00014905 Intent To Award.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
US95: Idaho State Line - Rome Hill Chip Seal Project
Solicitation number
S-73000-00014905
Issued by
Marion County, Oregon

About this file

This is a Notice of Intent to Award issued by the Oregon Department of Transportation (ODOT) for ITB No. S-73000-00014905, a pavement preservation chip seal project along US 95 from the Idaho State Line to Rome spanning approximately 36.47 miles in Malheur County. The project involves applying emulsified asphalt chip seal treatment across approximately 694,000 square yards of roadway surface, with associated traffic management, temporary protection, signage, flagging services, and permanent pavement markings. The bid closing occurred on October 30, 2025, at 10:00 AM, with bids received from seven contractors: Granite Construction Company, JAL Construction Inc, Sierra Santa Fe Corporation, VSS International Inc, Doolittle Construction LLC, American Rock Products, and one additional bidder. ODOT has issued its notice of intent to award the contract to Granite Construction Company as the lowest responsive bidder. Aggrieved bidders have five calendar days from the issuance date of November 3, 2025, to file a protest. The project work can commence no earlier than April 1, 2026, with substantial completion required by August 15, 2026, and final completion by August 31, 2026.

Granite Construction Company's winning bid total is $2,665,805.00, representing the lowest of the seven bids submitted, which ranged from $2,665,805.00 to $3,979,013.00. The bid tabulation specifies 22 line items with unit pricing for mobilization ($250,000.00), temporary traffic protection ($85,000.00), signage, flagging, pilot cars, pavement markings, and chip seal application at $1.13 per square yard. The project requires bid security equal to ten percent of the total bid amount and is subject to prevailing wage requirements and Buy America provisions. Contractors must comply with workforce development requirements mandating apprentices perform twelve percent of work hours in apprenticeable occupations, with subcontractors holding contracts valued at $750,000 or more subject to the same apprenticeship guidelines. Liquidated damages are assessed at $1,100 per calendar day for delays in achieving substantial completion and $500 per 15-minute increment for unauthorized lane closures.

View the file

Other files

File Type Posted
00014905 Preliminary Results.xlsx XLSX spreadsheet
00014905 Addendum 1.docx DOCX document
00014905 Attachment A Special Provisions.pdf PDF
00014905 Invitation.To.Bid.docx DOCX document
00014905 Attachment E Apprenticeship Requirements.docx DOCX document
00014905 Attachment C Bid Pricing Form.xlsx XLSX spreadsheet
00014905 Attachment D Material Source Narrative.pdf PDF
00014905 Attachment B Plans..pdf PDF
00014906 Specifications V2.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:11/3/25
ITB No.S-73000-00014905BIDDER
NAME:Granite Construction CompanyJAL Construction IncSierra Santa Fe CorporationVSS International IncDoolittle Construction LLCAmerican Rock Products
Bid Closing:10/30/2025 @ 10:00AM
Description:US 95 Idaho State Line - Rome Chip Seal Project
This bid tabulation shall serve as ODOT's notice of intent to award a contract to (Granite Construction Company). Aggrieved Bidders have 5 calendar days from the issued date shown above to protest the intent to award.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1MOBILIZATION1.0LS$ 250,000.00$ 250,000.00$ 285,000.00$ 285,000.00$ 256,784.00$ 256,784.00$ 178,060.24$ 178,060.24$ 350,000.00$ 350,000.00$ 240,000.00$ 240,000.00$ - 0
2TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC1.0LS$ 85,000.00$ 85,000.00$ 42,000.00$ 42,000.00$ 80,000.00$ 80,000.00$ 407,864.16$ 407,864.16$ 186,075.00$ 186,075.00$ 185,000.00$ 185,000.00$ - 0
3TEMPORARY SIGNS3400.0SQFT$ 12.50$ 42,500.00$ 35.00$ 119,000.00$ 34.50$ 117,300.00$ 15.66$ 53,244.00$ 28.00$ 95,200.00$ 16.00$ 54,400.00$ - 0
4PORTABLE CHANGEABLE MESSAGE SIGNS2.0EACH$ 2,500.00$ 5,000.00$ 3,600.00$ 7,200.00$ 2,000.00$ 4,000.00$ 5,184.00$ 10,368.00$ 5,000.00$ 10,000.00$ 10,000.00$ 20,000.00$ - 0
5FLAGGERS1000.0HOUR$ 105.00$ 105,000.00$ 105.00$ 105,000.00$ 106.00$ 106,000.00$ 103.68$ 103,680.00$ 100.00$ 100,000.00$ 151.00$ 151,000.00$ - 0
6FLAGGER STATION LIGHTING2.0EACH$ 550.00$ 1,100.00$ 1,500.00$ 3,000.00$ 2,000.00$ 4,000.00$ 1,512.00$ 3,024.00$ 1,000.00$ 2,000.00$ 6,500.00$ 13,000.00$ - 0
7PILOT CARS500.0HOUR$ 105.00$ 52,500.00$ 125.00$ 62,500.00$ 28.50$ 14,250.00$ 103.68$ 51,840.00$ 125.00$ 62,500.00$ 350.00$ 175,000.00$ - 0
8AUTOMATED FLAGGER ASSISTANCE DEVICE4.0EACH$ 2,500.00$ 10,000.00$ 3,000.00$ 12,000.00$ 2,500.00$ 10,000.00$ 5,400.00$ 21,600.00$ 2,000.00$ 8,000.00$ 6,500.00$ 26,000.00$ - 0
9TEMPORARY BARRICADES, TYPE III2.0EACH$ 100.00$ 200.00$ 200.00$ 400.00$ 218.00$ 436.00$ 486.00$ 972.00$ 150.00$ 300.00$ 129.00$ 258.00$ - 0
10TEMPORARY PLASTIC DRUMS12.0EACH$ 50.00$ 600.00$ 40.00$ 480.00$ 50.00$ 600.00$ 162.00$ 1,944.00$ 50.00$ 600.00$ 23.00$ 276.00$ - 0
11TEMPORARY FLEXIBLE PAVEMENT MARKERS15000.0EACH$ 1.00$ 15,000.00$ 2.00$ 30,000.00$ 2.50$ 37,500.00$ 3.24$ 48,600.00$ 2.50$ 37,500.00$ 0.70$ 10,500.00$ - 0
12TEMPORARY TRANSVERSE RUMBLE STRIPS132.0FOOT$ 80.00$ 10,560.00$ 90.00$ 11,880.00$ 200.00$ 26,400.00$ 108.00$ 14,256.00$ 25.00$ 3,300.00$ 52.00$ 6,864.00$ - 0
13BAR REMOVAL400.0SQFT$ 8.00$ 3,200.00$ 16.25$ 6,500.00$ 30.00$ 12,000.00$ 23.76$ 9,504.00$ 10.00$ 4,000.00$ 10.00$ 4,000.00$ - 0
14EROSION CONTROL1.0LS$ 100.00$ 100.00$ 500.00$ 500.00$ 5,000.00$ 5,000.00$ 27,000.00$ 27,000.00$ 6,500.00$ 6,500.00$ 5,000.00$ 5,000.00$ - 0
15POLLUTION CONTROL PLAN1.0LS$ 100.00$ 100.00$ 500.00$ 500.00$ 5,000.00$ 5,000.00$ 5,400.00$ 5,400.00$ 6,500.00$ 6,500.00$ 1,000.00$ 1,000.00$ - 0
16CONSTRUCTION SURVEY WORK1.0LS$ 7,500.00$ 7,500.00$ 40,000.00$ 40,000.00$ 50,000.00$ 50,000.00$ 47,503.80$ 47,503.80$ 60,000.00$ 60,000.00$ 16,200.00$ 16,200.00$ - 0
17EMULSIFIED ASPHALT IN FOG COAT370.0TON$ 350.00$ 129,500.00$ 1.00$ 370.00$ 1.00$ 370.00$ 295.00$ 109,150.00$ 300.00$ 111,000.00$ 1,500.00$ 555,000.00$ - 0
18PLACEMENT OF EMULSIFIED ASPHALT CHIP SEAL694000.0SQYD$ 1.13$ 784,220.00$ 1.50$ 1,041,000.00$ 2.56$ 1,776,640.00$ 2.30$ 1,596,200.00$ 2.60$ 1,804,400.00$ 1.82$ 1,263,080.00$ - 0
19ASPHALT IN EMULSIFIED ASPHALT CHIP SEAL1500.0TON$ 670.00$ 1,005,000.00$ 630.00$ 945,000.00$ 150.00$ 225,000.00$ 450.00$ 675,000.00$ 425.00$ 637,500.00$ 700.00$ 1,050,000.00$ - 0
20EXTRA FOR EMULSIFIED ASPHALT CHIP SEAL APPROACHES59.0EACH$ 400.00$ 23,600.00$ 500.00$ 29,500.00$ 500.00$ 29,500.00$ 850.00$ 50,150.00$ 500.00$ 29,500.00$ 445.00$ 26,255.00$ - 0
21LONGITUDINAL PAVEMENT MARKINGS - PAINT575000.0FOOT$ 0.23$ 132,250.00$ 0.25$ 143,750.00$ 0.30$ 172,500.00$ 0.30$ 172,500.00$ 0.23$ 132,250.00$ 0.30$ 172,500.00$ - 0
22PAVEMENT BAR, TYPE B230.0SQFT$ 12.50$ 2,875.00$ 12.50$ 2,875.00$ 23.90$ 5,497.00$ 23.76$ 5,464.80$ 12.50$ 2,875.00$ 16.00$ 3,680.00$ - 0
TOTAL$ 2,665,805.00$ 2,888,455.00$ 2,938,777.00$ 3,593,325.00$ 3,650,000.00$ 3,979,013.00$ - 0