00010754 RFCQ Addendum 1.pdf

PDF 126 KB Posted

Attached to
ESB - ODOT Parkdale Maintenance Station New Wash Slab
Solicitation number
S-73000-00010754
Issued by
Hood River County, Oregon

About this file

This document is an Addendum to a Request for Competitive Quotes (RFCQ) issued by the Oregon Department of Transportation (ODOT) for the ESB - ODOT Parkdale Maintenance Station New Wash Slab project. The project involves making improvements to vehicle wash facilities at the ODOT Parkdale Maintenance Station, including demolition, excavation, utility trenching, in-ground vault, concrete slab, catch basin, required piping, pump system, water treatment system, electrical work, grading, asphalt concrete paving, and drainage swale. The RFCQ has a quote submission deadline as indicated in OregonBuys. This Addendum modifies the RFCQ to allow ODOT to accept excavation spoils of soil, rock, and asphalt from the project on the project site, with the contractor responsible for moving the spoils to a designated stockpile location.

The project is set aside for ESB (Emerging Small Business) certified contractors. No other pricing terms, funding requirements, or incumbent information is provided in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFCQ_ADDENDUM, REV. May 2022

DATE: July 12, 2024 OREGON DEPARTMENT OF TRANSPORTATION

REQUEST FOR COMPETITIVE QUOTES

ADDENDUM NO. 1

RFCQ NO.: S-73000-00010754 QUOTE SUBMISSION

DEADLINE:

See “Bid Opening Date” and time for this Competitive Quote in OregonBuys

DESCRIPTION: ESB – ODOT Parkdale Maintenance Station New Wash Slab

BUYER:

Darren Schmidt EMAIL: darren.s.schmidt@odot.oregon.gov PHONE: 503-910-9195

This Addendum modifies the Request for Competitive Quotes (RFCQ) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum remain in full force and effect. This Addendum is hereby made an integral part of the RFCQ document. Bidder must be responsive to any requirements of this Addendum as if the requirements were set forth in the RFCQ.

THE PURPOSE OF THIS ADDENDUM IS TO:

Exhibit 1 – Technical Specifications to Attachment A – Sample Agreement

The following is added to Section 311000 – Site Clearing as item 3.7:

ODOT will accept excavation spoils of soil, rock and asphalt from the project on the project site. Spoils may be placed at the eastern portion of the site approximately 600 feet from the work area. Specific location is to be coordinated with the site manager. Contractor is responsible for moving spoils to the stockpile location on-site.