About this file

This is a preliminary results spreadsheet related to the Oregon Department of Transportation's chip seal pavement preservation project along US 95 from the Idaho State Line to Rome Hill in Malheur County. The project encompasses approximately 36.47 miles of roadway (mileposts 0.00 to 51.5) and involves applying a single-application emulsified asphalt chip seal treatment to approximately 694,000 square yards of pavement surface. The scope includes 22 line items covering mobilization, traffic control installation, permanent pavement markings, signage, flagging operations, and surface treatment activities. The bid submission deadline is October 23, 2025, with electronic submissions required through the OregonBuys eProcurement system. Work cannot commence earlier than April 1, 2026, with substantial completion required by August 15, 2026, and final completion by August 31, 2026.

Contractors must submit unit pricing for all line items and provide bid security equal to 10% of the total bid amount. The project is subject to state prevailing wage requirements and includes a workforce development mandate requiring contractors to employ apprentices for 12% of work hours in apprenticeable occupations, with the same requirement applying to subcontractors with contracts valued at $750,000 or more. Buy America provisions require all iron, steel, and manufactured products to be produced in the United States. Two ODOT-owned material sources—Burns Junction Quarry and Sheaville Quarry—are identified as potential suppliers. Liquidated damages are assessed at $1,100 per calendar day for delays in substantial completion and $500 per 15-minute increment for unauthorized lane closures. The project area experiences an Annual Average Daily Traffic of 1,932 vehicles with 53.8% heavy commercial traffic, indicating significant transportation infrastructure investment.

View the file

Other files

File Type Posted
00014905 Addendum 1.docx DOCX document
00014905 Attachment A Special Provisions.pdf PDF
00014905 Invitation.To.Bid.docx DOCX document
00014905 Attachment E Apprenticeship Requirements.docx DOCX document
00014905 Attachment C Bid Pricing Form.xlsx XLSX spreadsheet
00014905 Attachment D Material Source Narrative.pdf PDF
00014905 Attachment B Plans..pdf PDF
00014906 Specifications V2.doc DOC document
00014905 Intent To Award.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:10/30/25
ITB No.S-73000-00014905BIDDER
NAME:Knife River Corporation - Mountain WestGranite Construction CompanyJAL Construction IncSierra Santa Fe CorporationVSS International IncDoolittle Construction LLCAmerican Rock Products
Bid Closing:10/30/2025 @ 10:00AM
Description:US 95 Idaho State Line - Rome Chip Seal Project
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1MOBILIZATION1.0LS$ 25,000.00$ 25,000.00$ 250,000.00$ 250,000.00$ 285,000.00$ 285,000.00$ 256,784.00$ 256,784.00$ 178,060.24$ 178,060.24$ 350,000.00$ 350,000.00$ 240,000.00$ 240,000.00$ - 0
2TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC1.0LS$ 32,994.00$ 32,994.00$ 85,000.00$ 85,000.00$ 42,000.00$ 42,000.00$ 80,000.00$ 80,000.00$ 407,864.16$ 407,864.16$ 186,075.00$ 186,075.00$ 185,000.00$ 185,000.00$ - 0
3TEMPORARY SIGNS3400.0SQFT$ 12.00$ 40,800.00$ 12.50$ 42,500.00$ 35.00$ 119,000.00$ 34.50$ 117,300.00$ 15.66$ 53,244.00$ 28.00$ 95,200.00$ 16.00$ 54,400.00$ - 0
4PORTABLE CHANGEABLE MESSAGE SIGNS2.0EACH$ 1,500.00$ 3,000.00$ 2,500.00$ 5,000.00$ 3,600.00$ 7,200.00$ 2,000.00$ 4,000.00$ 5,184.00$ 10,368.00$ 5,000.00$ 10,000.00$ 10,000.00$ 20,000.00$ - 0
5FLAGGERS1000.0HOUR$ 77.00$ 77,000.00$ 105.00$ 105,000.00$ 105.00$ 105,000.00$ 106.00$ 106,000.00$ 103.68$ 103,680.00$ 100.00$ 100,000.00$ 151.00$ 151,000.00$ - 0
6FLAGGER STATION LIGHTING2.0EACH$ 8,550.00$ 17,100.00$ 550.00$ 1,100.00$ 1,500.00$ 3,000.00$ 2,000.00$ 4,000.00$ 1,512.00$ 3,024.00$ 1,000.00$ 2,000.00$ 6,500.00$ 13,000.00$ - 0
7PILOT CARS500.0HOUR$ 114.00$ 57,000.00$ 105.00$ 52,500.00$ 125.00$ 62,500.00$ 28.50$ 14,250.00$ 103.68$ 51,840.00$ 125.00$ 62,500.00$ 350.00$ 175,000.00$ - 0
8AUTOMATED FLAGGER ASSISTANCE DEVICE4.0EACH$ 660.00$ 2,640.00$ 2,500.00$ 10,000.00$ 3,000.00$ 12,000.00$ 2,500.00$ 10,000.00$ 5,400.00$ 21,600.00$ 2,000.00$ 8,000.00$ 6,500.00$ 26,000.00$ - 0
9TEMPORARY BARRICADES, TYPE III2.0EACH$ 50.00$ 100.00$ 100.00$ 200.00$ 200.00$ 400.00$ 218.00$ 436.00$ 486.00$ 972.00$ 150.00$ 300.00$ 129.00$ 258.00$ - 0
10TEMPORARY PLASTIC DRUMS12.0EACH$ 20.00$ 240.00$ 50.00$ 600.00$ 40.00$ 480.00$ 50.00$ 600.00$ 162.00$ 1,944.00$ 50.00$ 600.00$ 23.00$ 276.00$ - 0
11TEMPORARY FLEXIBLE PAVEMENT MARKERS15000.0EACH$ 1.85$ 27,750.00$ 1.00$ 15,000.00$ 2.00$ 30,000.00$ 2.50$ 37,500.00$ 3.24$ 48,600.00$ 2.50$ 37,500.00$ 0.70$ 10,500.00$ - 0
12TEMPORARY TRANSVERSE RUMBLE STRIPS132.0FOOT$ 33.00$ 4,356.00$ 80.00$ 10,560.00$ 90.00$ 11,880.00$ 200.00$ 26,400.00$ 108.00$ 14,256.00$ 25.00$ 3,300.00$ 52.00$ 6,864.00$ - 0
13BAR REMOVAL400.0SQFT$ 10.00$ 4,000.00$ 8.00$ 3,200.00$ 16.25$ 6,500.00$ 30.00$ 12,000.00$ 23.76$ 9,504.00$ 10.00$ 4,000.00$ 10.00$ 4,000.00$ - 0
14EROSION CONTROL1.0LS$ 5,500.00$ 5,500.00$ 100.00$ 100.00$ 500.00$ 500.00$ 5,000.00$ 5,000.00$ 27,000.00$ 27,000.00$ 6,500.00$ 6,500.00$ 5,000.00$ 5,000.00$ - 0
15POLLUTION CONTROL PLAN1.0LS$ 5,500.00$ 5,500.00$ 100.00$ 100.00$ 500.00$ 500.00$ 5,000.00$ 5,000.00$ 5,400.00$ 5,400.00$ 6,500.00$ 6,500.00$ 1,000.00$ 1,000.00$ - 0
16CONSTRUCTION SURVEY WORK1.0LS$ 17,000.00$ 17,000.00$ 7,500.00$ 7,500.00$ 40,000.00$ 40,000.00$ 50,000.00$ 50,000.00$ 47,503.80$ 47,503.80$ 60,000.00$ 60,000.00$ 16,200.00$ 16,200.00$ - 0
17EMULSIFIED ASPHALT IN FOG COAT370.0TON$ 750.00$ 277,500.00$ 350.00$ 129,500.00$ 1.00$ 370.00$ 1.00$ 370.00$ 295.00$ 109,150.00$ 300.00$ 111,000.00$ 1,500.00$ 555,000.00$ - 0
18PLACEMENT OF EMULSIFIED ASPHALT CHIP SEAL694000.0SQYD$ 2.43$ 1,686,420.00$ 1.13$ 784,220.00$ 1.50$ 1,041,000.00$ 2.56$ 1,776,640.00$ 2.30$ 1,596,200.00$ 2.60$ 1,804,400.00$ 1.82$ 1,263,080.00$ - 0
19ASPHALT IN EMULSIFIED ASPHALT CHIP SEAL1500.0TON$ 1.00$ 1,500.00$ 670.00$ 1,005,000.00$ 630.00$ 945,000.00$ 150.00$ 225,000.00$ 450.00$ 675,000.00$ 425.00$ 637,500.00$ 700.00$ 1,050,000.00$ - 0
20EXTRA FOR EMULSIFIED ASPHALT CHIP SEAL APPROACHES59.0EACH$ 110.00$ 6,490.00$ 400.00$ 23,600.00$ 500.00$ 29,500.00$ 500.00$ 29,500.00$ 850.00$ 50,150.00$ 500.00$ 29,500.00$ 445.00$ 26,255.00$ - 0
21LONGITUDINAL PAVEMENT MARKINGS - PAINT575000.0FOOT$ 0.27$ 155,250.00$ 0.23$ 132,250.00$ 0.25$ 143,750.00$ 0.30$ 172,500.00$ 0.30$ 172,500.00$ 0.23$ 132,250.00$ 0.30$ 172,500.00$ - 0
22PAVEMENT BAR, TYPE B230.0SQFT$ 14.00$ 3,220.00$ 12.50$ 2,875.00$ 12.50$ 2,875.00$ 23.90$ 5,497.00$ 23.76$ 5,464.80$ 12.50$ 2,875.00$ 16.00$ 3,680.00$ - 0
TOTAL$ 2,450,360.00$ 2,665,805.00$ 2,888,455.00$ 2,938,777.00$ 3,593,325.00$ 3,650,000.00$ 3,979,013.00$ - 0