00014917_Bid tab.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- S-73000-00014917
- Issued by
- Jackson County, Oregon
About this file
Bid Tab Summary: Yaquina Bay Bridge Pier 2 Dolphin Replacement Project
This bid tabulation spreadsheet documents bids submitted to the Oregon Department of Transportation (ODOT) for the Major Bridge Maintenance Yaquina Bay Bridge Pier 2 Dolphin Replacement Project in Lincoln County. The project encompasses removal of 33 existing steel piles across 11 dolphins and installation of 36 replacement steel pipe piles, with work scheduled between November 1, 2025, and February 15, 2026. Key project activities include removing existing pier protection, installing new steel piles, preparing and coating metal structures, adding navigation lights, and implementing environmental monitoring protocols. The voluntary pre-bid conference was held on October 13, 2025, via Microsoft Teams, with bid submissions required through the OregonBuys eProcurement system by October 23, 2025. The contract will be awarded to the lowest responsive bidder meeting all qualification and responsibility criteria.
The project carries an estimated cost range between $1,000,000 and $2,000,000, with funding from state sources. Bidders must be registered in OregonBuys, possess a valid Construction Contractors Board license, provide performance and payment bonds, and meet specific insurance coverage requirements due to the in-water nature of the work. Contract requirements include compliance with prevailing wage requirements from the Bureau of Labor and Industries (BOLI) and State Buy America requirements. First-tier subcontractor disclosures are mandatory. Environmental considerations are significant, with work limited to a specific in-water window and requiring permits from the Oregon Department of State Lands, U.S. Army Corps of Engineers, and Oregon Department of Environmental Quality. No specific set-aside designations for disadvantaged enterprises were noted in the documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00014917_ITB.docx | DOCX document | |
| 00014917_Addendum1.docx | DOCX document | |
| IT1730-25 - MTS IntegraTRAK Inc - Special Procurement Notice.docx | DOCX document | |
| 00014917_Form A-2_Bid Pricing Form~1.xlsx | XLSX spreadsheet | |
| 00014917_Att C-1_Record Drawings.pdf | ||
| 00014917_Exh 7-3_IHA Permit.pdf | ||
| 00014917_Exh 7-2_Permit Application.pdf | ||
| 00014917_Exhibit 6_Plans.pdf | ||
| 00014977_Exh 5_Specifications.pdf | ||
| 00014917_Exh 7-1_Permit Authorization.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| S-73000-00014917 MBM Yaquina Bay Bridge Pier 2 Dolphin Replacement Project | ||||||||
| BID TABULATION | Billeter Marine LLC | Bergerson Construction Inc | Legacy Contracting Inc | Advanced American Construction Inc | West Coast Contractors | |||
| Bid Item # | Description | Est | ||||||
| QTY | UNIT | UNIT | ||||||
| PRICE | TOTAL | |||||||
| PRICE | UNIT | |||||||
| PRICE | TOTAL | |||||||
| PRICE | UNIT | |||||||
| PRICE | TOTAL | |||||||
| PRICE | UNIT | |||||||
| PRICE | TOTAL | |||||||
| PRICE | UNIT | |||||||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 79,629.88 | $ 79,629.88 | $145,000.00 | $ 145,000.00 | $ 126,400.00 | $ 126,400.00 | $ 136,000.00 | $ 136,000.00 | $ 150,562.49 | $ 150,562.49 |
| 2 | Temporary Work Access and Containment | 1 | LS | $ 65,056.84 | $ 65,056.84 | $ 61,000.00 | $ 61,000.00 | $ 186,682.00 | $ 186,682.00 | $ 20,000.00 | $ 20,000.00 | $ 12,259.11 | $ 12,259.11 |
| 3 | Pollution Control Plan | 1 | LS | $ 5,079.78 | $ 5,079.78 | $ 1387.00 | $ 1,387.00 | $ 2,685.00 | $ 2,685.00 | $ 4,000.00 | $ 4,000.00 | $ 4,187.67 | $ 4,187.67 |
| 4 | Trubidity Monitoring | 1 | LS | $ 6,023.25 | $ 6,023.25 | $ 4575.00 | $ 4,575.00 | $ 3,174.00 | $ 3,174.00 | $ 4,000.00 | $ 4,000.00 | $ 6,312.24 | $ 6,312.24 |
| 5 | Bridge Removal Work | 1 | LS | $ 71,383.82 | $ 71,383.82 | $ 120000.00 | $ 120,000.00 | $ 57,327.00 | $ 57,327.00 | $ 245,000.00 | $ 245,000.00 | $ 130,414.90 | $ 130,414.90 |
| 6 | Furnish Pile Driving Equipment | 1 | LS | $ 26,333.91 | $ 26,333.91 | $ 44611.00 | $ 44,611.00 | $ 60,045.00 | $ 60,045.00 | $ 20,000.00 | $ 20,000.00 | $ 553,378.90 | $ 553,378.90 |
| 7 | Furnish PP16 x 0.625 Steel Piles | 2556 | LF | $ 101.73 | $ 260,021.88 | $ 148.00 | $ 378,288.00 | $ 124.00 | $ 316,944.00 | $ 190.00 | $ 485,640.00 | $ 101.58 | $ 259,638.48 |
| 8 | Drive PP16 x 0.625 Steel Piles | 36 | EA | $ 4,453.94 | $ 160,341.84 | $ 7,380.00 | $ 265,680.00 | $ 5,484.00 | $ 197,424.00 | $ 6,000.00 | $ 216,000.00 | $ 1,889.28 | $ 68,014.08 |
| 9 | Steel Pile Protective Coating | 1 | LS | $ 77,000.00 | $ 77,000.00 | $ 95,000.00 | $ 95,000.00 | $ 154,318.00 | $ 154,318.00 | $ 130,000.00 | $ 130,000.00 | $ 172,798.41 | $ 172,798.41 |
| 10 | Furnish and Install Aluminum Anodes | 1 | LS | $ 91,222.27 | $ 91,222.27 | $ 34,400.00 | $ 34,400.00 | $ 22,796.00 | $ 22,796.00 | $ 15,000.00 | $ 15,000.00 | $ 100,618.47 | $ 100,618.47 |
| 11 | Structural Steel Maintenance | 1 | LS | $ 92,465.44 | $ 92,465.44 | $ 43,000.00 | $ 43,000.00 | $ 114,887.00 | $ 114,887.00 | $ 50,000.00 | $ 50,000.00 | $ 106,567.74 | $ 106,567.74 |
| 12 | Switching, Conduit, and Wiring | 1 | LS | $ 22,497.38 | $ 22,497.38 | $ 4,900.00 | $ 4,900.00 | $ 21,915.00 | $ 21,915.00 | $ 35,000.00 | $ 35,000.00 | $ 19,000.67 | $ 19,000.67 |
| TOTAL | $ 957,056.29 | $ 1,197,841.00 | $ 1,264,597.00 | $ 1,360,640.00 | $ 1,583,753.16 |
Sheet2
File details come from the government source that posted it. Updated .