This is a Detailed Damage Inspection Report (DDIR) for the Title 23 Emergency Relief Program involving the U.S. Department of Transportation Federal Highway Administration, Coos County, and the Oregon Department of Transportation (ODOT). The document details a road damage incident on Fairview-Sumner Lane at Milepost 4.7, which occurred on January 12th, 2024, involving a large slide that caused a downslope shoulder failure, gravel surface damage, and a 24" HDPE culvert that was pinched and pulled apart. Temporary emergency repairs were performed by TNT Construction on January 31st, 2024, including culvert replacement, road section restoration, and road surface regrading.
The total emergency repair work cost $13,326.50, with temporary repairs totaling $11,450.63 and lane closure costs at $1,875.87. ODOT reviewed the site and recommended permanent repair options, with a preferred solution of a "Shear Key with Buttress" approach estimated at $1,920,000. This includes $420,000 for engineering, $100,000 for right-of-way, and additional costs for ODOT delivery. The document notes that Coos County concurs with ODOT's recommendation, and the permanent repair is contingent on completing NEPA (National Environmental Policy Act) and PS&E (Plans, Specifications, and Estimates) documentation. The site is considered eligible for federal-aid highway emergency relief funding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00014024_Attachment B_Key Staff Resume Form.docx | DOCX document | |
| 00014024_Attachment C_Sample Projects.doc | DOC document | |
| 00014024_Attachment F_Additional Documentation.pdf | ||
| 00014024_Mini-RFP_Final.docx | DOCX document | |
| 00014024_Attachment G_Menu of Services_Final.docx | DOCX document | |
| RFP CM GC Services Award Update 2025-08-12.pdf | ||
| 00014024_Attachment A_Proposal Cover Sheet.doc | DOC document | |
| 00014024_Addendum 1_Final.pdf | ||
| 00014024_Attachment E_DDIR_Sitkum Lane.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/29/25
5/1/2025 ER funds authorization is subject to completing NEPA and PS&E package
X
File details come from the government source that posted it. Updated .