00017695 - Preliminary Results.pdf
PDF 93 KB Posted
- Solicitation number
- S-73000-00017965
- Issued by
- Jackson County, Oregon
About this file
This is a preliminary bid tabulation document for an Invitation to Bid (ITB No. 73000-00017965) issued by the Oregon Department of Transportation for tree and brush removal services along Interstate 5, milepost 48.3 to 50, in Josephine County, Oregon. The project encompasses six line items covering mobilization, temporary traffic protection and direction, and tree and brush removal across multiple segments of Interstate 5 southbound and northbound shoulders, with work to be completed by December 15, 2026. The bid closing date was October 7, 2026, with a mandatory pre-bid conference held on September 30, 2026. Three bidders submitted quotes: Trees Plus Northwest, LLC (Central Point, OR) totaling $223,000; Underdog Timber Felling (Medford, OR) totaling $290,000; and Backwoods General Contracting, LLC totaling $305,000. The project requires removal of trees and brush from specified highway areas, including material disposal, stump and brush treatment, and clearing to establish adequate sight lines and safety zones around bridge structures and ramps.
This solicitation is exclusively restricted to Oregon-certified Emerging Small Businesses (ESBs) under ORS 200.160-200.200, with the selected contractor required to perform at least 51 percent of project labor using its own workforce. Bid security of 10 percent of the total bid amount and performance and payment bonds equal to the contract price are required. Contractors must provide commercial general liability insurance with $2 million per-occurrence and $5 million annual-aggregate limits, plus commercial automobile liability insurance with $1 million combined single limit. Prevailing wage rates apply per the Oregon Bureau of Labor and Industries for Josephine County (Region 8) as of September 3, 2026. Liquidated damages of $600 per calendar day apply for missed substantial completion, with additional damages of $500 per 15-minute interval per lane for lane closures exceeding allowable limits. Award is based on the lowest total quote price submitted by a responsive, responsible offeror. The preliminary tabulation indicates this is not an indicator of final award and remains under consideration.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Issued:
ITB No.
BIDDER
NAME:
Bid Closing: CITY/STATE:
Description:
CCB#:
Bid Item # Description Est
QTY UNIT
UNIT
PRICE
TOTAL
PRICE
UNIT
PRICE
TOTAL
PRICE
UNIT
PRICE
TOTAL
PRICE
1 Mobilization 1 Lump Sum
10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 25,000.00$ 25,000.00$
2 Temporary Protection & Direction of Traffic 1 Lump Sum
18,000.00$ 18,000.00$ 60,000.00$ 60,000.00$ 105,000.00$ 105,000.00$
Interstate 5 SB (MP 49.92 to 49.5) Southbound Shoulder Tree and brush removal including material to the fenceline , Clear all brush and trees to MP 49.5 a minimum of the top of the cutbank plus 3’ and 30’ vertical, also any dead trees able to reach the guardrail.
Disposal off site of wood chips, Stump and brush treatment.
1 Lump Sum
20,000.00$ 20,000.00$ 55,000.00$ 55,000.00$ 25,000.00$ 25,000.00$
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Trees Plus Northwest, LLC73000-00017965
10/7/2026
ESB - Interstate 5 MP 48.3 to 50: Clear Zone Tree Removal
9/17/2026
Salem, OR
Underdog Timber Felling
Medford, OR Central Point, OR
Backwoods General Contracting, LLC
Interstate 5 SB (MP 49.50 to 48.8) Southbound Shoulder Tree and brush removal including material to the fenceline, Clear all brush and trees from MP 49.5 a minimum of the top of the cutbank plus 3’ out and 30’ vertical, at the foothills undercrossing take all trees and brush from the bridge 20’ from the bridge to foothills road including those to be accessed from Foothills Blvd under the structure (Trees) From near MP 48.5 to the end of the SB off ramp at 48. Open all areas till the bridge to the top of bank and 3'. Otherwise, 20' beyond the guardrail and 30' up to The Evans Creek bridge.
Clear completely around the Bridge structures. On the 48 SB off ramp cut all trees to the toe of slope and any dead trees able to reach the guardrail. Note to open our access through the trees to mow.
Disposal off site of wood chips, Stump and brush treatment.
1 Lump Sum
100,000.00$ 100,000.00$ 105,000.00$ 105,000.00$ 50,000.00$ 50,000.00$
Interstate 5 SB (48.3 to 48.5 on ramp) SB all trees and brush cleared for 20’ past guardrail.
Maintain existing landscaping and prune those only.
Once the Bike Path turns away from the on ramp clear all trees and brush to toe of fill. Continue to end of on ramp .
1 Lump Sum
30,000.00$ 30,000.00$ 27,500.00$ 27,500.00$ 50,000.00$ 50,000.00$
Interstate 5 SB NB (48.55 to 48.8 depot street off ramp) NB all trees and brush from start of off Ramp to fenceline with railroad.
1 Lump Sum
45,000.00$ 45,000.00$ 32,500.00$ 32,500.00$ 50,000.00$ 50,000.00$
TOTAL 223,000.00$ 290,000.00$ 305,000.00$
Sheet1