001a Att1 - General Plan-map of work area.pdf

PDF 2 MB Posted

Attached to
S208--Snow Removal Services TOGUS MAINE 402-26-1-4808-0031
Solicitation number
36C24126Q0132
Issued by

About this file

This document is a set of architectural floor plans for the Department of Veterans Affairs Medical & Regional Office Center located in Togus, Maine. The plans include multiple building layouts (Buildings 200-239) showing first, second, and sometimes basement floor configurations across various structures. Key features include detailed room layouts, stairwell locations, and annotations for specific areas such as offices, exam rooms, corridors, and technical spaces. The drawings are technical blueprint-style diagrams with precise measurements and floor numbering, indicating a comprehensive facility mapping for a Veterans Affairs medical complex.

The floor plans reveal a complex with multiple interconnected buildings, each with unique architectural designs and multiple floor levels. Specific areas highlighted include stairs, O2 tanks, courtyards, accessible walkways, and various specialized rooms like exam rooms, offices, patient rooms, and administrative spaces. The plans appear to be part of a comprehensive facility design document, with consistent VA branding and date stamps ranging from 1997 to 2012, suggesting these are part of a phased construction or renovation project for the Togus, Maine VA Medical Center.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

O2 tank Stair

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

Courtyard

Line

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Rectangle

VHATOGAINSWK

Rectangle

Rectangle

VHATOGAINSWK

Oval

VHATOGAINSWK

Rectangle

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

-C

O R

205-1BLDG. & FLOOR #:

20 15 10 5 0 20 40

116A 116

118A

118 116B

107B

112A

124A 134A 126 134 132

B

124C

130 173

8/15/13 MPM

107F

SILLHT

SI

LL

H T

SILLHT

SILLH

T

SI

LL

H T

124D

107B 107A

124E

112B

107C

107K

107I

104 100

100A

172104A

C

103B 103E

103C 103D 123A

109105

129 131 143A

131A 143 145

141139137135 149A

145A

103A

127A 127B

123B MedSafe

107J

107D

107I 107H 107G

107E

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

PIPE CHASE

WOMENS

TOILET

PIPE CHASE

ELECTRICAL

STORAGE

NOURISHMENT

KITCHENTELECOM

STORAGE

STORAGE

STORAGE

CORRIDOR

CORRIDOR

OFFICE GROUP RM

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

FILE RMOFFICE

OFFICE

OFFICE

MENS

TOILET

GROUP RM

CORRIDOR

OFFICE

OFFICE

CORRIDOR

ELEVATOR

ELEVATOR

OFFICE

OFFICE

FILE RM

OFFICE

STAIROFFICE

OFFICE

OFFICE

OFFICE

STORAGE

OFFICE

OFFICE

CORRIDOR

OFFICE

OFFICE

OFFICE

PSYCHOLOGY

INTERN OFFICE

PSYCHOLOGY

TRAINING DIRECTOR

OFFICE

OFFICE

CORRIDOR

WAITING RM

RECEPTION

OFFICE

OFFICE

OFFICE

OFFICE

SOCIAL WORKER

OFFICE

PSYCHIATRIST

OFFICE

PSYCHIATRIST

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

HAC

OFFICE

OFFICE

STAIR

GROUP RM

BREAK RM

EXAM

STAIR

ELECTRICAL

OFFICE

STORAGE

OFFICE

UNISEX

TOILET

MEETING RM

OFFICE

TELEHEALTH

OFFICE

OFFICEOFFICE

SOCIAL WORKER

OFFICE

DIRTY LINEN

TRASH

SHOP STORAGE

ELECTRICAL

CORRIDOR

OFFICE

STAFF RM

OFFICE

TELEPHONE

OFFICE OFFICE

COPIER

ROOM

OFFICE

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

STORAGE

TELECOM

OXYGEN STORAGE

SOILED

UTILITY

MED RM

TOILET

TOILET

EMS

STORAGE

TELECOM

STORAGE

PATIENT RM

STAIR

STAIR

CORRIDOR

CORRIDOR

HOUSE

KEEPING

CONFERENCE RM

CHIEF OF

GERIATRICS

EXTENDED CARE

OFFICE

HBPC ADMIN

OFFICE

OFFICE

OFFICE

BREAK RM

MENS TOILET

WOMENS

TOILET CORRIDOR

STAIR

GERIATRIC

OUT PATIENT

CLINIC

MAIN

ELECTRICAL

EXAM RM

EXAM RM

EXAM RM

EXAM RM

EXAM RM

MED

DIRECTOR

OFFICE

CORRIDOR

PATIENT RM

CONFERENCE RM

DINING

OFFICE

RN OFFICE

ELEVATOR

ELEVATOR

CONSULT

SPD

STORAGE

TOILET

PATIENT RM

TOILET TOILET

PATIENT RM

TOILET

PATIENT RM

TOILET

TOILET

PATIENT RMSHOWER RM

TOILET

PATIENT RM

PATIENT RM

TOILETTOILET

PATIENT RM

PATIENT RMTOILET

CLEAN

UTILITY

CHAPEL

HAC

OFFICE

COPY RM

OFFICE

OFFICE

OFFICE

HOME BASED

PRIMARY CARE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICEOFFICE

TOILET

RECREATION

STORAGE

CORRIDOR

OFFICE

CONFERENCE RM

EXAM

OFFICE

OFFICE

CLOSET OFFICE

NURSE

STATION

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Rectangle

VHATOGAINSWK

Rectangle

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Rectangle

VHATOGAINSWK

Rectangle

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

EXISTING

BUILDING 206

C

EXISTING

BUILDING 207

WATERLINE

CONNECTION

POINT

STEP IN SIDEWALK

FUTURE

EXPANSION

FUTURE

EXPANSION

CONSTRUCTION

STAGING AREA

2,500 SF

EXISTING

BUILDING 208

BUILDING 258

F1 CIVIL SITE AND TRAFFIC PLAN

1"=20'

020' 20 4010

1. ALL WORK DETAILED ON THESE PLANS AND PERFORMED UNDER THIS CONTRACT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND THE GEOTECHNICAL REPORT. WHERE APPLICABLE, CITY OF AUGUSTA, MUNICIPAL CODE SHALL APPLY.

2. THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS, RULES AND REGULATIONS WHICH APPLY TO THE CONSTRUCTION OF THESE IMPROVEMENTS, INCLUDING EPA REGULATIONS WITH RESPECT TO STORM WATER DISCHARGE.

3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL POTENTIAL OBSTRUCTIONS INCLUDING ALL UNDERGROUND UTILITIES. THE CONTRACTOR'S SURVEYOR SHALL DOCUMENT THE HORIZONTAL LOCATION AND ELEVATION OF UTILITIES THAT ARE EXPOSED. SHOULD A CONFLICT EXIST, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OR ENGINEER SO THE CONFLICT CAN BE RESOLVED WITH A MINIMUM AMOUNT OF DELAY.

CONTRACTOR SHALL COMPLETE AND SUBMIT VA DIG PERMIT FOR VA APPROVAL PRIOR TO ANY GROUND PENETRATIONS, EXCAVATIONS, AND BORINGS. CONTRACTOR SHALL INCLUDE UNDERGROUND UTILITY INVESTIGATION REPORT WITH VA PERMIT. COORDINATE WITH VA

COR.

4. ALL ELECTRICAL, TELEPHONE, CABLE TV, GAS AND OTHER UTILITY LINES, CABLES, AND APPURTENANCES ENCOUNTERED DURING CONSTRUCTION THAT REQUIRE RELOCATION, SHALL BE COORDINATED WITH THE COR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL NECESSARY UTILITY ADJUSTMENTS. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR DELAYS OR INCONVENIENCES CAUSED BY UTILITY COMPANY WORK CREWS. THE CONTRACTOR MAY BE REQUIRED TO RESCHEDULE HIS ACTIVITIES TO

ALLOW UTILITY CREWS TO PERFORM THEIR REQUIRED WORK.

5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING UTILITY LINES WITHIN THE CONSTRUCTION AREA. ANY DAMAGE TO EXISTING FACILITIES CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE AND

APPROVED BY THE VA COR.

6. CONSTRUCTION ACTIVITY SHALL BE LIMITED TO THE PROPERTY AND/OR PROJECT LIMITS. ANY DAMAGE TO ADJACENT PROPERTIES RESULTING FROM CONSTRUCTION PROCESS SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.

7. THE CONTRACTOR SHALL NOT STORE EQUIPMENT OR MATERIAL OUTSIDE THE CONSTRUCTION LIMITS WITHOUT THE PERMISSION OF THE

VA.

8. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED BY THE VA AND THE LOCAL, STATE, AND FEDERAL AGENCIES PRIOR TO COMMENCING CONSTRUCTION. THIS INCLUDES BUT IS NOT LIMITED TO VA DIG PERMITS, EPA STORM WATER PERMIT, ETC.

9. ALL PROPERTY CORNERS DESTROYED DURING CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. ALL PROPERTY

CORNERS MUST BE RESET BY A REGISTERED LAND SURVEYOR.

10. THE CONTRACTOR SHALL PREPARE A CONSTRUCTION TRAFFIC CONTROL AND SIGNING PLAN AND OBTAIN APPROVAL OF SUCH PLAN FROM THE CONTRACT OFFICER'S REPRESENTATIVE (COR), PRIOR TO BEGINNING ANY CONSTRUCTION WORK ON OR ADJACENT TO

EXISTING STREETS.

11. ALL BARRICADES AND CONSTRUCTION SIGNING SHALL CONFORM TO APPLICABLE SECTIONS OF THE "MANUAL ON UNIFORM TRAFFIC

CONTROL DEVICES" (MUTCD), US DEPARTMENT OF TRANSPORTATION, LATEST EDITION.

12. THE CONTRACTOR SHALL MAINTAIN ALL CONSTRUCTION BARRICADES AND SIGNING AT ALL TIMES. THE CONTRACTOR SHALL VERIFY

THE PROPER LOCATION OF ALL BARRICADING AT THE END AND BEGINNING OF EACH DAY.

13. THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO CONFORM WITH EPA REQUIREMENTS, INCLUDING COMPLIANCE WITH NPDES PHASE 2 REQUIREMENTS. THIS INCLUDES PREPARATION OF A STORM WATER POLLUTION PREVENTION PLAN (SWPPP), FILING THE NOTICE

OF INTENT AND MAINTENANCE OF SWPPP BEST MANAGEMENT PLANS (BMP'S).

"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN WHICH

CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MAY BE IMPACTED BY UTILITY

INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.

"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO COMPLY

WITH VA STANDARDS) AROUND THE BUILDING CONSTRUCTION AREA. COORDINATE WITH COR.

"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS FOR

CONTRACTOR TO TEMPORARILY STAGE MATERIALS.

EXCAVATION NOTE

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.

SURVEY DISCLAIMER

SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION MAY HAVE OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED. CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION. CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR REPLACED

BY THE CONTRACTOR AT HIS EXPENSE.

CONTRACTOR NOTE

GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY TO THE VA.

VA FORM 08 - 6231

U.S. Department of Veterans Affairs

LIMITS OF CONSTRUCTION

BACK / FACE OF CURB

EDGE OF PAVEMENT

CONCRETE

A.C. PAVEMENT

STORM DRAIN MANHOLE

FIRE HYDRANT

SITE LIGHT POLE / STREETLIGHT

WATER VALVE

SIDEWALK

EXISTING NEW

STORM DRAIN AREA DRAIN

SAW-CUT LINE

CONSTRUCTION FENCING X X

SANITARY SEWER MANHOLE

STORM DRAIN CATCH BASIN

TREE

CONSTRUCT "VAN ACCESSIBLE" PARKING SIGN - SEE DETAIL D8, SHEET CG501

CONSTRUCT ACCESSIBLE STRIPING - SEE DETAIL B8, SHEET CG501

CONSTRUCT DETECTABLE WARNING STRIP - SEE DETAIL F3, SHEET CG501

TRAFFIC/PARKING SIGN

CONSTRUCT 4" WIDE WHITE PAINTED STRIPING, 2' O.C. AND OUTLINE

5 CONSTRUCT CONSTRUCTION AND SAFETY SIGN - SEE DETAIL F8, SHEET CU501

DEDUCTIVE ALTERNATE DELINEATION LINE

DEDUCT ALT 1

SEE DETAIL F9, THIS SHEET

SEE DETAIL B1, SHEET S-511

FOR STRUCTURAL DESIGN FINISH GRADE

F9 DEDUCT ALT. DETAIL

N.T.S.

CONCRETE POST BARRICADE WITH DECORATIVE COVER

CONCRETE POST BARRICADE WITH LIGHTED DECORATIVE COVER

BUILDING

DEDUCTIVE ALTERNATES

DEDUCTIVE ALTERNATE #1: REMOVE ALL SCOPE OF WORK ASSOCIATED

WITH ENCLOSING THE CONNECTING CORRIDOR A-131, INCLUDING THE

WALLS, WINDOW, CEILING, AND ROOF. THE RAISED CONCRETE SLAB AND

SUPPORTING WALLS SHALL REMAIN AND PROVIDE AN OUTSIDE

CONNECTION TO MAINE STREET. (~889 SF)

DEDUCTIVE ALTERNATE #2: REMOVE ALL SCOPE OF WORK ASSOCIATED

WITH FINISHING OUT MEN'S LOUNGE ROOM A-115, WOMEN'S LOUNGE

A-116, AND FAMILY VISITATION A-117. PROVIDE STORAGE SPACE ONLY.

(~813 SF)

NOTE: DEDUCTIVE ALTERNATES ARE CASCADING. EACH DEDUCT WILL BE TAKEN IN

SUCCESSION AND SHALL BE PRICED UNDER SEQUENTIAL, SEPARATE CLINs

(CONTRACT LINE ITEM NUMBER) SO DETERMINATIONS CAN BE MADE AND PRIORITIES

ESTABLISHED BASED ON BIDS RECEIVED.

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

Polygonal Line

Accessible Walkway

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Line

Line

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

VHATOGAINSWK

Oval

O2

Oval

VHATOGAINSWK

Polygonal Line

VHATOGAINSWK

Polygonal Line

VHATOGAINSWK

Oval

File details come from the government source that posted it. Updated .