16:27 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;;
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
STAMPS, LOGOS, AND SEALS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
ARCHIVE NO.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
DN
J
ST.
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DATENO. REVISION / ISSUE
2ND FLOOR PHOTOS
A.GARRISON, PE
W. KNAACK, PE
A1.1
JOB CORPS
NATIONAL OFFICE
BUILDING 81, MALE
DORM WATER DAMAGE
RESTORATION
LYNDON B. JOHNSON
JOB CORPS
CIVILIAN CONSERVATION
CENTER
NANTAHALA NATIONAL FOREST
2/2023 6
NOTES:
1. DIMENSIONS, SCALES, AND PHOTOS ARE FOR GENERAL PROJECT SCOPING ONLY. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ACCURATELY MEASURING AND REVIEWING SPACES TO ASCERTAIN THE FULL EXTEND OF THE WORK
REQUIRED AND FOR MATERIAL PROCUREMENT AND INSTALLATION PURPOSES.
2. THE CONTRACTOR SHALL REMOVE AND RE-INSTALL LIGHT FIXTURES, DEVICE BOXES, ALARMS, SUPPLY/RETURN/EXHAUST LOUVERS, AND SIMILAR ITEMS NOT DESIGNATED FOR REMOVAL OR REPLACEMENT AS REQUIRED FOR REPLACEMENT OF
FRAMING AND FINISHES.
3. SPECIFIC WORK REQUIRED IN EACH WORK VARIES DUE TO VARIATION IN THE EXTENT OF WATER DAMAGE AND SELECTIVE DEMOLITION THAT WAS PERFORMED DURING POST DAMAGE RESTORATION EFFORTS. THE DRAWINGS INDICATE LOCATIONS OF DAMAGE AND MAJOR WORK ITEMS FOR THOSE SPACES, BUT INCIDENTAL REPAIR, PATCHING, OR REPLACEMENT OF FINISHES AND INSULATION WILL BE REQUIRED FOR AREAS OF BUILDINGS THAT BORDER OR ADJOIN SPACES DESCRIBED IN THE DRAWINGS. REPAIR WORK SHALL MATCH EXISTING FINISHES UNLESS MODIFIED IN SPECIFICATION OR DRAWING SCHEDULES AND SHALL PERFORM AS FULLY FINISHED SPACES READY FOR OCCUPANCY.
PH1
A1.1
CORRIDOR FLOORING/CEILING/WALLS
NO SCALE
PH1
A1.1
DORM ROOM FLOOR/WALL BASE
NO SCALE
PH3
A1.1
DORM ROOM WALL BASE & FLOORING
NO SCALE
PH5
A1.1
DORM ROOM CEILING
NO SCALE
PH2
A1.1
DORM ROOM WALL BASE, FLOOR, CEILING
NO SCALE
PH4
A1.1
DORM ROOM FLOOR/WALL BASE
NO SCALE, NO DRAWING LOCATION
PH6
A1.1
PH4
A1.1
PH5
A1.1
PH5
A1.1
PH2
A1.1
4 0 4 128
SCALE OF FEET
A A1.1
BUILDING 81, MALE DORMITORY 2ND FLOOR PHOTOS
NO SCALE
AutoCAD SHX Text 2/22/23 16:27 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG; 16:27 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;16:27 AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG; AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;AGARRISON C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG; C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;C:\USERS\AGARRISON\BOX\JCENG_PROJECTS\LBJ\B81_MALEDORM\2023 LBH BLDG 81 WATER DAMAGE\DWGS\LBJ JCC 2023 B81 WATDAMAGE DWG.DWG;;
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESIGNER
AutoCAD SHX Text
STAMPS, LOGOS, AND SEALS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
ARCHIVE NO.
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
UP
MW
J
MECH/ELEC
UP
UP
ELEV
UP
UP
ELEVATOR MACHINE ROOM
DORMITORY ROOM
(TYPICAL)
DORMITORY ROOM
(TYPICAL)
LAUNDRY
SST ROOM
COUNSELING
OFFICE
R.A.
LUGGAGE ROOM
PLUMBING ROOM
FIRST FLOOR
DAY ROOM
UNITED STATES
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
DATENO. REVISION / ISSUE
1ST FLOOR
RESTORATION PLAN
A.GARRISON, PE
W. KNAACK, PE
A2.0
JOB CORPS
NATIONAL OFFICE
BUILDING 81, MALE
DORM WATER DAMAGE
RESTORATION
LYNDON B. JOHNSON
JOB CORPS
CIVILIAN CONSERVATION
CENTER
NANTAHALA NATIONAL FOREST
2/2023 6
WATER DAMAGED CORRIDOR
NO SCALE
PH1
A2.0
NOTES:
1. DIMENSIONS, SCALES, AND PHOTOS ARE FOR GENERAL PROJECT SCOPING ONLY. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ACCURATELY MEASURING AND REVIEWING SPACES TO ASCERTAIN THE FULL EXTEND OF THE WORK
REQUIRED AND FOR MATERIAL PROCUREMENT AND INSTALLATION PURPOSES.
2. THE CONTRACTOR SHALL REMOVE AND RE-INSTALL LIGHT FIXTURES, DEVICE BOXES, ALARMS, SUPPLY/RETURN/EXHAUST LOUVERS, AND SIMILAR ITEMS NOT DESIGNATED FOR REMOVAL OR REPLACEMENT AS REQUIRED FOR REPLACEMENT OF
FRAMING AND FINISHES.
3. SPECIFIC WORK REQUIRED IN EACH WORK VARIES DUE TO VARIATION IN THE EXTENT OF WATER DAMAGE AND SELECTIVE DEMOLITION THAT WAS PERFORMED DURING POST DAMAGE RESTORATION EFFORTS. THE DRAWINGS INDICATE LOCATIONS OF DAMAGE AND MAJOR WORK ITEMS FOR THOSE SPACES, BUT INCIDENTAL REPAIR, PATCHING, OR REPLACEMENT OF FINISHES AND INSULATION WILL BE REQUIRED FOR AREAS OF BUILDINGS THAT BORDER OR ADJOIN SPACES DESCRIBED IN THE DRAWINGS. REPAIR WORK SHALL MATCH EXISTING FINISHES UNLESS MODIFIED IN SPECIFICATION OR DRAWING SCHEDULES AND SHALL PERFORM AS FULLY FINISHED SPACES READY FOR OCCUPANCY.
PH1
A2.0
KEY NOTES
WITHIN HATCHED AREA THE CONTRACTOR SHALL:
1. REPLACE AND PATCH DAMAGED FINISHES.
1.1. FINISH(ES) INCLUDES: PAINTS, GYPSUM WALL/CEILING BOARD, VINYL PLANK FLOORING AND TRANSITIONS, TRIMS AND MOULDINGS, WALL
BASE TRIMS.
2. REPLACE…