This document is an Attachment G - Anticipated Task List for a comprehensive transportation project, likely for the Oregon Department of Transportation (ODOT). The document outlines an extensive menu of services spanning 22 primary tasks, including project management, planning, survey, environmental services, public involvement, utilities coordination, geotechnical services, pavement design, hydraulics, roadway design, traffic engineering, erosion control, right of way services, and design acceptance and PS&E (Plans, Specifications, and Estimate) preparation. The task list is highly detailed, with many tasks having multiple sub-tasks, and several tasks are marked as [RESERVED], indicating potential future scope expansion.
The task list suggests a complex infrastructure project involving multiple technical disciplines, with a strong emphasis on environmental compliance, design phases, and comprehensive project documentation. Many tasks include contingency elements, indicating flexibility for potential scope changes. The document appears to be a comprehensive service framework that allows for a wide range of potential engineering and planning activities, with specific focus on areas like cultural resources, wetlands and waters delineation, biological services, and detailed design stages. The breadth of tasks implies a significant transportation infrastructure project that requires extensive interdisciplinary coordination and technical expertise.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00014024_Attachment B_Key Staff Resume Form.docx | DOCX document | |
| 00014024_Attachment C_Sample Projects.doc | DOC document | |
| 00014024_Attachment F_Additional Documentation.pdf | ||
| 00014024_Mini-RFP_Final.docx | DOCX document | |
| RFP CM GC Services Award Update 2025-08-12.pdf | ||
| 00014024_Attachment D _DDIR_Fairview-Sumner.pdf | ||
| 00014024_Attachment A_Proposal Cover Sheet.doc | DOC document | |
| 00014024_Addendum 1_Final.pdf | ||
| 00014024_Attachment E_DDIR_Sitkum Lane.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G – ANTICIPATED TASK LIST
Task 1 – Project Management Task 1.1 – Project Management and Coordination Task 1.2 – Progress Reports Task 1.3 – Project Schedule and Schedule Updates Task 1.4 – Meetings Task 1.4.1 – Kick-off Meeting Task 1.4.2 – Project Development Team (“PDT”) Meetings Task 1.4.3 – Project Coordination Meetings [RESERVED] Task 1.4.4 – Project Subteam Meetings [RESERVED] Task 1.4.4B – Bridge Design Subteam Meetings [RESERVED] Task 1.4.5 – Project Site Visit Meeting Task 1.4.6A – Mobility Advisory Committee Meetings (“MAC”) [RESERVED] Task 1.4.6B – Mobility Advisory Committee Meetings (“MAC”) [RESERVED] Task 1.4.7 – Design Verification Workshop (“DVW”) [RESERVED] Task 1.4.8 – Cost Risk Assessment (“CRA”) [RESERVED] Task 1.4.9A – Design Acceptance Workshop (“DAW”) [RESERVED] Task 1.4.9B – Design Milestone Package Submittal Review Meetings Task 1.4.10 – Preliminary Plans Review Meeting [RESERVED] Task 1.4.11 – Advance Plans Review Meeting [RESERVED] Task 1.4.12 – Final Plans Review Meeting [RESERVED] Task 1.4.13 – Pre-PS&E Package Submittal Meeting [RESERVED] Task 1.4.14 – PS&E Review Meetings [RESERVED] Task 1.4.15 – Computer Assisted Drawing and Design (“CADD”) Team Meetings [RESERVED] Task 1.5 – Construction Support [RESERVED] Task 1.6 – Risk Management [RESERVED] Task 1.7 – Value Engineering (“VE”) Study [RESERVED] Task 1.8 – Construction Risk Management Transition [RESERVED] Task 1.9 – Quality Assurance/Quality Control (“QA/QC”) Task 1.9.1 – Quality Assurance [RESERVED] Task 1.9.2 – QA/QC Quality Reviews Task 1.10 – Bridge Design CAD Services [RESERVED]
Task 2 – Project Initiation [RESERVED]
Task 3 – Planning Services Task 3.1 – Asset Investment Strategy and Strategic Plan [RESERVED] Task 3.2 – System Management [RESERVED] Task 3.3 – Business Case [RESERVED] Task 3.4 – Land Use Task 3.4.1 – Land Use Permits Task 3.4.1.1 – Land Use and Transportation Plans and Projects Review [RESERVED] Task 3.4.1.2 – Land Use Permit Research Task 3.4.1.3 – Pre-Application Conference [RESERVED] Task C3.4.1.4 – Local Agency Permit Applications [Contingency Task] Task 3.4.1.5 – Completeness Review Response [RESERVED] Task 3.4.1.6 – Final Decision and Conditions of Approval [RESERVED] Task 3.4.2 – Land Use Report [RESERVED] Task 3.5 – Planning Services Design Coordination [RESERVED] Task 3.6 – Planning Services Quality Reviews [RESERVED] Task 3.7 – Local Agency Technical Scope Sheet [RESERVED] Task 3.8 – Alternatives Analysis [RESERVED]
Task 4 – Scoping [RESERVED]
Task 5 – Survey Task 5.1 – Project Control Task 5.1.1 – Additional Project Control for Changes to Project Location [RESERVED] Task 5.2 –CRR Task 5.2.1– Survey Filing Map (“SFM”) Task 5.3 – Topographic Data and Basemap Task 5.3.1 – Survey Project Initiation [RESERVED] Task 5.4 – [RESERVED] Task 5.5 – Monumentation Surveys Task 5.6 – Right of Way (“ROW”) Engineering (Mapping and Descriptions) Task 5.6.1 – Proposed ROW Design and Layout Task 5.6.2 – Active ROW Acquisition Map Task 5.6.3 – ROW Addendum, Descriptions, and Sketch Maps Task 5.6.4 - ROW Descriptions Revisions due to Project Scope Changes [RESERVED] Task 5.6.5 – Railroad Exhibit Maps [RESERVED] Task 5.6.6 – Forest Service Plat Maps [RESERVED] Task 5.6.7 – Bureau of Land Management (“BLM”) Plat Maps [RESERVED] Task 5.7 – Staking [RESERVED] Task 5.8 – Pre-Construction Survey [RESERVED] Task 5.9 – Survey Design Coordination [RESERVED] Task 5.10– Survey Quality Reviews [RESERVED]
Task 6 – Environmental Services Task 6.1 – Pre-National Environmental Policy Act (“NEPA”) and Planning and Environment Linkages (“PEL”) Activities [RESERVED] Task 6.2 – NEPA - Categorical Exclusion (“CE”) or Programmatic CE (“PCE”) Documentation Task 6.2.1 – Environmental Prospectus (“EP”) [RESERVED] Task 6.2.2 – Draft PCE Determination Form Task 6.2.3 – PCE Approval or CE Closeout Documentation Task 6.3 – NEPA Environmental Assessment (“EA”) or Environmental Impact Statement (“EIS”) Analysis and Documentation Task 6.4 – NEPA Re-evaluation [RESERVED] Task 6.5 – Land Use (includes Coastal Zone, Farmland, and Wild and Scenic Rivers) Task 6.6 – Environmental Justice (“EJ”) [RESERVED] Task 6.7 – Socioeconomic Analysis [RESERVED] Task 6.8 – Parks and Recreation Resources [RESERVED] Task 6.9 – Historic Resources Task 6.9.1 – Historic Resources Baseline Report Task 6.9.2 – Section 106 DOE [RESERVED] Task 6.9.3 – Project Section 106 FOE Report(s) [RESERVED] Task 6.10 – Cultural Resources – Archaeology Task 6.10.1 – Archaeological Resources Literature Review, Field Reconnaissance and Baseline Report Task 6.10.2 – Cultural Resources Planning Study [RESERVED] Task 6.10.3 – Phase I Archaeological Investigation with Technical Report Task 6.10.3.1 – Literature Review Task 6.10.3.2 – Pedestrian Survey Task 6.10.3.3 – Subsurface Exploratory Probing and Archaeological Permit Application Task 6.10.3.4 – Phase I Technical Report Task C6.10.4 – Phase II Archaeological Investigation [Contingency Task] Task 6.10.4.1 – Archaeological Permit Application Task C6.10.4.2 – Archaeological Site Investigation [Contingency Task] Task C6.10.4.3 – Phase II Technical Report [Contingency Task] Task C6.10.5 – National Environmental Policy Act (“NEPA”) Archaeological Resources Technical Memorandum or Report for EA or EIS Projects [Contingency Task] Task 6.10.6 – Determination of Eligibility (“DOE”) Task 6.10.7 – Ethnographic Study [RESERVED] Task 6.10.8 – Cultural Plant Study [RESERVED] Task 6.10.9 – Monitoring and Construction-related Activities [Contingency Task] Task 6.10.10 – Damage Assessments and Inadvertent Finds During Construction [RESERVED] Task 6.10.11 – Cultural Resources - Archaeology Coordination [RESERVED] Task 6.10.12 – Cultural Resources - Archaeology Quality Reviews [RESERVED] Task 6.10.13 – Archaeology Additional Investigation, Analysis, and Documentation [RESERVED] Task 6.11 – Visual/Aesthetics [RESERVED] Task 6.12 – Wetlands and Waters Delineation, and Permitting Services Task 6.12.1 – Wetlands and Waters Resources Task 6.12.1.1 – Wetlands and Waters Determination Fieldwork Task 6.12.1.2 – Wetland and Waters Impact Analysis Documentation Task C6.12.1.2.1 – Not present No impact [Contingency Task] Task C6.12.1.2.2 – Wetland(s) impacted [Contingency Task] Task C6.12.1.2.3 – Water(s) impacted [Contingency Task] Task C6.12.1.2.4 – Both impacted [Contingency Task] Task 6.12.1.3 – Wetlands and Waters Determination Technical Memorandum Task C6.12.1.4 – Wetlands and Waters Delineation Report [Contingency Task] Task 6.12.1.5 – NEPA Wetlands and Other Waters of the U.S. Technical Report [RESERVED] Task 6.12.1.6 – NEPA Water Quality and Quantity Technical Report [RESERVED] Task 6.12.2 – Environmental Permits and Clearances Task 6.12.2.1 – DSL General Authorization for Geotechnical Activities [RESERVED] Task 6.12.2.2 – USACE Nationwide Permit for Geotechnical Activities [RESERVED] Task 6.12.2.3 –DSL/USACE/Oregon Department of Environmental Quality (“DEQ”) Joint Permit Application (“JPA”) Task 6.12.2.3.1 –SWMP Task 6.12.2.4 – Stream Function Assessment [RESERVED] Task 6.12.2.5 – Wetland Function Assessment Report [RESERVED] Task 6.12.2.6 – Land Use Compatibility Statement (“LUCS”) [RESERVED] Task 6.12.3 – Wetlands and Waters Delineation, and Permitting Services Coordination [RESERVED] Task 6.12.4 – Wetlands and Waters Delineation, and Permitting Services Quality Reviews [RESERVED] Task 6.13 – Biological Services Task 6.13.1 – Biological Resources Compliance and Permitting Task 6.13.1.1 – Endangered Species Act (“ESA”) No Effect (“NE”) Task 6.13.1.2 – Federal-Aid Highway Program (“FAHP”) Programmatic ESA Documentation Task 6.13.1.3 – Biological Assessment (“BA”) [RESERVED] Task 6.13.1.4 – Biological Resources Compliance and Permitting Coordination [RESERVED] Task 6.13.1.5 – Biological Resources Compliance and Permitting Quality Reviews [RESERVED] Task 6.13.1.6 – Oregon Fish Passage Legal Requirements Task 6.13.1.6.1 – Fish Passage Compliance Review [RESERVED] Task 6.13.1.6.2 – Determine Appropriate Approach to Meet Fish Passage Requirements [RESERVED] Task 6.13.1.6.3 – Fish Passage Exemption Application [RESERVED] Task 6.13.1.6.4 – Fish Passage Waiver [RESERVED] Task 6.13.1.6.5 – Fish Passage Plan Task 6.13.1.6.6 – Fish Passage Plan under the ODOT/ODFW Culvert Repair Programmatic Agreement [RESERVED] Task 6.13.1.6.7 – Oregon Fish Passage Legal Requirements Coordination [RESERVED] Task 6.13.1.6.8 – Oregon Fish Passage Legal Requirements Quality Reviews [RESERVED] Task 6.13.1.7 – Bird Protection and Compliance, and Bat Colony Avoidance [RESERVED] Task 6.14 – Air Quality [RESERVED] Task 6.15 – Noise Studies and Variances [RESERVED] Task 6.16 Environmental Quality [RESERVED]
Task 7 – Public Involvement – Public Information – Public Engagement Task 7.1 –Public Hearing [RESERVED] Task 7.2 – Public Involvement and Communications Plan Task 7.3 – Communications Materials [RESERVED]
Task 8 – Utilities Coordination Task 8.1 – Utility Location and Coordination Task 8.2 – Utility Report Task 8.2.1 – National Environmental Policy Act (“NEPA”) Utilities Technical Memorandum or Report for EA and EIS Projects Task 8.3 – Utility Coordination Meetings [RESERVED] Task 8.4 – Utility Relocations [RESERVED] Task 8.5 – Utility Reimbursement [RESERVED] Task 8.6 – Add Work Agreements [RESERVED] Task 8.7 – Utility Special Provisions [RESERVED] Task 8.8 – Utility Certification Task 8.9 – Utilities Design Coordination [RESERVED] Task 8.10 – Utilities Coordination Quality Reviews [RESERVED]
Task 9 – Geotechnical, Geologic, and Hazardous Materials Services Task 9.1 – Geotechnical and Geologic Services Task 9.1.1 – Site Reconnaissance and Subsurface Exploration Plan Task 9.1.2 – Subsurface Explorations, Laboratory Testing, and Geologic Reconnaissance Task 9.1.3 – Geotechnical Design Deviation [RESERVED] Task 9.1.4 – Landslide Investigation Task 9.1.5 – Geotechnical and Geological Analysis Task 9.1.6 – Geotechnical Reporting Documents (“GRD”) Task 9.1.6.1 – Geotechnical Report Task 9.1.7 – Additional Subsurface Explorations, Laboratory Testing, and Geologic Reconnaissance [RESERVED] Task 9.1.8 – Additional Landslide Investigation [RESERVED] Task 9.1.9 – Additional Geotechnical Exploration, Reporting, and Support: Hazardous Material Monitoring Memorandum [RESERVED] Task 9.1.10 – Geotechnical and Geologic Design Coordination [RESERVED] Task 9.2 – Hazardous Materials Services Task 9.2.1 – Hazardous Materials Corridor Study (“HMCS”) Task 9.2.2 – American Society for Testing and Materials (“ASTM”) Phase I Environmental Site Assessment (“ESA”) Task 9.2.3 – Level 1 Initial Site Assessment (“ISA”) Task 9.2.4 – Minimal Assessment Memorandum (“MAM”) Task 9.2.5 – Shoulder Soil Investigation Task 9.2.5.1 – Shoulder Soil Investigation Work Plan and Health and Safety Plan (“HASP”) Task 9.2.5.2 - Sample Collection and Reporting Task 9.2.6 – Asbestos Survey [RESERVED] Task 9.2.7 – Asbestos Abatement Specification [RESERVED] Task 9.2.8 – Asbestos Abatement Oversight and Clearance Monitoring [RESERVED] Task 9.2.9 – Structure Survey [RESERVED] Task 9.2.10 – Geophysical Survey [RESERVED] Task 9.2.11 – Site-Specific Investigation [RESERVED] Task 9.2.12 – NEPA Hazardous Materials Technical Memorandum or Report for EA or EIS Projects [RESERVED] Task 9.2.13 – Hazardous Materials Services Coordination [RESERVED] Task 9.3 – Contract Documents [RESERVED]
Task 10 – Pavement Design Services Task 10.1 – Pavement Design Task C10.1.1 – Pavement Field Exploration and Testing [Contingency Task] Task 10.1.1.1– Additional Pavement Field Exploration and Testing [RESERVED] Task 10.1.2 – Laboratory Testing Task 10.1.2.1 – Additional Laboratory Testing [RESERVED] Task 10.1.3 – Pavement Design Analysis and Package Task 10.2 – Contract Documents Task 10.2.1 – Contract Documents Quality Reviews [RESERVED] Task 10.3 – Pavement Design Services Coordination [RESERVED] Task 10.4 – Pavement Design Services Quality Reviews [RESERVED]
Task 11 – Hydraulics and Stormwater Task 11.1 – Project Research and Initiation Task 11.1.1 – Project Research and Initiation Coordination Task 11.1.2 – Project Research and Initiation Quality Reviews [RESERVED] Task 11.2 – Hydrologic Analysis [RESERVED] Task 11.3 – Floodplain Hydraulics [RESERVED] Task 11.4 - Bridge Hydraulics [RESERVED] Task 11.5 – Open Channel Hydraulics [RESERVED] Task 11.6 – Culvert Hydraulics [RESERVED] Task 11.7 – Trenchless Pipe Rehabilitation [RESERVED] Task 11.8 – Temporary Water Management [RESERVED] Task 11.9 – Stormwater Task 11.9.1 – Stormwater Design Analysis Task 11.9.1.1 – Stormwater Design Analysis Coordination Task 11.9.1.2 – Stormwater Design Analysis Quality Reviews [RESERVED] Task 11.9.2 – Stormwater Design and Plans Task 11.9.2.1 – Stormwater DAP Design Task 11.9.2.2 – Stormwater PS&E Design Task 11.9.2.2.1 – Stormwater Preliminary Design [RESERVED] Task 11.9.2.2.2 – Stormwater Advance Design Task 11.9.2.2.3 – Stormwater Final Design Task 11.9.2.2.4 – Stormwater Final PS&E Task 11.9.2.3 – Stormwater Design and Plans Coordination Task 11.9.2.4 – Stormwater Design and Plans Quality Reviews [RESERVED]
Task 12 – Roadway Design Task 12.1 – Roadway Design Task 12.1.1 – Concept Alternatives Analysis [RESERVED] Task 12.1.2 – Roadway DAP Design Task 12.1.3 – Roadway PS&E Design Task 12.1.3.1 – Roadway Preliminary Design [RESERVED] Task 12.1.3.2 – Roadway Advance Design Task 12.1.3.3 – Roadway Final Design Task 12.1.3.4 – Roadway Final PS&E Task 12.1.4 – Roadway Design Exceptions Requests Task 12.1.5 – Reserved Task 12.1.6 – Curb Ramp Checklist [RESERVED] Task 12.1.7 – Roadway Calculation Books Task 12.2 – Roadway Design Coordination [RESERVED] Task 12.3 – Roadway Design Quality Reviews [RESERVED]
Task 13 - Railroad Coordination and Support [RESERVED]
Task 14 – Bridges and Structures Design Task 14.1 – Bridge Design [RESERVED] Task 14.2 – Retaining Wall Design Task 14.2.1 – Retaining Wall DVP Design [RESERVED] Task 14.2.2 – Retaining Wall Design Phase Task 14.2.2.1 – Retaining Wall TS&L Report Task 14.2.2.2 – Retaining Wall DAP Design Phase Coordination Task 14.2.2.3 – Retaining Wall Preliminary Design [RESERVED] Task 14.2.2.4 – Retaining Wall DAP Design Phase Quality Reviews [RESERVED] Task 14.2.3.5 – Retaining Wall Preliminary Design [RESERVED] Task 14.2.3.6 – Retaining Wall Advance Design Task 14.2.3.7 – Retaining Wall Final Design Task 14.2.3.8 – Retaining Wall Final PS&E Design [RESERVED] Task 14.2.3.9 – Retaining Wall Calculation Books Task 14.2.3.10 – Retaining Wall Design Coordination [RESERVED] Task 14.2.3.11 – Retaining Wall PS&E Design Quality Reviews and Structural Quality Check [RESERVED]
Task 15 – [RESERVED]
Task 16 – Traffic Engineering and Management Task 16.1 – Transportation Analysis [RESERVED] Task 16.2 – Code Refinement and Adoption [RESERVED] Task 16.3 – State and Region Traffic Engineer Approval Requests [RESERVED] Task 16.4 – Access Management [RESERVED] Task 16.5 – Transportation Management Plan (“TMP”) Task 16.5.1 – Work Zone Traffic Analysis and Documentation Task 16.5.2 – Work Zone Decision Tree [RESERVED] Task 16.5.3 – Mobility Considerations Checklist [RESERVED] Task 16.5.4 – TMP Coordination [RESERVED] Task 16.5.5 – TMP Quality Reviews [RESERVED] Task 16.6 –Work Zone Traffic Control Plans (“TCPs”) Task 16.6.1 –TCP DAP Design Task 16.6.2 – TCP PS&E Design Task 16.6.2.1 – TCP Preliminary Design [RESERVED Task 16.6.2.2 – TCP Advance Design Task 16.6.2.3 – TCP Final Design Task 16.6.2.4 – TCP Final PS&E Design Task 16.6.3 – Work Zone TCP Coordination [RESERVED] Task 16.6.4 – Work Zone TCP Design Quality Reviews [RESERVED] Task 16.7 - [RESERVED] Task 16.8 – Traffic Signal Design [RESERVED] Task 16.9 – Traffic Signal Interconnect Design [RESERVED] Task 16.10 – Sign Design [RESERVED] Task 16.11 – Pavement Marking Design [RESERVED] Task 16.12 – Illumination Design [RESERVED] Task 16.13– National Environmental Policy Act (“NEPA”) Traffic and Transportation Technical Memorandum or Report for EA or EIS Projects Task 16.14 – Traffic Engineering and Management Quality Reviews [RESERVED]
Task 17 – Erosion and Sediment Control Task 17.1 – Erosion and Sediment Control Design Task 17.1.1 – Erosion and Sediment Control DAP Design Task 17.1.2 – Erosion and Sediment Control Preliminary Design [Reserved] Task 17.1.3 – Erosion and Sediment Control Advance Design Task 17.1.4 – Erosion and Sediment Control Final Design Task 17.1.5 – Erosion and Sediment Control Final PS&E Design Task 17.1.6 – Erosion and Sediment Control Design Coordination [RESERVED] Task 17.1.7 – Erosion and Sediment Control Design Quality Review [RESERVED]
Task 18 – Roadside Development [RESERVED]
Task 19 – Right of Way (“ROW”) Task 19.1 – NEPA ROW Technical Memorandum or Report for EA and EIS Projects Task 19.2 – ROW Services Administration Task 19.2.1 – ROW Existing Information [RESERVED] Task 19.2.2 - ROW Process Coordination [RESERVED] Task 19.2.3 - ROW Information Tracking System (“RITS”) Management Task 19.2.4 - ROW Schedule [RESERVED] Task 19.2.5 - ROW Meetings [RESERVED] Task 19.3 – ROW Cost Estimating, Programming Estimate, Access Management, Title Reports, and ROW Setting [RESERVED] Task 19.4 –ROEs Task 19.5 – ROW Authorization [RESERVED] Task 19.6 – GIN [29120] [RESERVED] Task 19.7 – Real Estate Appraisals [RESERVED] Task 19.8 – Document Requests and Subject To Requests [RESERVED] Task 19.9 – Offer and Negotiation [RESERVED] Task 19.10 – Relocation [RESERVED] Task 19.12 – Closings [RESERVED] Task 19.13 – Certification Task 19.14 – Project-Related Property Management [RESERVED] Task 19.15 – ROW Coordination During Construction [RESERVED] Task 19.16 – ROW Design Coordination [RESERVED] Task 19.17 – ROW Quality Reviews [RESERVED]
Task 20 – Design Acceptance Package (“DAP”) Task 20.1 – Design Verification Package (“DVP”) [RESERVED] Task 20.2 – DAP
Task 21 – Plans, Specifications and Estimate (“PS&E”) Task 21.1 – Preliminary Plans Package [RESERVED] Task 21.2 – Advance Plans Package Task C21.2.1 – Letters of Public Interest Finding (“LPIF”) [Contingency Task] Task 21.3 – Final Design Package Task 21.3.1 – Final PS&E Package Provided by ODOT [RESERVED] Task 21.4 – Phase Gate Quality Assurance Task 21.5 – PS&E Submittal Package Task 21.6 – eBIDS Handoff Package Task 21.7 –Construction Survey Handoff Package [RESERVED] Task 21.8 – PS&E Quality Reviews [RESERVED]
Task 22 - Bid and Award Assistance Task 22.1 – Pre-Bid Meeting [RESERVED] Task 22.2 – Questions During Bidding [32030] Task C22.3 – Addenda to the Bid Documents [Contingency Task] Task 22.4 – Bid and Award Assistance Quality Reviews [RESERVED]