00015543 Exhibit 1 Technical Specifications.doc

DOC document 1 MB Posted

Attached to
ESB - ODOT Cascade Locks MS New TMC Office & Exterior Lighting Upgrade
Solicitation number
S-73000-00015543
Issued by
Hood River County, Canyonville City, Oregon

About this file

This is a Technical Specifications exhibit for an electrical construction project managed by the Oregon Department of Transportation (ODOT) at the Cascade Locks Maintenance Station in Cascade Locks, Oregon. The project scope includes interior office improvements and exterior lighting upgrades at the facility located at 60 NW Forest Ln. The contractor must construct a new office within the existing data room by installing track-mounted bi-folding closet doors, relocating room lighting, installing one electrical outlet and one data port, and providing a steel door with a 2'x3' vision window fitted with soundproofing strips. Additionally, the contractor must install a 1-ton hyper-heat ductless heat pump system (Trane, Mitsubishi, or Daikin) with interior wall-mounted unit and exterior condenser, provide electrical power and refrigerant lines, and install a new thermostat. Acoustic soundproofing perimeter strips must be installed on two existing office doors (offices 101 and 202) to attenuate noise from maintenance activities. The project also requires installation of 14 wall-mounted LED light fixtures (Lithonia Lighting TWX3 LED ALO 40K MVOLT DDBTXD basis of design) across the shop, storage, and fuel buildings. The substantial completion deadline is March 13, 2026, with final completion required by March 23, 2026. Work must be performed Monday through Thursday between 6:00 a.m. and 4:00 p.m., excluding weekends and state holidays unless approved. Site visits are encouraged but not required prior to bidding.

The contractor, selected as an electrical vendor prime contractor, is responsible for obtaining all required mechanical and electrical permits and providing copies to the ODOT Project Manager prior to work commencement. The contractor must provide one-year warranties on all workmanship and all applicable equipment warranties. All materials and equipment not specifically noted as existing or provided by ODOT shall be supplied by the contractor, including a bucket truck or equivalent equipment for reaching exterior fixtures. ODOT will provide site power, water, sanitary facilities, and will relocate furniture and materials as needed. The contractor is responsible for all cleanup, debris removal, material storage coordination, utility conflict identification, and compliance with Oregon OSHA regulations. Submittals including equipment specifications, permits, contractor contact information, and subcontractor lists must be approved by the ODOT Project Manager prior to construction start. The project is funded through ODOT Facilities Management ESB (Enterprise Service Board) funds. The ODOT Project Manager is Jorge Ojeda (jorge.ojeda@odot.oregon.gov, 971-429-4075).

View the file

Other files

File Type Posted
00015543 Exhibit 2 Plans Revised.pdf PDF
00015543 Exhibit 2 Plans.pdf PDF
00015543 Intent To Award.xlsx XLSX spreadsheet
00015543 Addendum 2.docx DOCX document
00015543 Preliminary Results.xlsx XLSX spreadsheet
00015543 ESB RFCQ Attachments.docx DOCX document
00015543 Exhibit 1 Technical Specifications Revised~1.doc DOC document
00015543 ESB RFCQ 279C.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 1 – TECHNICAL SPECIFICATIONS

PROJECT OVERVIEW

12/01/2025 Oregon Department of Transportation

ESB – ODOT Cascade Locks MS New TMC Office & Exterior Lighting Upgrade Project Location:

ODOT Cascade Locks Maintenance Station

60 NW Forest Ln.

Cascade Locks, OR 97014

ODOT Contact:

The ODOT Project Manager for this project is Jorge Ojeda.

· E-mail: jorge.ojeda@odot.oregon.gov

· Cell: (971) 429-4075

· Address: 3700 SE 92nd Ave, Portland, OR 97266 The ODOT Project Manager may designate an additional ODOT contact person or engineer to support with inspections or questions in the field.

Project Background Needs at the ODOT Cascade Locks MS have led staff to request separate offices for the site manager and the assistant manager. That said, the selected location for the assistant manager’s office is the data room on the first floor of the shop building.

Additionally, some office doors require sound attenuation given their proximity to areas where noisy maintenance activities are performed in the MS building.

This project also represents an opportunity to address an exterior deficiency at the Maintenance Station, where some exterior wall-mounted lights have turned fogged over time and are recommended for replacement with LED fixtures.

ODOT Facilities Management has assigned ESB funds for this project, and, given the diverse scope, it is assumed that the project is most suitable for an electrical vendor as the prime contractor.

Detailed Project Scope:

The project scope involves the following:

A. Shop Building, existing data room (102):

1. Data closet: Install track-mounted bi-folding closet doors to enclose data equipment.

2. Relocate room lighting as needed to have space to construct the new closet.

3. Install 1 electrical outlet and 1 data port to make the new office functional.

4. Steel door installation:

a. Provide and install one (1) steel door with a 2’x3’ vision window.

b. Door to be insulated and fitted with soundproofing strips around the perimeter.

c. Reinstall existing handle and lockset on the new door.

d. Verify functionality, alignment, and smooth operation.

e. Prepare, prime, and paint the new door and frame to match adjacent finishes.

f. Perform all necessary touch-ups for a uniform appearance.

5. A new ductless heat pump shall be installed inside the new office.

a. Furnish and install one (1) 1Ton hyper-heat ductless heat pump with 1 indoor head Trane, Mitsubishi, Daikin, …)

b. Install the condenser at the back of the building

c. Install a wall mounted indoor unit.

d. Install a new thermostat

e. Provide electrical power to condenser and evaporator.

f. New refrigerant lines.

g. Provide one-year warranty on parts and labor.

h. Provide mechanical and electrical permits.

B. Shop Building, office 101:

1. Remove existing weather stripping or seals, if necessary.

2. Install new acoustic/soundproofing perimeter strips.

3. Adjust door to ensure proper closure and acoustic seal.

C. Shop Building, office 202:

1. Remove existing weather stripping or seals, if necessary.

2. Install new acoustic/soundproofing perimeter strips.

3. Adjust door to ensure proper closure and acoustic seal.

D. Shop, Storage, and Fuel buildings, exterior:

1. Install a total of 14 wall mount at the three buildings inside the premises. Basis of design is Lithonia Lighting TWX3 LED ALO 40K MVOLT DDBTXD.

2. Installation of all items shall be performed by a licensed electrician in accordance with applicable codes and standards.

General Construction Notes:

· Bidders are invited to make a site visit and examine existing conditions prior to providing a bid. Any discrepancies shall be brought to the attention of ODOT through a request for clarification as set forth in the bid documents. Attendance to the pre-bid is encouraged, but not required.

· Clarifications shall be requested in writing prior to any installation. Incorrect installations shall be corrected at no additional cost to ODOT.

· All work shown is to be by the contractor unless specifically noted as being by ODOT or by others. All materials shown are to be provided by the contractor unless specifically noted as existing or provided by ODOT.

· Drawings are schematic in nature, major components and equipment are shown on the drawings. The contractor shall supply and install all minor components and materials necessary to provide a complete and functional project whether all such components are noted in the drawings and specifications.

· Plans and specifications call out specific makes and models of equipment in some locations. Substitution requests shall be made during the bid process. ODOT shall at its sole discretion determine the acceptability of substitutions. No substitutions shall be installed without prior written approval from the ODOT Construction Project Manager.

· All equipment and materials shall be installed in accordance with the manufacturer’s published installation instructions and recommendations.

· A bucket truck or any other equipment necessary to reach exterior wall fixtures shall be include in the contractor’s bid.

· Clean the entire work area at the conclusion of the project to the satisfaction of the ODOT Project Manager.

Submittals

The Contractor shall provide the following submittals at a minimum to the ODOT Project Manager. Submittals shall be approved by the ODOT Project Manager prior to the start of on-site construction.

· As detailed in specifications and plans.

Scheduling of Contract:

· Substantial completion of the Work shall be no later than 3/13/2026. Final completion shall be no later than 3/23/2026.

· After award of contract, the Contractor shall contact the ODOT Project Manager to schedule the Work at least ten (10) business days prior to the start of any work/demolition.

· The Work shall be accomplished between Mondays and Thursdays between 6:00 a.m. and 4:00 a.m. Work hours shall exclude weekends and State Holidays, unless specifically requested by the Contractor and approved by the ODOT Project Manager. Work on Fridays may be approved during the winter month if coordinated and approved in advance by ODOT Project Manager.

· Any permits required for the Work are the responsibility of the Contractor. The Contractor shall provide copies of permits to the ODOT Project Manager prior to the start of work. The Contractor shall be responsible for posting all permits on site in accordance with local jurisdiction requirements.

· The Contractor shall submit to the ODOT Project Managers a list of the contact information for the Contractor’s project manager and site superintendent, as well as a list of all Subcontractors and their key representatives.

· The Contractor shall coordinate the efforts of all Suppliers and Subcontractors and shall maintain orderly progress of the Work, prevent duplication of effort, and ensure proper sequence of operations.

Clean-Up/Conditions of Site:

· The contractor may use site power, water, and sanitary facilities.

· ODOT staff will relocate furniture currently inside room 102 as needed for construction work. ODOT will also relocate materials staged near wall-mount light fixtures if necessary.

· The Contractor shall be responsible for keeping the ODOT Project Manager informed of all activity throughout the Work.

· The Contractor shall clean up all worksite debris resulting from construction and remove all excess construction materials and scraps from the premises. The Contractor shall broom-clean their work area at the end of each workday and neatly stack materials and debris in an approved location. The contractor shall clean the entire work area at the conclusion of the project to the satisfaction of the ODOT Project Manager.

· The Contractor shall protect materials subject to damage by temperature or other weather conditions.

· The location for storage of materials, debris, or dumpster on the Premises shall be approved in advance by the ODOT Project Manager. Disposal facilities, bins, or dumpsters shall not be provided by ODOT.

· The Contractor shall notify the ODOT Project Manager at least two (2) days in advance of any major deliveries.

· Contractor shall immediately notify the ODOT Project Manager of any damage done by the Contractor to the Premises, grounds, or adjacent State properties. Damage done by the Contractor to the Premises or surrounding area shall be repaired to existing conditions as found prior to the commencement of the Work.

· ODOT shall not be responsible for the security of the Contractor’s materials, tools, personal belongings, or equipment on the Premises.

· It is the responsibility of the Contractor to ensure the Work is performed in accordance with Oregon OSHA rules and regulations.

· The Contractor shall immediately bring to the attention of the ODOT Project Manager any conflicts or issues between existing utilities and the Work.

Close Out:

· All special inspections must be complete prior to Substantial Completion.

· Inspection of the work by the ODOT Project Manager for establishment of Substantial Completion shall be made within five (5) business days after receipt of the Contractor’s email request. At this time, the ODOT Project Manager and the Contractor shall develop a punch list document of any incomplete or deficient work.

· Prior to Final Completion, the Contractor shall complete all items on the punch list.

· The Contractor shall provide final inspection reports for all permits applicable to this Contract signed by authorities having jurisdiction

· The Contractor shall maintain one set of the approved drawings for recording as-built conditions. Mark (in red) the actual location of all underground utilities and any changes. At the time of Final Completion, the Contractor shall turn over the one marked-up set of record drawings to the ODOT Project Manager.

· Prior to Final Completion, the Contractor shall provide one (1) digital copy via email of all operations, maintenance, and warranty information to the ODOT Project Manager.

· Prior to Final Completion, provide ODOT Project Manager with information for all equipment provided by the project, including but not limited to: Manufacturer, model, serial number, consumables, installation date, purchase date.

· Prior to Final Completion, and as prerequisite for final payment, provide ODOT Project Manager with signed certification that all subcontractors and suppliers have been paid in full and in compliance with all prompt payment requirements. All disputes with property owners have been resolved, all obligations on the project have been satisfied, all monetary claims and indebtedness have been paid, and, to the best of the Contractor's knowledge, there are no claims of any kind outstanding against the project.

· Prior to Final Completion, the Contractor shall fully instruct ODOT’s operating and maintenance personnel in the operation, adjustment, and maintenance of products, equipment, and systems.

· Inspection of the work by the ODOT Project Manager for establishment of Final Completion shall be made within five (5) business days after receipt of the Contractor’s email request.

Warranty:

· Contractor shall provide a 1 year Installation warranty on all workmanship.

· Contractor shall provide all warranties for equipment applicable to this Contract.

Revision: 5/7/24