007100_Attch1_Airfield Construction Waiver.pdf

PDF 192 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813727R0002
Issued by

About this file

This is an Airfield Construction Waiver Application Form used by the U.S. Air Force to request temporary waivers from airfield construction standards outlined in UFC 3-260-01. The form is completed by requesters to document construction projects that deviate from established airfield criteria and obtain necessary approvals.

Requesters must complete blocks 1, 2, and 4-6, 8, 10, and 11, with N/A entries for non-applicable sections. Key information required includes the project or work order number, contract number, detailed description of construction activities with specific location mapping, facility number closest to the construction site, and the specific criteria being waived with corresponding UFC references. Block 8 requires precise location and height data, including construction activity ground elevation (average mean sea level), tallest construction equipment height, and total combined height in feet. Block 9 requires justification for the temporary waiver. Block 10 demands point of contact information for the CEC project manager and contractor executing the work, along with construction start and end dates. Block 11 requires detailed risk mitigation measures for each violation or waiver, such as special painting, obstruction lighting, barricades, marshalling, flagging, and safety plan procedures.

Block 12 designates government coordination responsibilities across multiple Air Force offices including Airfield Manager, Airfield Operations, TERPS, Flight Safety, Ground Safety, Logistics, Communications, and Security Forces. Final approval authority resides with the Installation Commander, or in emergency situations, the Base Civil Engineer per UFC 3-260-01, B1-2.5.4.7. The form is dated April 2018.

View the file

Other files

File Type Posted
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
250063_ATT 8_Liquidated Damages.pdf PDF
250063_ATT 4_ODS.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
250063_ATT 10_Submittal Register.pdf PDF
23 00 00.pdf PDF
08 11 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 71 00.pdf PDF
01 33 00.pdf PDF
01 50 00.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
ufc_3_601_02_2021.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
afman91-203_oc-alcsup.pdf PDF
afi48-104.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
007200_Attch7b_Monthly Hazardous Usage Report.pdf PDF
007200_Attch9_EMS Awareness Training.pdf PDF
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
250063_ Redline A-502.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
lrad331965pd_spec.pdf PDF
ELECTRICAL COMBINED.pdf PDF
4500-MUG.pdf PDF
220042 As Built Drawings.pdf PDF
Solicitation - FA813727R0002.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
250063_ATT 3_RMDF.pdf PDF
23 05 15.pdf PDF
23 09 13.pdf PDF
09 90 00.pdf PDF
26 20 00.pdf PDF
08 51 23.pdf PDF
07 92 00.pdf PDF
07 14 00.pdf PDF
08 71 00.pdf PDF
23 05 93.pdf PDF
07 84 00.pdf PDF
03 01 00.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS: Requester MUST complete blocks 1, 2, 4-6, 8,10,11, if not applicable put N/A in the block.

4.

5.

6.

7.

8.

9.

10.

Phone & Email:CEC (THDR, Alutiq,etc.) Project Manager:

Phone & Email:

Construction End Date:

11.

12.

LOGISTICS

COMMUNICATIONS

Installation Commander approval authority. If waiver is an emergency the Base Civil Engineer may approve according to UFC 3-260-01, B1-2.5.4.7.

72 OSS/OSAM

72 OSS/OSA

HQ AFMC/A3

72 ABW/SEF

72 ABW/SEG

72 LRS/DD

72 CS/SCX

AIRFIELD OPERATIONS

TERPS

FLIGHT SAFETY

GROUND SAFETY

Describe risk mitigation measures that will be taken for each violation/waiver. (eg. Special painting, obstruction lighting, barricades, marshallers, flagging, safety plan/recall procedures, etc.)

AIRFIELD MANAGER

COORDINATION COMPLETED (Government Civil Engineering Use Only):

Point of Contact Data:

AIRFIELD CONSTRUCTION WAIVER APPLICATION FORM

N

CRITERIA TO BE WAIVED (Government Use Only- State Chapter, paragraph, table number, etc. from UFC 3-260-01 or other):

Include a map with a detailed depiction of the construction location and submit with this form.

Description of Construction Activity: Include description of construction with notes pertaining to the work that will be done.

Location and Height Data of Construction Activity:

SECURITY FORCES 72 SFS/S5S

Why is the temporary waiver required?

h of construction.

Facility Number (Closest to Construction Activity):

Form Date: April 2018

13. APPROVAL (Government Use Only)

Installation Commander

Contractor (Executing the work):

Construction Start Date:

1. Project or Work Order # 2. Contract # 3.Waiver # (Government Use Only)

Longitude:

Latitude: W

A) Construction Activity Ground Elevation (Average Mean Sea Level):

B) Tallest Construction Equipment Height (Crane Height, etc):

Ft.

Ft.

Total Height (A+B): Ft.

(Base Civil Engineer if Emergency)

1405266233C Highlight

Text5:
Text9:
Text8:
Text10:
Text11:
Text12:
Text13:
Text14:
Text15:
Text16:
Text17:
Text18:
Text19:
Text20:
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Text31:
Text32:
Contract #:
Project or Work Order #:
Text1:

File details come from the government source that posted it. Updated .