This is a Tinker Air Force Base Outage Request Form template used to document and process service interruptions for utility and facility systems at the base.

The form establishes three classification categories for outages: Planned (Routine) outages, which must be submitted 60 calendar days in advance for roads/parking lots/sidewalks, 21 calendar days for utilities, and 10 calendar days for fire alarm testing; Limited Notice (Urgent) outages requiring 21 calendar days notice for roads/parking/sidewalks, 10 calendar days for utilities, and 7 calendar days for fire alarm testing; and Emergency outages that must be accomplished immediately to protect property or occupant health, submitted with less notice than Urgent timelines and requiring a completed form explaining the emergency circumstances. The form captures project information including project number, name, location, outage start/end dates and times, and description of work. Requesters must identify the type of outage or closure (Fire Suppression, Gas, Steam, Breathing Air, Sidewalk, Fire Alarm Outage, Fire Alarm Testing, Domestic Water, Chilled Water, Road, Electric, HVAC, Compressed Air, Parking Lot, or Gate(s)) and specify required operational support from shops including Plumbing, Electrical, HVAC, Alarms/Sprinkler, OG&E, Fire Department, Plant Maintenance, and Honeywell. The form requires contact information for the requestor and TAFB Contract Point of Contact (Inspector/PM/COR), with submissions directed to the Utility Outage Coordination Team at the provided email address. Routine or Urgent requests received after 1 p.m. will be processed the next business day, while emergency requests outside normal working hours (0700-1600 M-F) should call Customer Service Desk at 734-3117.

View the file

Other files

File Type Posted
Solicitation - FA813727R0002.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
250063_ATT 3_RMDF.pdf PDF
23 05 15.pdf PDF
23 09 13.pdf PDF
09 90 00.pdf PDF
26 20 00.pdf PDF
08 51 23.pdf PDF
07 92 00.pdf PDF
07 14 00.pdf PDF
08 71 00.pdf PDF
23 05 93.pdf PDF
07 84 00.pdf PDF
03 01 00.pdf PDF
05 05 23.16.pdf PDF
00 70 00.pdf PDF
01 78 23.pdf PDF
UMRL.pdf PDF
ERDCITL_TR12-1_r2.pdf PDF
ERDCITL_TR12-6_r6.pdf PDF
tinkerafb_INRMP.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
dafman91-203.pdf PDF
dafi91-202.pdf PDF
dafi13-213.pdf PDF
afman40-201.pdf PDF
afman48-148.pdf PDF
tinkerafb_INRMP_App E.pdf PDF
tinkerafbi21-100.pdf PDF
007100_Attch1_Airfield Construction Waiver.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
250063_ATT 11_Drawings.pdf PDF
DESV_Submittal.pdf PDF
z415-bz1.pdf PDF
4500-S.pdf PDF
4500-CIVIL.pdf PDF
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
250063_ATT 8_Liquidated Damages.pdf PDF
250063_ATT 4_ODS.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
250063_ATT 10_Submittal Register.pdf PDF
23 00 00.pdf PDF
08 11 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
10 44 16.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

All outages and service interruptions will be classified in one of three possible categories:

a. Planned (Routine) – An interruption in parking or utility services, which can be foreseen well in advance and/or is part of an existing schedule. Planned outages include all repair projects, with enough lead time to allow them to be accomplished on a non-emergency basis, and all capital and renovation projects which require outages during construction. Planned outages should be submitted to the Outage Coordinator prior to the requested outage using the following timelines:

• Roads/Parking Lots/Sidewalks – 60 calendar days

• Utilities (all) – 21 calendar days

• Fire Alarm Testing – 10 calendar days

b. Limited Notice (Urgent) – An interruption in parking or utility services that cannot reasonably be foreseen in advance to be considered a “routine” outage or which does not allow for extensive pre-planning or coordination prior to the interruption. A Limited Notice Outage may be required when repairs must be accomplished within a short time frame (which may not allow time for BCE to notify or meet with stakeholders) to safeguard property and occupant health.

Limited Notice or Urgent outages should be submitted to the Outage Coordinator prior to the requested outage using the following timelines:

• Roads/Parking Lots/Sidewalks – 21 calendar days

• Utilities (all) – 10 calendar days

• Fire Alarm Testing – 7 calendar days

c. Emergency Outage – An interruption in parking or utility services that must be accomplished immediately to safeguard property or occupant health. This may occur as the result of a natural or human-caused hazard. Examples of emergency outages may include, but are not limited to:

mechanical failure, flooding within buildings, water line breaks, electrical outages or “power blips”, or hazardous materials incidents. Outages requests are considered an Emergency Request if they are submitted to the Outage Coordinator in a time frame that is less than the Urgent timelines noted above. Emergency requests must still be supported with an outage request form explaining the situation and reason that the outage cannot be accomplished as a Routine or Urgent Outage. Emergency Requests outside of normal working hours (0700-1600 M-F) should call the Customer Service Desk at 734-3117 for immediate assistance.

Form - Outage Request
Vance Gate Outage Request Form.pdf
Other or Remarks:
Gates specify which:
Primary_2:
Type1: Off
Type2: Off
Type3: Off
Reason:
Work Order #:
Project #:
Description of Work to be Performed:
Other Operational Support Required:
Impact of Outage:
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Road_2: Vance Gate
Project Name:
Exact Location Bldg Post intersection etc:
Outage Start Date:
Outage End Date:
Outage StartTime:
Outage End Ti me:
Primary:
Position:
Phone:
Email:
Alternate:
Position_2:
Phone_2:
Email_2:
TAFB Contract Point of Contact lnspectorPMCOR: Darren Hulsey
Position_3:
Phone_3:
Email_3:
Alternate_2:
Position_4:
Phone_4:
Email_4:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Text19:
Text20:
Text21:
Text22: Preventive Maintenance on mechanical and electronic controls
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Yes
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Text32:
Text33: This gate is only open mornings and evenings. Mid day work will not impact traffic

File details come from the government source that posted it. Updated .