This is a preliminary bid results tabulation for ITB No. S-73000-00015356, issued by the Oregon Department of Transportation (ODOT) Region 1 on December 17, 2025, for on-call guardrail repair supplemental services. The solicitation encompasses a comprehensive range of guardrail repair and installation work across Districts 2B and 2C, including emergency callout services, mobilization, traffic control, flagging, guardrail removal, component installation (rails, posts, blocks, and terminals), adjustments, and delineator placement. Five bidders submitted proposals by the December 17, 2025, at 2:00 PM closing deadline: Dirt and Aggregate Interchange Inc, Mid Valley Excavation, O'Malley Brothers Corporation, Zochert Fence, and Columbia River Contractors. The bid tabulation itemizes 33 line items with unit prices and total prices for each bidder, ranging from emergency callout premiums to delineator installations, with quantities specified as lump sum, per day, per hour, per foot, or per each as appropriate to the service type.
The total bid amounts submitted were $42,671.25 (Dirt and Aggregate Interchange Inc), $42,449.00 (Mid Valley Excavation), $54,558.50 (O'Malley Brothers Corporation), $34,269.00 (Zochert Fence), and $50,926.85 (Columbia River Contractors). Pricing varies significantly across bidders for identical line items; for example, emergency callout premiums range from $5,000.00 to $13,100.00, and guardrail anchors (Type 1) range from $1,250.00 to $2,200.00 per unit. The document explicitly states that this bid tabulation is not an indicator of award and serves only as a compilation of submitted bids for consideration. No information regarding contract term, renewal options, set-asides, or funding sources is provided in this preliminary results document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | December 17, 2025 at 2:00 pm | ||||||
| ITB No. | S-73000-00015356 | BIDDER | |||||
| NAME: | Dirt and Aggregate Interchange Inc | Mid Valley Excavation | O'Malley Brothers Corporation | Zochert Fence | Columbia River Contractors | ||
| Bid Closing: | December 17, 2025 at 2:00 pm | CITY/STATE: | |||||
| Description: | ODOT Region 1 On Call Guardrail Repair Supplemental PA | CCB#: | |||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Emergency Callout Premium | 1 | LS | $ 13,100.00 | $ 13,100.00 | $ 7,500.00 | $ 7,500.00 | $ 9,500.00 | $ 9,500.00 | $ 5,000.00 | $ 5,000.00 | $ 11,950.00 | $ 11,950.00 |
| 2 | Mobilization District 2B | 1 | LS | $ 3,225.00 | $ 3,225.00 | $ 2,500.00 | $ 2,500.00 | $ 4,000.00 | $ 4,000.00 | $ 2,500.00 | $ 2,500.00 | $ 2,450.00 | $ 2,450.00 |
| 3 | Mobilization District 2C | 1 | LS | $ 4,500.00 | $ 4,500.00 | $ 5,000.00 | $ 5,000.00 | $ 4,000.00 | $ 4,000.00 | $ 2,500.00 | $ 2,500.00 | $ 4,950.00 | $ 4,950.00 |
| 4 | Per Diem | 1 | DAY | $ 125.00 | $ 125.00 | $ 200.00 | $ 200.00 | $ 145.00 | $ 145.00 | $ 200.00 | $ 200.00 | $ 124.00 | $ 124.00 |
| 5 | Standard Traffic Control and Materials | 1 | DAY | $ 1,350.00 | $ 1,350.00 | $ 1,500.00 | $ 1,500.00 | $ 2,150.00 | $ 2,150.00 | $ 2,500.00 | $ 2,500.00 | $ 2,450.00 | $ 2,450.00 |
| 6 | Flaggers | 1 | HOUR | $ 90.00 | $ 90.00 | $ 100.00 | $ 100.00 | $ 115.00 | $ 115.00 | $ 250.00 | $ 250.00 | $ 115.00 | $ 115.00 |
| 7 | Removal of Guardrail (Metal Beam Rail only) | 1 | FOOT | $ 4.40 | $ 4.40 | $ 6.00 | $ 6.00 | $ 10.00 | $ 10.00 | $ 3.00 | $ 3.00 | $ 7.95 | $ 7.95 |
| 8 | Removal of Guardrail (Rails, Posts, Blocks, and Terminals | 1 | EACH | $ 6.70 | $ 6.70 | $ 11.00 | $ 11.00 | $ 16.00 | $ 16.00 | $ 6.00 | $ 6.00 | $ 14.95 | $ 14.95 |
| 9 | Metal Beam Rails | 1 | EACH | $ 187.00 | $ 187.00 | $ 330.00 | $ 330.00 | $ 410.00 | $ 410.00 | $ 150.00 | $ 150.00 | $ 420.00 | $ 420.00 |
| 10 | Guardrail Posts, Wood | 1 | EACH | $ 123.00 | $ 123.00 | $ 200.00 | $ 200.00 | $ 270.00 | $ 270.00 | $ 175.00 | $ 175.00 | $ 270.00 | $ 270.00 |
| 11 | Guardrail Posts, Steel | 1 | EACH | $ 130.00 | $ 130.00 | $ 225.00 | $ 225.00 | $ 290.00 | $ 290.00 | $ 125.00 | $ 125.00 | $ 290.00 | $ 290.00 |
| 12 | Extra for 8 foot posts, Wood | 1 | EACH | $ 50.25 | $ 50.25 | $ 75.00 | $ 75.00 | $ 100.00 | $ 100.00 | $ 225.00 | $ 225.00 | $ 95.00 | $ 95.00 |
| 13 | Extra for 8 foot posts, Steel | 1 | EACH | $ 59.70 | $ 59.70 | $ 75.00 | $ 75.00 | $ 115.00 | $ 115.00 | $ 170.00 | $ 170.00 | $ 99.00 | $ 99.00 |
| 14 | Guardrail Blocks, Wood | 1 | EACH | $ 26.90 | $ 26.90 | $ 65.00 | $ 65.00 | $ 95.00 | $ 95.00 | $ 20.00 | $ 20.00 | $ 85.00 | $ 85.00 |
| 15 | Guardrail Blocks, Plastic | 1 | EACH | $ 19.80 | $ 19.80 | $ 60.00 | $ 60.00 | $ 95.00 | $ 95.00 | $ 10.00 | $ 10.00 | $ 85.00 | $ 85.00 |
| 16 | Adjusting Guardrail | 1 | FOOT | $ 4.50 | $ 4.50 | $ 10.00 | $ 10.00 | $ 65.00 | $ 65.00 | $ 5.00 | $ 5.00 | $ 11.95 | $ 11.95 |
| 17 | Guardrail, Type 2A | 1 | FOOT | $ 38.00 | $ 38.00 | $ 50.00 | $ 50.00 | $ 75.00 | $ 75.00 | $ 40.00 | $ 40.00 | $ 60.00 | $ 60.00 |
| 18 | Guardrail, Type 3 | 1 | FOOT | $ 75.00 | $ 75.00 | $ 95.00 | $ 95.00 | $ 135.00 | $ 135.00 | $ 65.00 | $ 65.00 | $ 112.00 | $ 112.00 |
| 19 | Guardrail, Type 4 Thrie Beam | 1 | FOOT | $ 66.00 | $ 66.00 | $ 100.00 | $ 100.00 | $ 137.50 | $ 137.50 | $ 70.00 | $ 70.00 | $ 115.00 | $ 115.00 |
| 20 | Guardrail End Pieces, Type B | 1 | EACH | $ 100.00 | $ 100.00 | $ 125.00 | $ 125.00 | $ 150.00 | $ 150.00 | $ 120.00 | $ 120.00 | $ 130.00 | $ 130.00 |
| 21 | Guardrail End Pieces, Type C | 1 | EACH | $ 200.00 | $ 200.00 | $ 170.00 | $ 170.00 | $ 190.00 | $ 190.00 | $ 150.00 | $ 150.00 | $ 165.00 | $ 165.00 |
| 22 | Guardrail Anchors, Type 1 | 1 | EACH | $ 1,250.00 | $ 1,250.00 | $ 1,850.00 | $ 1,850.00 | $ 2,200.00 | $ 2,200.00 | $ 1,950.00 | $ 1,950.00 | $ 2,200.00 | $ 2,200.00 |
| 23 | Guardrail Anchors, Type 1 Modified | 1 | EACH | $ 900.00 | $ 900.00 | $ 1,375.00 | $ 1,375.00 | $ 1,950.00 | $ 1,950.00 | $ 1,650.00 | $ 1,650.00 | $ 1,500.00 | $ 1,500.00 |
| 24 | Guardrail Transition | 1 | EACH | $ 3,850.00 | $ 3,850.00 | $ 4,150.00 | $ 4,150.00 | $ 5,500.00 | $ 5,500.00 | $ 2,100.00 | $ 2,100.00 | $ 4,600.00 | $ 4,600.00 |
| 25 | Guardrail Terminals, Flared FLEAT | 1 | EACH | $ 3,000.00 | $ 3,000.00 | $ 3,670.00 | $ 3,670.00 | $ 5,500.00 | $ 5,500.00 | $ 3,500.00 | $ 3,500.00 | $ 4,050.00 | $ 4,050.00 |
| 26 | Guardrail Terminals, Flared MFLEAT | 1 | EACH | $ 3,300.00 | $ 3,300.00 | $ 4,400.00 | $ 4,400.00 | $ 5,900.00 | $ 5,900.00 | $ 3,500.00 | $ 3,500.00 | $ 4,800.00 | $ 4,800.00 |
| 27 | Guardrail Terminals, Non-Flared SKT | 1 | EACH | $ 3,175.00 | $ 3,175.00 | $ 4,000.00 | $ 4,000.00 | $ 5,900.00 | $ 5,900.00 | $ 3,500.00 | $ 3,500.00 | $ 4,400.00 | $ 4,400.00 |
| 28 | Guardrail Terminals, Non-Flared MSKT | 1 | EACH | $ 3,300.00 | $ 3,300.00 | $ 4,350.00 | $ 4,350.00 | $ 4,900.00 | $ 4,900.00 | $ 3,500.00 | $ 3,500.00 | $ 4,800.00 | $ 4,800.00 |
| 29 | Midwest Guardrail System, Type 2A, with wood posts | 1 | FOOT | $ 37.00 | $ 37.00 | $ 50.00 | $ 50.00 | $ 75.00 | $ 75.00 | $ 50.00 | $ 50.00 | $ 62.00 | $ 62.00 |
| 30 | Midwest Guardrail System, Type 2A, with steel posts | 1 | FOOT | $ 38.00 | $ 38.00 | $ 55.00 | $ 55.00 | $ 75.00 | $ 75.00 | $ 40.00 | $ 40.00 | $ 65.00 | $ 65.00 |
| 31 | Extra for Hand Dug Guardrail Post Holes | 1 | EACH | $ 250.00 | $ 250.00 | $ 22.00 | $ 22.00 | $ 300.00 | $ 300.00 | $ 100.00 | $ 100.00 | $ 300.00 | $ 300.00 |
| 32 | Delineators, Type 1,1U | 1 | EACH | $ 50.00 | $ 50.00 | $ 80.00 | $ 80.00 | $ 120.00 | $ 120.00 | $ 60.00 | $ 60.00 | $ 95.00 | $ 95.00 |
| 33 | Delineators, Type 4 Alternate 2 | 1 | EACH | $ 40.00 | $ 40.00 | $ 50.00 | $ 50.00 | $ 75.00 | $ 75.00 | $ 35.00 | $ 35.00 | $ 55.00 | $ 55.00 |
| TOTAL | $ 42,671.25 | $ 42,449.00 | $ 54,558.50 | $ 34,269.00 | $ 50,926.85 |