This is a preliminary results spreadsheet related to the Oregon Department of Transportation's chip seal pavement preservation project along US 95 from the Idaho State Line to Rome Hill in Malheur County. The project encompasses approximately 36.47 miles of roadway (mileposts 0.00 to 51.5) and involves applying a single-application emulsified asphalt chip seal treatment to approximately 694,000 square yards of pavement surface. The scope includes 22 line items covering mobilization, traffic control installation, permanent pavement markings, signage, flagging operations, and surface treatment activities. The bid submission deadline is October 23, 2025, with electronic submissions required through the OregonBuys eProcurement system. Work cannot commence earlier than April 1, 2026, with substantial completion required by August 15, 2026, and final completion by August 31, 2026.
Contractors must submit unit pricing for all line items and provide bid security equal to 10% of the total bid amount. The project is subject to state prevailing wage requirements and includes a workforce development mandate requiring contractors to employ apprentices for 12% of work hours in apprenticeable occupations, with the same requirement applying to subcontractors with contracts valued at $750,000 or more. Buy America provisions require all iron, steel, and manufactured products to be produced in the United States. Two ODOT-owned material sources—Burns Junction Quarry and Sheaville Quarry—are identified as potential suppliers. Liquidated damages are assessed at $1,100 per calendar day for delays in substantial completion and $500 per 15-minute increment for unauthorized lane closures. The project area experiences an Annual Average Daily Traffic of 1,932 vehicles with 53.8% heavy commercial traffic, indicating significant transportation infrastructure investment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00014905 Addendum 1.docx | DOCX document | |
| 00014905 Attachment A Special Provisions.pdf | ||
| 00014905 Invitation.To.Bid.docx | DOCX document | |
| 00014905 Attachment E Apprenticeship Requirements.docx | DOCX document | |
| 00014905 Attachment C Bid Pricing Form.xlsx | XLSX spreadsheet | |
| 00014905 Attachment D Material Source Narrative.pdf | ||
| 00014905 Attachment B Plans..pdf | ||
| 00014906 Specifications V2.doc | DOC document | |
| 00014905 Intent To Award.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 10/30/25 | ||||||||
| ITB No. | S-73000-00014905 | BIDDER | |||||||
| NAME: | Knife River Corporation - Mountain West | Granite Construction Company | JAL Construction Inc | Sierra Santa Fe Corporation | VSS International Inc | Doolittle Construction LLC | American Rock Products | ||
| Bid Closing: | 10/30/2025 @ 10:00AM | ||||||||
| Description: | US 95 Idaho State Line - Rome Chip Seal Project | ||||||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | MOBILIZATION | 1.0 | LS | $ 25,000.00 | $ 25,000.00 | $ 250,000.00 | $ 250,000.00 | $ 285,000.00 | $ 285,000.00 | $ 256,784.00 | $ 256,784.00 | $ 178,060.24 | $ 178,060.24 | $ 350,000.00 | $ 350,000.00 | $ 240,000.00 | $ 240,000.00 | $ - 0 | |
| 2 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | 1.0 | LS | $ 32,994.00 | $ 32,994.00 | $ 85,000.00 | $ 85,000.00 | $ 42,000.00 | $ 42,000.00 | $ 80,000.00 | $ 80,000.00 | $ 407,864.16 | $ 407,864.16 | $ 186,075.00 | $ 186,075.00 | $ 185,000.00 | $ 185,000.00 | $ - 0 | |
| 3 | TEMPORARY SIGNS | 3400.0 | SQFT | $ 12.00 | $ 40,800.00 | $ 12.50 | $ 42,500.00 | $ 35.00 | $ 119,000.00 | $ 34.50 | $ 117,300.00 | $ 15.66 | $ 53,244.00 | $ 28.00 | $ 95,200.00 | $ 16.00 | $ 54,400.00 | $ - 0 | |
| 4 | PORTABLE CHANGEABLE MESSAGE SIGNS | 2.0 | EACH | $ 1,500.00 | $ 3,000.00 | $ 2,500.00 | $ 5,000.00 | $ 3,600.00 | $ 7,200.00 | $ 2,000.00 | $ 4,000.00 | $ 5,184.00 | $ 10,368.00 | $ 5,000.00 | $ 10,000.00 | $ 10,000.00 | $ 20,000.00 | $ - 0 | |
| 5 | FLAGGERS | 1000.0 | HOUR | $ 77.00 | $ 77,000.00 | $ 105.00 | $ 105,000.00 | $ 105.00 | $ 105,000.00 | $ 106.00 | $ 106,000.00 | $ 103.68 | $ 103,680.00 | $ 100.00 | $ 100,000.00 | $ 151.00 | $ 151,000.00 | $ - 0 | |
| 6 | FLAGGER STATION LIGHTING | 2.0 | EACH | $ 8,550.00 | $ 17,100.00 | $ 550.00 | $ 1,100.00 | $ 1,500.00 | $ 3,000.00 | $ 2,000.00 | $ 4,000.00 | $ 1,512.00 | $ 3,024.00 | $ 1,000.00 | $ 2,000.00 | $ 6,500.00 | $ 13,000.00 | $ - 0 | |
| 7 | PILOT CARS | 500.0 | HOUR | $ 114.00 | $ 57,000.00 | $ 105.00 | $ 52,500.00 | $ 125.00 | $ 62,500.00 | $ 28.50 | $ 14,250.00 | $ 103.68 | $ 51,840.00 | $ 125.00 | $ 62,500.00 | $ 350.00 | $ 175,000.00 | $ - 0 | |
| 8 | AUTOMATED FLAGGER ASSISTANCE DEVICE | 4.0 | EACH | $ 660.00 | $ 2,640.00 | $ 2,500.00 | $ 10,000.00 | $ 3,000.00 | $ 12,000.00 | $ 2,500.00 | $ 10,000.00 | $ 5,400.00 | $ 21,600.00 | $ 2,000.00 | $ 8,000.00 | $ 6,500.00 | $ 26,000.00 | $ - 0 | |
| 9 | TEMPORARY BARRICADES, TYPE III | 2.0 | EACH | $ 50.00 | $ 100.00 | $ 100.00 | $ 200.00 | $ 200.00 | $ 400.00 | $ 218.00 | $ 436.00 | $ 486.00 | $ 972.00 | $ 150.00 | $ 300.00 | $ 129.00 | $ 258.00 | $ - 0 | |
| 10 | TEMPORARY PLASTIC DRUMS | 12.0 | EACH | $ 20.00 | $ 240.00 | $ 50.00 | $ 600.00 | $ 40.00 | $ 480.00 | $ 50.00 | $ 600.00 | $ 162.00 | $ 1,944.00 | $ 50.00 | $ 600.00 | $ 23.00 | $ 276.00 | $ - 0 | |
| 11 | TEMPORARY FLEXIBLE PAVEMENT MARKERS | 15000.0 | EACH | $ 1.85 | $ 27,750.00 | $ 1.00 | $ 15,000.00 | $ 2.00 | $ 30,000.00 | $ 2.50 | $ 37,500.00 | $ 3.24 | $ 48,600.00 | $ 2.50 | $ 37,500.00 | $ 0.70 | $ 10,500.00 | $ - 0 | |
| 12 | TEMPORARY TRANSVERSE RUMBLE STRIPS | 132.0 | FOOT | $ 33.00 | $ 4,356.00 | $ 80.00 | $ 10,560.00 | $ 90.00 | $ 11,880.00 | $ 200.00 | $ 26,400.00 | $ 108.00 | $ 14,256.00 | $ 25.00 | $ 3,300.00 | $ 52.00 | $ 6,864.00 | $ - 0 | |
| 13 | BAR REMOVAL | 400.0 | SQFT | $ 10.00 | $ 4,000.00 | $ 8.00 | $ 3,200.00 | $ 16.25 | $ 6,500.00 | $ 30.00 | $ 12,000.00 | $ 23.76 | $ 9,504.00 | $ 10.00 | $ 4,000.00 | $ 10.00 | $ 4,000.00 | $ - 0 | |
| 14 | EROSION CONTROL | 1.0 | LS | $ 5,500.00 | $ 5,500.00 | $ 100.00 | $ 100.00 | $ 500.00 | $ 500.00 | $ 5,000.00 | $ 5,000.00 | $ 27,000.00 | $ 27,000.00 | $ 6,500.00 | $ 6,500.00 | $ 5,000.00 | $ 5,000.00 | $ - 0 | |
| 15 | POLLUTION CONTROL PLAN | 1.0 | LS | $ 5,500.00 | $ 5,500.00 | $ 100.00 | $ 100.00 | $ 500.00 | $ 500.00 | $ 5,000.00 | $ 5,000.00 | $ 5,400.00 | $ 5,400.00 | $ 6,500.00 | $ 6,500.00 | $ 1,000.00 | $ 1,000.00 | $ - 0 | |
| 16 | CONSTRUCTION SURVEY WORK | 1.0 | LS | $ 17,000.00 | $ 17,000.00 | $ 7,500.00 | $ 7,500.00 | $ 40,000.00 | $ 40,000.00 | $ 50,000.00 | $ 50,000.00 | $ 47,503.80 | $ 47,503.80 | $ 60,000.00 | $ 60,000.00 | $ 16,200.00 | $ 16,200.00 | $ - 0 | |
| 17 | EMULSIFIED ASPHALT IN FOG COAT | 370.0 | TON | $ 750.00 | $ 277,500.00 | $ 350.00 | $ 129,500.00 | $ 1.00 | $ 370.00 | $ 1.00 | $ 370.00 | $ 295.00 | $ 109,150.00 | $ 300.00 | $ 111,000.00 | $ 1,500.00 | $ 555,000.00 | $ - 0 | |
| 18 | PLACEMENT OF EMULSIFIED ASPHALT CHIP SEAL | 694000.0 | SQYD | $ 2.43 | $ 1,686,420.00 | $ 1.13 | $ 784,220.00 | $ 1.50 | $ 1,041,000.00 | $ 2.56 | $ 1,776,640.00 | $ 2.30 | $ 1,596,200.00 | $ 2.60 | $ 1,804,400.00 | $ 1.82 | $ 1,263,080.00 | $ - 0 | |
| 19 | ASPHALT IN EMULSIFIED ASPHALT CHIP SEAL | 1500.0 | TON | $ 1.00 | $ 1,500.00 | $ 670.00 | $ 1,005,000.00 | $ 630.00 | $ 945,000.00 | $ 150.00 | $ 225,000.00 | $ 450.00 | $ 675,000.00 | $ 425.00 | $ 637,500.00 | $ 700.00 | $ 1,050,000.00 | $ - 0 | |
| 20 | EXTRA FOR EMULSIFIED ASPHALT CHIP SEAL APPROACHES | 59.0 | EACH | $ 110.00 | $ 6,490.00 | $ 400.00 | $ 23,600.00 | $ 500.00 | $ 29,500.00 | $ 500.00 | $ 29,500.00 | $ 850.00 | $ 50,150.00 | $ 500.00 | $ 29,500.00 | $ 445.00 | $ 26,255.00 | $ - 0 | |
| 21 | LONGITUDINAL PAVEMENT MARKINGS - PAINT | 575000.0 | FOOT | $ 0.27 | $ 155,250.00 | $ 0.23 | $ 132,250.00 | $ 0.25 | $ 143,750.00 | $ 0.30 | $ 172,500.00 | $ 0.30 | $ 172,500.00 | $ 0.23 | $ 132,250.00 | $ 0.30 | $ 172,500.00 | $ - 0 | |
| 22 | PAVEMENT BAR, TYPE B | 230.0 | SQFT | $ 14.00 | $ 3,220.00 | $ 12.50 | $ 2,875.00 | $ 12.50 | $ 2,875.00 | $ 23.90 | $ 5,497.00 | $ 23.76 | $ 5,464.80 | $ 12.50 | $ 2,875.00 | $ 16.00 | $ 3,680.00 | $ - 0 | |
| TOTAL | $ 2,450,360.00 | $ 2,665,805.00 | $ 2,888,455.00 | $ 2,938,777.00 | $ 3,593,325.00 | $ 3,650,000.00 | $ 3,979,013.00 | $ - 0 |