Bid Tab Summary: Yaquina Bay Bridge Pier 2 Dolphin Replacement Project

This bid tabulation spreadsheet documents bids submitted to the Oregon Department of Transportation (ODOT) for the Major Bridge Maintenance Yaquina Bay Bridge Pier 2 Dolphin Replacement Project in Lincoln County. The project encompasses removal of 33 existing steel piles across 11 dolphins and installation of 36 replacement steel pipe piles, with work scheduled between November 1, 2025, and February 15, 2026. Key project activities include removing existing pier protection, installing new steel piles, preparing and coating metal structures, adding navigation lights, and implementing environmental monitoring protocols. The voluntary pre-bid conference was held on October 13, 2025, via Microsoft Teams, with bid submissions required through the OregonBuys eProcurement system by October 23, 2025. The contract will be awarded to the lowest responsive bidder meeting all qualification and responsibility criteria.

The project carries an estimated cost range between $1,000,000 and $2,000,000, with funding from state sources. Bidders must be registered in OregonBuys, possess a valid Construction Contractors Board license, provide performance and payment bonds, and meet specific insurance coverage requirements due to the in-water nature of the work. Contract requirements include compliance with prevailing wage requirements from the Bureau of Labor and Industries (BOLI) and State Buy America requirements. First-tier subcontractor disclosures are mandatory. Environmental considerations are significant, with work limited to a specific in-water window and requiring permits from the Oregon Department of State Lands, U.S. Army Corps of Engineers, and Oregon Department of Environmental Quality. No specific set-aside designations for disadvantaged enterprises were noted in the documentation.

View the file

Other files

File Type Posted
00014917_ITB.docx DOCX document
00014917_Addendum1.docx DOCX document
IT1730-25 - MTS IntegraTRAK Inc - Special Procurement Notice.docx DOCX document
00014917_Form A-2_Bid Pricing Form~1.xlsx XLSX spreadsheet
00014917_Att C-1_Record Drawings.pdf PDF
00014917_Exh 7-3_IHA Permit.pdf PDF
00014917_Exh 7-2_Permit Application.pdf PDF
00014917_Exhibit 6_Plans.pdf PDF
00014977_Exh 5_Specifications.pdf PDF
00014917_Exh 7-1_Permit Authorization.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

S-73000-00014917 MBM Yaquina Bay Bridge Pier 2 Dolphin Replacement Project
BID TABULATIONBilleter Marine LLCBergerson Construction IncLegacy Contracting IncAdvanced American Construction IncWest Coast Contractors
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Mobilization1LS$ 79,629.88$ 79,629.88$145,000.00$ 145,000.00$ 126,400.00$ 126,400.00$ 136,000.00$ 136,000.00$ 150,562.49$ 150,562.49
2Temporary Work Access and Containment1LS$ 65,056.84$ 65,056.84$ 61,000.00$ 61,000.00$ 186,682.00$ 186,682.00$ 20,000.00$ 20,000.00$ 12,259.11$ 12,259.11
3Pollution Control Plan1LS$ 5,079.78$ 5,079.78$ 1387.00$ 1,387.00$ 2,685.00$ 2,685.00$ 4,000.00$ 4,000.00$ 4,187.67$ 4,187.67
4Trubidity Monitoring1LS$ 6,023.25$ 6,023.25$ 4575.00$ 4,575.00$ 3,174.00$ 3,174.00$ 4,000.00$ 4,000.00$ 6,312.24$ 6,312.24
5Bridge Removal Work1LS$ 71,383.82$ 71,383.82$ 120000.00$ 120,000.00$ 57,327.00$ 57,327.00$ 245,000.00$ 245,000.00$ 130,414.90$ 130,414.90
6Furnish Pile Driving Equipment1LS$ 26,333.91$ 26,333.91$ 44611.00$ 44,611.00$ 60,045.00$ 60,045.00$ 20,000.00$ 20,000.00$ 553,378.90$ 553,378.90
7Furnish PP16 x 0.625 Steel Piles2556LF$ 101.73$ 260,021.88$ 148.00$ 378,288.00$ 124.00$ 316,944.00$ 190.00$ 485,640.00$ 101.58$ 259,638.48
8Drive PP16 x 0.625 Steel Piles36EA$ 4,453.94$ 160,341.84$ 7,380.00$ 265,680.00$ 5,484.00$ 197,424.00$ 6,000.00$ 216,000.00$ 1,889.28$ 68,014.08
9Steel Pile Protective Coating1LS$ 77,000.00$ 77,000.00$ 95,000.00$ 95,000.00$ 154,318.00$ 154,318.00$ 130,000.00$ 130,000.00$ 172,798.41$ 172,798.41
10Furnish and Install Aluminum Anodes1LS$ 91,222.27$ 91,222.27$ 34,400.00$ 34,400.00$ 22,796.00$ 22,796.00$ 15,000.00$ 15,000.00$ 100,618.47$ 100,618.47
11Structural Steel Maintenance1LS$ 92,465.44$ 92,465.44$ 43,000.00$ 43,000.00$ 114,887.00$ 114,887.00$ 50,000.00$ 50,000.00$ 106,567.74$ 106,567.74
12Switching, Conduit, and Wiring1LS$ 22,497.38$ 22,497.38$ 4,900.00$ 4,900.00$ 21,915.00$ 21,915.00$ 35,000.00$ 35,000.00$ 19,000.67$ 19,000.67
TOTAL$ 957,056.29$ 1,197,841.00$ 1,264,597.00$ 1,360,640.00$ 1,583,753.16