This document is the revised technical specifications exhibit for an Emerging Small Business (ESB) procurement issued by the Oregon Department of Transportation (ODOT) for improvements at the Cascade Locks Maintenance Station located at 60 NW Forest Lane, Cascade Locks, Oregon. The project scope encompasses constructing a new bi-fold door enclosure in the existing data room (Room 102) to create a separate assistant manager's office, installing one steel door with a 2'x3' safety-glass vision window and acoustic soundproofing seals, installing a 1-ton hyper-heat ductless heat pump system with condenser and two protective bollards, adding electrical outlets and data ports, installing acoustic soundproofing strips on two existing office doors (Rooms 101 and 202), and upgrading 14 wall-mounted exterior LED lighting fixtures across the shop, storage, and fuel buildings. The project manager is Jorge Ojeda (jorge.ojeda@odot.oregon.gov; 971-429-4075). A voluntary pre-bid conference was scheduled for December 23, 2025, at 10:00 AM at the project site. Substantial completion is required by March 13, 2026, with final completion by March 23, 2026. Work must be performed Monday through Thursday between 6:00 a.m. and 4:00 p.m., excluding weekends and state holidays, with Friday work permitted during winter months if approved by the ODOT Project Manager.
This procurement is restricted to Oregon State-certified Emerging Small Businesses (ESBs) through the Certification Office for Business Inclusion and Diversity (COBID) for public improvement contracts estimated at $250,000 or less. Selected contractors must perform at least 51 percent of labor using their own workforce and maintain Oregon Construction Contractors Board (CCB) licensure. Contractors must carry Commercial General Liability insurance of $1,000,000 per occurrence and $2,000,000 annual aggregate, plus Commercial Automobile Liability coverage of $1,000,000 combined single limit. Prevailing wage rates for Hood River County, BOLI Region 9, apply. All contractors are responsible for obtaining necessary mechanical and electrical permits and providing one-year warranties on parts, labor, and workmanship. The project is funded through ODOT Facilities Management ESB funds. Award criteria include responsiveness, CCB licensure, ESB certification, performance history, and lowest bid price. Contractors must provide detailed submittals for approval prior to construction, including equipment manufacturer and model information, and maintain as-built record drawings with marked underground utilities upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00015543 Exhibit 2 Plans Revised.pdf | ||
| 00015543 Exhibit 2 Plans.pdf | ||
| 00015543 Intent To Award.xlsx | XLSX spreadsheet | |
| 00015543 Addendum 2.docx | DOCX document | |
| 00015543 Preliminary Results.xlsx | XLSX spreadsheet | |
| 00015543 ESB RFCQ Attachments.docx | DOCX document | |
| 00015543 Exhibit 1 Technical Specifications.doc | DOC document | |
| 00015543 ESB RFCQ 279C.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 1 – Technical Specifications
PROJECT OVERVIEW
12/29/2025 Addendum: Revised content in this document is shown in italicized and underlined font.
Oregon Department of Transportation
ESB – ODOT Cascade Locks MS New TMC Office & Exterior Lighting Upgrade Project Location:
ODOT Cascade Locks Maintenance Station
60 NW Forest Ln.
Cascade Locks, OR 97014
ODOT Contact:
The ODOT Project Manager for this project is Jorge Ojeda.
· E-mail: jorge.ojeda@odot.oregon.gov
· Cell: (971) 429-4075
· Address: 3700 SE 92nd Ave, Portland, OR 97266 The ODOT Project Manager may designate an additional ODOT contact person or engineer to support with inspections or questions in the field.
Project Background Needs at the ODOT Cascade Locks MS have led staff to request separate offices for the site manager and the assistant manager. That said, the selected location for the assistant manager’s office is the data room on the first floor of the shop building.
Additionally, some office doors require sound attenuation given their proximity to areas where noisy maintenance activities are performed in the MS building.
This project also represents an opportunity to address an exterior deficiency at the Maintenance Station, where some exterior wall-mounted lights have turned fogged over time and are recommended for replacement with LED fixtures.
ODOT Facilities Management has assigned ESB funds for this project, and, given the diverse scope, it is assumed that the project is most suitable for an electrical vendor as the prime contractor.
Detailed Project Scope:
The project includes the following work:
A. Shop Building, existing data room (102):
1. Install track-mounted bi-fold doors to enclose data equipment, positioned 38” from the back wall.
2. Relocate room lighting as needed to allow space to construct the new data doors.
3. Install (1) electrical outlet and (1) data port to make the new office functional.
4. Steel door installation:
a. Provide and install one (1) steel door with a 2’x3’ safety-glass vision window.
b. Ensure the door is insulated and fitted with soundproofing strips around the perimeter.
Basis of Design: Provide and install PrivacyShield Soundproofing Door Seal Kit (Complete Set) by Acoustical Solutions or approved equal. Kit shall include:
i. Automatic door bottom.
ii. Neoprene jamb seals for top and sides.
iii. Threshold seal.
iv. Components shall have a clear anodized aluminum finish. Installation shall ensure full perimeter acoustic seal to improve STC rating of the door assembly. Field trimming permitted per manufacturer’s instructions.
c. Reinstall existing handle and lockset on the new door.
d. Verify functionality, alignment, and smooth operation.
e. Prepare, prime, and paint the new door and frame to match adjacent finishes.
f. Perform all necessary touch-ups for a uniform appearance.
5. A new ductless heat pump shall be installed inside the new office.
a. Furnish and install one (1) 1-ton hyper-heat ductless heat pump with one indoor head Trane, Mitsubishi, Daikin, or equivalent approved by ODOT PM).
i. Install condenser on the east side of the building.
ii. Install (2) bollards in front of the condenser. Specifications are shown below in this document.
b. Install a wall-mounted indoor unit.
c. Install a new thermostat.
d. Provide electrical power to condenser and evaporator.
e. Install new refrigerant lines.
f. Provide one-year warranty on parts and labor.
g. Obtain and pay for all mechanical and electrical permits.
B. Shop Building, office 101:
1. Remove existing weather stripping or seals, if necessary.
2. Install new acoustic/soundproofing perimeter strips.
Basis of Design: PrivacyShield Soundproofing Door Seal Kit (Complete Set) by Acoustical Solutions or approved equal. Same requirements as above.
3. Adjust door to ensure proper closure and acoustic seal.
C. Shop Building, office 202:
1. Remove existing weather stripping or seals, if necessary.
2. Install new acoustic/soundproofing perimeter strips.
Basis of Design: PrivacyShield Soundproofing Door Seal Kit (Complete Set) by Acoustical Solutions or approved equal. Same requirements as above.
3. Adjust door to ensure proper closure and acoustic seal.
D. Shop, Storage, and Fuel buildings - exterior:
1. Install a total of 14 wall-mounted fixtures at the three buildings inside the premises. Basis of design is Lithonia Lighting TWX3 LED ALO 40K MVOLT DDBTXD.
2. All installations shall be performed by a licensed electrician in accordance with applicable codes and standards.
Electrical Conduit and Cabling Specifications
· Inside Room 102:
Cabling for electrical outlet and data port may be installed without conduit or match adjacent conditions, provided it complies with NEC (National Electrical Code) and local jurisdiction requirements for low-voltage and branch circuit wiring in finished spaces.
· Outside Room 102:
All new electrical wiring shall be installed in Electrical Metallic Tubing (EMT) conduit.
All conduit runs shall be neat, parallel, and perpendicular to building lines.
Penetrations through walls or floors shall be fire-stopped per code.
General Construction Notes:
· Bidders are invited to make a site visit and examine existing conditions prior to providing a bid. Any discrepancies shall be brought to the attention of ODOT through a request for clarification as set forth in the bid documents. Attendance to the pre-bid is encouraged, but not required.
· Clarifications shall be requested in writing prior to any installation. Incorrect installations shall be corrected at no additional cost to ODOT.
· All work shown is to be by the contractor unless specifically noted as being by ODOT or by others. All materials shown are to be provided by the contractor unless specifically noted as existing or provided by ODOT.
· Drawings are schematic in nature, major components and equipment are shown on the drawings. The contractor shall supply and install all minor components and materials necessary to provide a complete and functional project whether all such components are noted in the drawings and specifications.
· Plans and specifications call out specific makes and models of equipment in some locations. Substitution requests shall be made during the bid process. ODOT shall at its sole discretion determine the acceptability of substitutions. No substitutions shall be installed without prior written approval from the ODOT Construction Project Manager.
· All equipment and materials shall be installed in accordance with the manufacturer’s published installation instructions and recommendations.
· A bucket truck or any other equipment necessary to reach exterior wall fixtures shall be include in the contractor’s bid.
· Clean the entire work area at the conclusion of the project to the satisfaction of the ODOT Project Manager.
Submittals
The Contractor shall provide the following submittals at a minimum to the ODOT Project Manager. Submittals shall be approved by the ODOT Project Manager prior to the start of on-site construction.
· As detailed in specifications and plans.
Scheduling of Contract:
· Substantial completion of the Work shall be no later than 3/13/2026. Final completion shall be no later than 3/23/2026.
· After award of contract, the Contractor shall contact the ODOT Project Manager to schedule the Work at least ten (10) business days prior to the start of any work/demolition.
· The Work shall be accomplished between Mondays and Thursdays between 6:00 a.m. and 4:00 a.m. Work hours shall exclude weekends and State Holidays, unless specifically requested by the Contractor and approved by the ODOT Project Manager. Work on Fridays may be approved during the winter month if coordinated and approved in advance by ODOT Project Manager.
· Any permits required for the Work are the responsibility of the Contractor. The Contractor shall provide copies of permits to the ODOT Project Manager prior to the start of work. The Contractor shall be responsible for posting all permits on site in accordance with local jurisdiction requirements.
· The Contractor shall submit to the ODOT Project Managers a list of the contact information for the Contractor’s project manager and site superintendent, as well as a list of all Subcontractors and their key representatives.
· The Contractor shall coordinate the efforts of all Suppliers and Subcontractors and shall maintain orderly progress of the Work, prevent duplication of effort, and ensure proper sequence of operations.
Clean-Up/Conditions of Site:
· The contractor may use site power, water, and sanitary facilities.
· ODOT staff will relocate furniture currently inside room 102 as needed for construction work. ODOT will also relocate materials staged near wall-mount light fixtures if necessary.
· The Contractor shall be responsible for keeping the ODOT Project Manager informed of all activity throughout the Work.
· The Contractor shall clean up all worksite debris resulting from construction and remove all excess construction materials and scraps from the premises. The Contractor shall broom-clean their work area at the end of each workday and neatly stack materials and debris in an approved location. The contractor shall clean the entire work area at the conclusion of the project to the satisfaction of the ODOT Project Manager.
· The Contractor shall protect materials subject to damage by temperature or other weather conditions.
· The location for storage of materials, debris, or dumpster on the Premises shall be approved in advance by the ODOT Project Manager. Disposal facilities, bins, or dumpsters shall not be provided by ODOT.
· The Contractor shall notify the ODOT Project Manager at least two (2) days in advance of any major deliveries.
· Contractor shall immediately notify the ODOT Project Manager of any damage done by the Contractor to the Premises, grounds, or adjacent State properties. Damage done by the Contractor to the Premises or surrounding area shall be repaired to existing conditions as found prior to the commencement of the Work.
· ODOT shall not be responsible for the security of the Contractor’s materials, tools, personal belongings, or equipment on the Premises.
· It is the responsibility of the Contractor to ensure the Work is performed in accordance with Oregon OSHA rules and regulations.
· The Contractor shall immediately bring to the attention of the ODOT Project Manager any conflicts or issues between existing utilities and the Work.
Close Out:
· All special inspections must be complete prior to Substantial Completion.
· Inspection of the work by the ODOT Project Manager for establishment of Substantial Completion shall be made within five (5) business days after receipt of the Contractor’s email request. At this time, the ODOT Project Manager and the Contractor shall develop a punch list document of any incomplete or deficient work.
· Prior to Final Completion, the Contractor shall complete all items on the punch list.
· The Contractor shall provide final inspection reports for all permits applicable to this Contract signed by authorities having jurisdiction
· The Contractor shall maintain one set of the approved drawings for recording as-built conditions. Mark (in red) the actual location of all underground utilities and any changes. At the time of Final Completion, the Contractor shall turn over the one marked-up set of record drawings to the ODOT Project Manager.
· Prior to Final Completion, the Contractor shall provide one (1) digital copy via email of all operations, maintenance, and warranty information to the ODOT Project Manager.
· Prior to Final Completion, provide ODOT Project Manager with information for all equipment provided by the project, including but not limited to: Manufacturer, model, serial number, consumables, installation date, purchase date.
· Prior to Final Completion, and as prerequisite for final payment, provide ODOT Project Manager with signed certification that all subcontractors and suppliers have been paid in full and in compliance with all prompt payment requirements. All disputes with property owners have been resolved, all obligations on the project have been satisfied, all monetary claims and indebtedness have been paid, and, to the best of the Contractor's knowledge, there are no claims of any kind outstanding against the project.
· Prior to Final Completion, the Contractor shall fully instruct ODOT’s operating and maintenance personnel in the operation, adjustment, and maintenance of products, equipment, and systems.
· Inspection of the work by the ODOT Project Manager for establishment of Final Completion shall be made within five (5) business days after receipt of the Contractor’s email request.
Warranty:
· Contractor shall provide a 1 year Installation warranty on all workmanship.
· Contractor shall provide all warranties for equipment applicable to this Contract.
Bollard specifications:
Wall-mounted fixtures specifications:
Revision: 5/7/24