Runway Rubber Removal and Airfield Striping
This is a sources sought notice for Runway Rubber Removal (R3) and Airfield striping at Dyess AFB, Texas. The Contractor shall furnish all plant, labor, supervision, materials, tools, equipment, and incidentals to successfully complete the Task Orders within specifications. It will be a Firm Fixed Price Contract and award will be made to a local small business concern. This acquisition will be considered under North American Industry Classification System (NAICS) code 237310. Small business size standard is $39,500,000.
The Government is seeking to gather market research for qualified contractors for the upcoming R3 and Airfield Striping IDIQ; issued using North American Industry Classification System (NAICS) 237310 Highway, Street, and Bridge Construction. The Government intends to award a single IDIQ award (1 year base with 1 one-year option), IDIQ contract. The small business size standard is $39.5 Million. This Sources Sought is for market research purposes only and IS NOT A REQUEST FOR PROPOSAL (RFP) nor does it restrict the Government as to the ultimate acquisition approach. The Government will not reimburse respondents for any costs incurred in preparation of a response to this notice.
1. Contract Information
The U.S. Air Force, 7th Contracting Squadron, Dyess AFB, Texas, is seeking capability statements from companies who possess the interest and capability for the upcoming Dyess AFB R3 and Airfield striping IDIQ and to execute the requirements outlined below:
All work shall be in accordance with the statement of work and drawings provided for the seed project and all subsequent task orders. Work will consist of furnishing all necessary material, equipment, labor and general conditions to accomplish the following:
a) Requirements issued under the R3 and Striping IDIQ will be Request for Proposals for runway rubber removal and re-striping at Dyess AFB. The Statement of Work (SOW) shall define the requirement in detail by Civil Engineering to include the appropriate performance period for each requirement taking into account the complexity of runway availability and, time of year when the work is to be accomplished.
b) The work shall be executed in the best and most workmanlike manner. All work shall be accomplished in strict adherence to the contract documents and industry or regulatory standards.
c) Performance and payment bonds will be required per individual task order in accordance with Federal Acquisition Regulation Part 28.
2. Submission Requirements:
Dyess Air Force Base is seeking a response from interested firms that qualify as a U.S. Small Business, or in the SBA Certified 8(a) Program, SBA Certified HUBZone, Service Disabled Veteran Owned Small Business (SDVOSB), or Woman Owned Small Business (WOSB) in an attempt to facilitate decision making of potential sources for a possible procurement. Interested companies should submit a document describing relevant demonstrated experience and qualifications via email to TSgt Brandon Gilbert at Brandon.Gilbert.9@us.af.mil, or Mr. Danny Webb at Danny.Webb.2@us.af.mil no later than 2 September 2021. The submission should address all questions in the questionnaire below and your ability to perform the work, obtain the necessary financing, etc., as stated in the contract information section of this Sources Sought.
Questions concerning submissions should be directed to TSgt Brandon Gilbert at Brandon.Gilbert.9@us.af.mil, or Mr. Danny Webb at Danny.Webb.2@us.af.mil. Personal visits for the purpose of discussing this announcement will not be scheduled.
CAPABILITIES QUESTIONNAIRE
SECTION 1: GENERAL
1. Business Name, address, responsible point of contact (POC), telephone number, fax number, email address, and CAGE Code: (Insert Business Name)
2. Company's business size and/or socioeconomic status (i.e. Small Business, SBA Certified 8A Program Participant, SBA Certified HUB Zone Firm, Small Disadvantaged Business, Service Disabled Veteran Owned Business, Woman-Owned Small Business).
Check All That Apply: Our firm is a ( ) Certified 8(a) Business, ( ) Service-disabled veteran-owned small business, ( ) HUBZone small business, ( ) Woman Owned small business, ( ) Small Business,
3. Offeror's Joint Venture, Partnering Agreement, or Mentor-Protégé information if applicable existing and potential. (Insert Business Name/Cage Code)
SECTION 2: CONTRACTOR ARRANGEMENT
1. Our firm will be proposing on this project as a:
( ) Sole Contractor
( ) Prime Contractor (if small business) performing at least 15% of the work with subcontractor(s),
( ) Prime contractor (if small business) performing at least 15% of the work with the following team member subcontractor(s) (Insert business name, business size, cage code, and work which will be subcontracted), or
( ) Joint venture with (Insert business name, business size, and cage code). (See FAR subpart 9.6 for Government policy on teaming arrangements, as well as 8(a)Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403(c) and 13 CFR 125.15(b).)
SECTION 3: CAPABILITY
1. Representation of ability to execute Runway Rubber Removal and Airfield Striping. The specific description of work will be identified in each individual task order. All work shall be performed in accordance with all applicable federal, state, and local rules/laws, to achieve and maintain economical, safe, sanitary, operational and undeteriorated conditions.
a. Contract Agency with Reference Point of Contact:
b. Contract Number:
c. Task Order Number (if applicable):
d. Role: Prime or Subcontractor (If your performance was through subcontract or joint partnership, indicate the percentage of work for each partner for each element of service provided.)
e. Award Amount: $
f. Contract Price Structure (Fixed Priced, Cost Reimbursable, Time & Materials, Hybrid (explain)):
g. Location of Project:
h. Description/Scope of Project:
2. Does your company have experience in providing and maintaining an effective quality control program? Provide examples.
3. Does your company have experience in providing and maintaining an effective safety program? Provide examples.
FA4661-21-D-XXX1 Department of the Air Force Global Strike Command
Pre-Solicitation 1/1
8/2/21, 4:34 PM C1BD--SDVOSB Set-Aside for AE Services - Project no. 561A4-18-116 Replace HVAC Dental Building 6 at VA NJ HCS Lyons Campus
Page 13 of 13
THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT.
The Department of Veterans Affairs is seeking a qualified Architect-Engineering (AE) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for Project no. 561A4-18-116 Replace HVAC Dental-Building 6, at the VA NJ Health Care System, Lyons, New Jersey 07939. This project is needed to replace the HVAC unit(s) that currently services the Dental Suite in building 6 as well as the removal of the current laboratory cabinets (asbestos containing) in building 6 room 226 and installation of new cabinets.
This requirement is being procured in accordance with the Brooks Act as implemented in FAR Subpart 36.6. Applicable NAICS code is 541330 and small business size standard of $16.5 Million. Magnitude of Construction is between $1,000,000.00 and $5,000,000.00. This is a 100% Service-Disabled Veteran-Owned Small Business Set Aside. The anticipated award date of the proposed A-E Contract is on or before September 30, 2021 Potential contractors must be registered in SAM (www.sam.gov ) and visible/certified in Vet Biz (https://www.vip.vetbiz.va.gov ) at time of submission of their qualifications in order to be considered for an award. As a prospective offeror or bidder for this Service-Disabled Veteran-Owned Small Business (SDVOSB) set aside, you are verifying your company meets the status requirements of a SDVOSB concern as established by VAAR 852.219-10. NOTE - Offerors are referred to 852.219-10(d)(1) Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs. In order to assure compliance with this clause, all firms submitting a SF330 for this Sources Sought Notice are required to indicate what percentage of the cost of contract performance will be expended by the concerns employees and in which discipline(s) and percentage of cost of contract performance to be expended (and in what disciplines) by any other subcontracted or otherwise used small or large business entity(s). Any subcontracted or otherwise business entity(s) used must be identified by name, office location and size/type of business (i.e. SDVOSB, VOSB, 8(a), large, etc).
SCOPE OF SERVICE REQUIRED
561A4-18-116 Replace HVAC Dental-Building 6
LOCATION
VA New Jersey Healthcare System Lyons Campus
COST RANGE
Estimated Construction Cost Range: Between $1,000,000.00 and $5,000,000.00
TYPE OF CONTRACT CONTEMPLATED
The Department of Veterans Affairs is contemplating awarding a firm fixed price contract.
ESTIMATED START AND COMPLETION DATES
The Department of Veterans Affairs requires design and contract support services. The estimated start and end dates for the design and start and end dates for the construction are as follows:
ITEM DATE
Receive Notice to Proceed from (NTP) TBD
Deliver 100% Schematic Review Material 40 calendar days from NTP
Review 100% Schematic Review Material 50 calendar days from NTP
Deliver 65% Working Drawings 80 calendar days from NTP
Review 65% Working Drawings 90 calendar days from NTP
Deliver 95% Working Drawings 120 calendar days from NTP
Review 65% Working Drawings 140 calendar days from NTP
Deliver 100% Working Drawings 160 calendar days from NTP
Review 100% Working Drawings 170 calendar days from NTP
Deliver Final Bid Documents 180 calendar days from NTP
The A/E shall perform the work required within the limits of the following schedule. Professional architects, engineers and related design disciplines familiar with the work shall be provided, as directed by the Contracting Officer, to attend the VA reviews.
Construction:
Number of calendar days to complete construction is to be determined by the AE firm after the design is complete.
SELECTION CRITERIA DESCRIPTIONS:
The selection criteria descriptions are provided below.
PROFESSIONAL QUALIFICATIONS NECESSARY FOR SATISFACTORY PERFORMANCE OF REQUIRED SERVICES.
Provide brief resumes of proposed team members who will specifically serve as the Project Managers and Designers of Record. The Designers of Record shall perform and direct the design within their respective discipline and shall sign and seal the drawings. All Designers of Record must be professionally registered in their discipline. Each resume shall include a minimum of two (2) specific completed projects that best illustrate the individual team members experience relevant to this contract scope;
SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE
Specialized experience and technical competence required for this specific project, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials.
CAPACITY
This factor evaluates the ability of the firm, given their current projected workload and the availability of their key personnel, to accomplish the possible myriad of design projects in the required time.
The general workload and staffing capacity of the design office will be evaluated.
List current projects with a design fee of greater than $20,000 being designed in the firms office.
Indicate the firms present workload and the availability
of the project team (including sub-consultants) for the specified contract performance period;
Describe experience in successfully delivering projects per
performance schedule, providing timely construction support, and successfully completing multiple projects with similar delivery dates
PAST PERFORMANCE: VISN2 will evaluate past performance on recent and relevant contracts with government agencies (emphasis on VA work) and private industry in terms of cost control, quality of work, compliance with performance schedules and a record of significant claims against the firm due to improper or incomplete engineering services (references required).
Recent is defined as performance occurring within 5 years of the date of this Sources Sought, except that ongoing projects must have begun no less than one (1) year prior to the issuance of this Sources Sought.
Relevancy is defined as performance of work on projects that are similar in scope to the types of projects anticipated under the resultant contracts.
Respondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.
Submission Requirements:
Submit a minimal of three (3) references; any of the following evaluations are acceptable:
Contractor Performance Assessment Report System (CPARS), or
Past Performance Questionnaire (PPQ) evaluation for each project submitted under Criterion 2.
If a completed CPARS evaluation is available, it shall be submitted with the completed SF330 package. If there is not a completed CPARS evaluation, the PPQ included with this notice is provided for the Offeror or its team members to submit for each project included in criterion (2). If a PPQ is submitted, but an official CPARS evaluation is found for that project in government databases, the official evaluation will take precedence. If a CPARS evaluation is not available, ensure correct phone numbers and email addresses are provided for each contract customer/reference. Completed PPQs should be submitted with your SF330. If the A-E is unable to obtain a completed PPQ from a contract customer/reference for a project before the response date set forth in this notice, the A-E should complete and submit with their response the first page of the PPQ (Attachment #1), including contract and point of contact information for the respective projects.
A-Es should follow-up with references to ensure timely submittal of questionnaires. At the reference s request, questionnaires may be submitted directly to the Governments point of contact, Mitchelle Labady via email at Mitchelle.Labady@va.gov, prior to the response date. A-Es shall not incorporate by references into their response CPARS or PPQ evaluations previously submitted in response to other A-E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
LOCATION
The A/E Firm proximity to the Lyons VAMC, 151 Knollcroft Rd. Lyons, NJ 07939 is an evaluation criterion.
This distance is determined according to http://maps.google.com/
This factor evaluates the distance the AE firm's design office or offices lies from the location of work. Please provide the address (es) and distance of your closest office to the address listed below.
The extent to which potential contractors identify and commit to the use of service-disabled Veteran-owned small businesses, Veteran-owned small businesses, and other types of small businesses as subcontractors.
Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services.
PLEASE NOTE: The AE Evaluation Board must be provided with complete and accurate information for ALL seven (7) evaluation factors above in order to rank as qualified and eligible firms. Therefore, the AE firm must expand upon, as it deems necessary, on any evaluation factor not well demonstrated or addressed with Part 1A to Part IG and Part II of the SF330. The AE firm shall use Part IH and/or use additional sheets to supplement/address all evaluation factors to clearly demonstrate its qualifications.
LIMITATIONS
852-219-10 VA NOTICE OF TOTAL SERVICE DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (NOV 2020) (a) Definition. For the Department of Veterans Affairs, Service Disabled Veteran-owned small business or SDVOSB
(a) Definition. For the Department of Veterans Affairs, Service-disabled Veteran-owned small business concern or SDVOSB:
(1) Means a small business concern
(i) Not less than 51 percent of which is owned by one or more service-disabled Veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled Veterans or eligible surviving spouses (see VAAR 802.201, Surviving Spouse definition);
(ii) The management and daily business operations of which are controlled by one or more service-disabled Veterans (or eligible surviving spouses) or, in the case of a service-disabled Veteran with permanent and severe disability, the spouse or permanent caregiver of such Veteran;
(iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document;
(iv) The business has been verified for ownership and control pursuant to 38 CFR part 74 and is listed in VA s Vendor Information Pages (VIP) database; and
(v) The business will comply with VAAR subpart 819.70 and Small Business Administration (SBA) regulations regarding small business size and government contracting programs at 13 CFR part 121 and 125, provided that any reference therein to a service-disabled Veteran-owned small business concern (SDVO SBC), is to be construed to apply to a VA verified and VIP-listed SDVOSB unless otherwise stated in this clause.
(2) Service-disabled Veteran means a Veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
(3) The term small business concern has the meaning given that term under section 3 of the Small Business Act (15 U.S.C. 632).
(4) The term small business concern owned and controlled by Veterans with service-connected disabilities has the meaning given the term small business concern owned and controlled by service-disabled Veterans under section 3(q)(2) of the Small Business Act (15 U.S.C. 632(q)(2)), except that for a VA contract the firm must be listed in the VIP database (see paragraph (a)(1)(iv) above).
(b) General.
(1) Offers are solicited only from VIP-listed SDVOSBs. Offers received from entities that are not VIP-listed SDVOSBs at the time of offer shall not be considered.
(2) Any award resulting from this solicitation shall be made to a VIP-listed SDVOSB who is eligible at the time of submission of offer(s) and at the time of award.
(3) The requirements in this clause apply to any contract, order or subcontract where the firm receives a benefit or preference from its designation as an SDVOSB, including set-asides, sole source awards, and evaluation preferences.
(c) Representation. Pursuant to 38 U.S.C. 8127(e), only VIP-listed SDVOSBs are considered eligible to receive award of a resulting contract. By submitting an offer, the prospective contractor represents that it is an eligible SDVOSB as defined in this clause, 38 CFR part 74, and VAAR subpart 819.70.
(d) Agreement. When awarded a contract action, including orders under multiple-award contracts, an SDVOSB agrees that in the performance of the contract, the SDVOSB shall comply with requirements in VAAR subpart 819.70 and SBA regulations on small business size and government contracting programs at 13 CFR part 121 and part 125, including the non-manufacturer rule and limitations on subcontracting requirements in 13 CFR 121.406(b) and 125.6. Unless otherwise stated in this clause, a requirement in 13 CFR part 121 and 125 that applies to an SDVO SBC, is to be construed to also apply to a VIP-listed SDVOSB. For the purpose of limitations on subcontracting, only VIP-listed SDVOSBs (including independent contractors) shall be considered eligible and/or similarly situated (i.e., a firm that has the same small business program status as the prime contractor). An otherwise eligible firm further agrees to the following:
(1) Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP- listed SDVOSBs.
(2) Supplies or products.
(i) In the case of a contract for supplies or products (other than from a non- manufacturer of such supplies), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
(ii) In the case of a contract for supplies from a non-manufacturer, it will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) has been granted.
(3) General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
(4) Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime may be paid to firms that are not VIP-listed SDVOSBs.
(5) Subcontracting. An SDVOSB must meet the NAICS size standard assigned by the prime contractor and be listed in VIP to count as similarly situated. Any work that a first tier VIP-listed SDVOSB subcontractor further subcontracts will count towards the percent of subcontract amount that cannot be exceeded. For contracts referenced in (d)(2), (3), and (4) the cost of materials is excluded and are not considered to be subcontracted. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small businesses do not provide them. For additional information and more specific requirements on the limitations on subcontracting, refer to 13 CFR 125.6.
(e) Required limitations on subcontracting compliance measurement period. An SDVOSB shall comply with the limitations on subcontracting as follows:
[Contracting Officer check as appropriate.]
_____By the end of the base term of the contract or order, and then by the end of each subsequent option period; or
_____By the end of the performance period for each order issued under the contract.
(f) Joint ventures. A joint venture may be considered eligible as an SDVOSB if the joint venture is listed in VIP and complies with the requirements in 13 CFR 125.18(b), provided that any requirement therein that applies to an SDVO SBC is to be construed to apply to a VIP-listed SDVOSB. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the joint venture participants.
(g) Precedence. Any inconsistencies between the requirements of the SBA Program for SDVO SBCs, and the VA Veterans First Contracting Program, as defined in VAAR subpart 819.70 and this clause, the VA Veterans First Contracting Program takes precedence.
(h) Misrepresentation. Pursuant to 38 USC 8127(g), any business concern, including all its principals, that is determined by VA to have willfully and intentionally misrepresented a company s SDVOSB status is subject to debarment from contracting with the Department for a period of not less than five years (see VAAR 809.406, Debarment).
SUBMISSION REQUIREMENTS
Qualified Service Disabled Veteran Owned Small Business firms are required to submit two (2) Compact Disk copies of the SF 330 (which can be downloaded from www.gsa.gov/forms ) which contains digital copies of the SF 330and one (1) Hard Copy. All packages shall be submitted no later than 3:00 PM EDT Monday, June 28, 2021 including Past Performance (CPARS) evaluations or Questionnaires (attachment 1). All submittals must be sent to the attention of:
Email (1) pdf copy to:
Mitchelle Labady-Contracting Officer
RE: 561A4-18-116 Replace HVAC Dental-Building 6
Mitchelle.Labady@va.gov
Mail (2) CD and (1) HARDCOPY to:
Patricia Bonilla Project Engineer
RE: 561A4-18-116 Replace HVAC Dental-Building 6
VA New Jersey Healthcare System Lyons Campus
151 Knollcroft Road
Building 10
Lyons, NJ 07939
The submission must include an insert detailing the following information:
1. Dun & Bradstreet Number;
2. Tax ID Number;
3. The e-mail address and phone number of the Primary Point of Contact and;
4. A copy of the firms CVE verification
The Contracting Officer is not responsible for not receiving submissions due to the offeror misaddressing the package or illegibility of the information. NOTE: Any request for assistance with submission or other procedural matters shall be submitted via email only to Mitchelle.Labady@va.gov telephone inquiries will not be honored.
THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. THE GOVERNMENT WILL NOT PAY NOR REIMBURSE ANY COSTS ASSOCIATED WITH RESPONDING TO THIS REQUEST. THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT.
36C24221R0083 Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2
Pre-Solicitation 1/1
5/27/21, 6:28 PM Airfield Rubber/Paint Removal, Re-striping and Markings
1. The 27 Special Operations Contracting Squadron (27 SOCONS) located in Clovis, New Mexico is seeking information concerning the availability of capable contractors to provide non-personal services as follows:
2. Description of Services: The general Scope of Work is to acquire Airfield Rubber/Paint Removal, Re-striping and Markings. The Contractor(s) will furnish all plant, labor, supervision, materials, tools, equipment, incidentals, supervision, and management to perform this requirement at Cannon Air Force Base located in Clovis, New Mexico. The Government intends to establish an Indefinite Delivery Indefinite Quantity (IDIQ) with a base year and up to four option years. Task orders will be awarded by the Contracting Squadron against the basic IDIQ throughout the IDIQ life cycle.
3. Small Business Standards
a. NAICS: 237310
b. S/B Size Standard: $39.5M
c. PSC/FSC: C1BD
d. Estimated Magnitude of Construction: Between $1,000,000 and $5,000,000
4. This Request for Information (RFI) is issued for informational and planning purposes only. This is not a Request for Proposal (RFP). It is not to be construed as a commitment by the Government to issue a solicitation or ultimately award a contract. Responses will not be considered as proposals, nor will any award be made as a result of this RFI. The Air Force will NOT be responsible for any costs incurred by interested parties in responding to this RFI. Contact with Government personnel other than those specified in this RFI by potential offerors or their employees’ regarding this project is prohibited.
5. For your business to be considered as a potential vendor for set aside purposes you must submit a Capabilities Statement as requested by this notice. Failure to do so may result in your business category not being considered as part of a decision by the government to set aside. The information requested by this RFI will be used within the Air Force to facilitate decision making and will not be disclosed outside the agency.
6. The Capability Statement should include general information, past performance and technical background describing your firm's experience in contracts requiring similar efforts to meet the program objectives. Interested parties shall not submit more than 10 single-sided, type-written pages using 12-point font. Published literature may be any number of pages. At a minimum the following information is requested:
a. Company Cage Code, DUNS, name, address, point of contact, telephone number and e-mail address.
b. Bonding capability.
c. Any small business status (HUB Zone, veteran-owned, women-owned, 8(a) etc).
d. Indicate your role as the “Prime Contractor” and what functions for which you plan to self perform as a percentage of the total and those which you intend to use subcontractors.
e. Indicate if your company primarily does business in the government and/or commercial sector for this type of work.
f. Indicate which NAICS code(s) your company usually performs under for government contracts.
7. If your firm is capable of providing the requirements described above, please provide a Capability Statement to the contract administrator and contracting officer by the deadline indicated in this sources sought.
21-0002 Department of the Air Force Special Operations Command
Pre-Solicitation 1/1
4/15/21, 11:12 AM Repair IMC Pavements - Area F
SYNOPSIS
For
ARCHITECT-ENGINEER (A-E) SERVICES FOR REPAIR IMC PAVEMENTS – AREA F
A. GENERAL INFORMATION.
The 628th Contracting Squadron (CONS) desires to contract with an Architect-Engineer (A/E) firm in support of the Joint Base Charleston Design and Construction mission. We anticipate awarding an Architect-Engineer (A-E) contract for Primary Architect-Engineer Services that will include design of airfield pavements (concrete and asphalt) at Joint Base Charleston - Air Base (JBC-AB) located in North Charleston, SC.
The contract awarded under this announcement is subject to an Organizational Conflict of Interest (OCI) Clause in accordance with 5352.209-9000. Concerns may be submitted directly to the Contract Specialist, Brandon Rawlings, via email at brandon.rawlings@us.af.mil and/or Contracting Officer, Michael Mesko at michael.mesko@us.af.mil prior to SF330 due date.
General Submission Requirements:
A cover letter must be submitted to accompany the SF330 that clearly identifies the Offeror’s size status (for NAICS 541330 with a size standard of $16.5M).
A maximum of five (5) projects for the proposed team (including joint ventures and teaming partners) may be provided in section F. A “project” is defined as work performed at one site or a single installation. An Indefinite Delivery Contract (IDC) will not be considered a “project” for the purposes of evaluation. If the offeror provides a specific task order as a project, it should provide the base contract number and the task order number for reference purposes. If the offeror provides a site-specific contract as a project, it should provide the contract number for reference purposes. Project descriptions shall clearly define the extent of work completed, the extent of work performed by the team (i.e. disciplines and scope), extent of design completed by the proposed team (i.e. preparation of design-build package; 100% design; report, etc.), and dates of completion for design and construction. Clearly cite whether the experience is that of the prime (or joint venture), consultant or an individual for each project in Section F. Work cited that is experience of the prime (or joint venture) from an office other than that identified in Section C should be so labeled. Designs or studies completed before 2016 will not be considered. Projects for which designs or studies are not complete may be given lesser consideration than completed efforts.
The SF 330 should have a total page limitation of 75 pages with Section H limited to twenty (20) pages. Each project in Section F is limited to two (2) pages; Part II is excluded from the 75 printed page limit. Double-sided sheets will count as two (2) pages. Page sheets of 11 inches X 17 inches will be counted as a single page. Tabs do not count against the page count limit, but information contained on divider tabs will not be evaluated. For all SF 330 sections, use no smaller than 11 point font.
Questions regarding this Synopsis must be submitted via email to the Contracting Officer and Contract Specialist no later than 3:00 p.m., Eastern Standard Time (EST) on 15 Mar 21.
Offerors shall submit a complete, original signed paper proposal and two (2) copies, as well as one copy in CD/R (or DVD /R) format to be delivered to the Contracting Office no later than 12:00 p.m., Eastern Standard Time (EST) on 29 Mar 21. If hand delivering, please contact Mr. Brandon Rawlings, 843-963-5180, to coordinate delivery on 29 Mar 21 at the Dorchester Road Visitor Control Center. The CD/R or DVD/R must be virus scanned and read only. The Contracting Office will accept modifications and revisions to the proposal via DOD SAFE at https://safe.apps.mil. In order to facilitate the sending and receiving of proposal modifications/revisions, offerors must first contact the Contract Specialist/Contracting Officer via email to request a DoD SAFE Drop-off. Once your email address is confirmed you will receive an email request to Drop-Off your files. Contractors are cautioned to request a DOD SAFE drop off password well in advance. The Government will not be responsible for interruptions in communications which cause delays.
Visitor Control: Offerors are cautioned that Joint Base Charleston has a visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor's pass prior to entrance. SOME DELAY SHOULD BE ANTICIPATED WHEN HANDCARRYING OFFERS. Offerors should allow sufficient time to obtain a visitor pass (requiring valid driver's license, vehicle registration, and current proof of insurance) and arrive at the location for submission PRIOR to the time established for receipt of offers. Late proposals will be processed in accordance with the provisions of FAR 52.215-1(c)(3), "Submission, modification, revision, and withdrawal of proposals."
Contracting Officer: michael.mesko@usaf.mil
Contract Specialist: brandon.rawlings@us.af.mil
LATE SUBMISSION OF SF-330s WILL NOT BE ACCEPTED.
Personal visits and/or requests for discussion regarding this announcement WILL NOT BE ENTERTAINED.
TEAMING PARTNERS: The prime firm shall provide a statement in the cover letter confirming executed teaming agreements are in place for all team members as part of the SF-330 submittal. The statement shall also list all team members. Contractor teaming arrangements are defined as a partnership or an agreement for a specific Government opportunity between a potential prime contractor and one or more companies that are potential subcontractors. Additionally, all firms selected as the most highly qualified for this A-E contract and issued a Request for Proposal will be required to submit and negotiate one composite labor rate per labor category/discipline, to be incorporated into the contract. Teaming partner rates will not be negotiated separately.
AWARD PROCEDURES: This contract will be procured in accordance with the Selection of Architect-Engineers Act (40 U.S.C Sections 1101-1104, previously known as the ‘Brooks Act'), as implemented by FAR 36.6. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work, in accordance with the selection criteria identified below. The North American Industrial Classification System (NAICS) code is 541330, which has a size standard of $16,500,000. To receive award, contractors must be registered in the System for Award Management (SAM). Register via the SAM website at http://www.sam.gov. Those firms selected as the most highly qualified will be issued an individual Request for Proposal to negotiate labor rates. This synopsis and any resultant contract awards do not guarantee work to selected firms.
INTERVIEWS: In making the most highly qualified selection, the evaluation board may conduct interviews with highly qualified firms (by phone, in person, or in writing) during the final selection process.
RFPs: Those firms that are determined to be the most highly qualified will be issued a Request for Proposal (RFP) to submit composite labor rates covering a variety of engineering and engineering support labor categories. Only one set of composite rates per labor category will be negotiated. Most labor categories will include junior, mid-level, and senior rates. Separate rates for specific teaming or joint venture partners will not be negotiated.
All firms selected as the most highly qualified, will be required to provide applicable teaming and/or JV agreements with their response to the RFP.
QUESTIONS: A pre-proposal (pre-SF330 submission) conference will not be held. Questions and Government responses will be attached as a separate document. If applicable, responses will be incorporated into this Synopsis.
B. DESCRIPTION OF WORK.
This contract will support the award of Architect-Engineer (A-E) services specifically associated with repairing the pavement between Building 578 and the tow way to the northwest at Joint Base Charleston – Air Base (JBC-AB) located in North Charleston, SC:
1. General Scope: Architect-Engineer (A/E) services are required to provide complete, detailed drawings, specifications, and cost estimates for “Project DKFX 09-1009F, REPAIR IMC PAVEMENTS – AREA F” at Joint Base Charleston - Air Base, South Carolina. The approximate limits of Area F are shown below. The A/E design shall include but shall not be limited to the following major items of work, which are listed below in order to determine the general scope of the work involved. It shall be the responsibility of the A/E to visit the site to determine the actual amount of work and field conditions that will affect the finished product.
2. The intent of this task order is to repair the pavements between building 578 and the tow way to the NW. Scope includes, but is not limited to the following::
a. Site Utilities: Survey shall identify all utilities within construction limits. No utility work is expected.
b. Topographical survey: The A-E shall perform topographic surveys at appropriate intervals to properly delineate the project scope. All survey data shall be collected utilizing conventional ground survey equipment (ie: total station). The survey should be oriented to State Plane North (Grid North) but shall be drawn to actual ground horizontal scale (not grid scale). The surveyor shall provide the necessary conversion information needed to scale the drawings from ground to grid and to translate drawings from project coordinates to state plane coordinates. Area of work is approximately 95,000 SF.
c. Pavement: All pavements in “Area F” are to be replaced full depth with the exception of PCC pavements immediately adjacent to B. 578. Those pavements will receive spall repairs and be resealed. New hangar access ramp will be PCC and shoulder pavements asphalt. Design IAW UFC 3-260-1 & 3-260-2.
Existing concrete inside the wingtip clearance line of tow way will be converted to a sodded shoulder either side of the access ramp.
d. Geotechnical: Provide soil borings and geotech data as required for complete design. Take adequate cores to identify thicknesses of existing pavements to be demolished.
e. Drainage: Provide for surface drainage as required. Drainage layer/under drain system not required. Existing reinforced concrete drainage structure is to remain.
f. Airfield Lighting: NA
g. Airfield Markings: Provide for all airfield markings IAW UFC 3-260-4 and AFI 32-1042.
i. Provide for lead-in lines and edge striping.
ii. Provide for restrictive area boundaries and signage.
iii. Provide for wing-tip clearance markings.
iv. Provide for Entry Control Point marking.
h. Storm Water Pollution Prevention Plan (SWPPP): Provide Erosion Control Plan and obtain all permits or waivers required by SCDHEC/OCRM including any filing fees.
i. Safety & Phasing Plan: Prepare Construction Operational Safety and Phasing Plan IAW UFC 260-3-1, Section 14. This will be a stand-alone document that will be included as an attachment to the specifications. Provide at 65%, 95%, and final.
j. Project Duration Chart: A-E shall develop an aggressive construction schedule to minimize impact to the airfield and training. Provide for phasing of construction if required.
k. Design Review: A&E to Chair 65% and 95% design review meetings to be held at JBC.
l. Miscellaneous:
i. Area F is located over an active SWMU and water table below is contaminated with jet fuel. CEV does not suspect that work will encounter contaminated soils due to depth of construction, but all soils removed from the site are to be disposed of at a Subtitle D landfill. Coordinate with 628 CES/CEV for handling potentially contaminated soils.
ii. Several monitoring wells are in pavements to be removed. Coordinate with 628 CES/CEV to determine proper means/methods for replacing pavements without disturbing wells. May require SCDHEC approval which CEV will be responsible for obtaining. See attached, Figure 2, showing locations of active and abandoned monitoring wells in the vicinity of Building 578.
iii. Provide for new PCC collars around existing fire hydrants and bollard sets.
m. Provide additive bid items to help ensure project is within budget.
3. Definitions: The following definitions are provided to aid in the preparation of your SF 330:
a. "Relevant Project" is defined as Title I and Title II services specifically associated with airfield pavement.
b. “Title I Services” include services related to a specific construction project and consist of conducting field surveys and investigations to obtain design data and preparing contract plans, specifications, cost estimates, and estimated construction periods of performance. Title I services may include all aspects of design such as preparation and/or review of contract plans, specifications, design analyses, calculations, scheduling, cost estimates, Building Information Modeling (BIM), design-build conceptual designs, interior design for furniture and equipment, energy modeling and Life Cycle Cost Analyses, seismic retrofit design, building commissioning services and preparation of operating and design manuals. Title I efforts also encompass Other A-E services required to support and develop design work, including planning and programming, seismic assessments, program management, project scoping, studies, investigations, evaluations, consultations, interior facility functional/relational offices compatibility studies, value engineering, topographic survey services, geotechnical services, and hazardous materials assessments.
c. “Title II Services” include services related to a specific construction project and consist of supervision and inspection of construction. Title II services may include all aspects of construction quality assurance and oversight of facility and infrastructure construction/ renovation projects, and may include oversight of incidental environmental projects associated with primary requirements. Title II Services include construction phase credentialed architectural and engineering support services that encompass a full range of disciplinary expertise and services to include on-site construction oversight assistance, design reviews, quality assurance inspections, adherence to applicable specifications, construction schedule analysis, material submittal reviews, claim reviews, and other standard construction submittal reviews.
d. "Completed projects" are defined as those in which the firm's performance of the task for which it was hired were completed within the past five (5) years or is 80 percent complete for Title I and Title II services specifically associated with airfield pavement, and 50% complete for Title II Services, from the date this synopsis was posted. Do not list an IDIQ contract as an example of a “completed project”. Instead, list the relevant completed task order(s) or single/standalone contract.
C. SELECTION CRITERIA.
SF 330s will be evaluated to determine the most highly qualified firms. Evaluating Past Performance may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF 330 must be completed by the office/branch/individual team member actually performing the work under this contract. Projects not performed by the office/branch/individual team member will be excluded from evaluation consideration.
The selection criteria are listed below in descending order of importance. Selection Criteria 5 will be evaluated on an acceptable/unacceptable basis.
1. PROFESSIONAL QUALIFICATIONS: (a) Technical competence of individual design team members to design similar repair, alteration, and new construction projects. (b) Knowledge of multi-discipline design projects through recent design experience. (c) Knowledge of Department of Defense design criteria through recent design experience, with knowledge of Air Force design criteria being preferred. (d) Professional registration of each discipline's lead engineer. It is preferred that key personnel hold current professional registration in South Carolina. (e) An engineer registered in the discipline of fire protection with at least 5 years of fire protection experience. (f) Knowledge and application of the minimum DOD Antiterrorism Standards for Buildings. (g) Knowledge and application of sustainable design principles, including prescribing the use of recovered materials and achieving waste reduction and energy efficiency in site, facility, and landscape design. It is preferred that key personnel hold current LEED certification.
2. SPECIALIZED EXPERIENCE (a) Recent multi-discipline experience of the proposed design team, including consultants, in designing repair, alteration and new construction projects to Department of Defense criteria. (b) Experience must include design of airfield pavements (concrete and asphalt), in-depth knowledge of Unified Facility Guide Specifications for concrete & asphalt paving on airfield pavements, knowledge of UFC 3-260-01 (Airfield Heliport Planning and Design) , UFC 3-260-02 (Pavement Designs For Airfields), UFC 3-260-04 (Airfield and Heliport Marking), and UFC 3-535-01 (Visual Air Navigation Facilities). (c) Recent experience providing Title II services managing all phases of construction of airfield paving projects. (d) Experience developing Construction Safety Phasing Plans for airfield construction IAW the requirements of UFC 3-260-1, Appendex B, Section 14. (e) JBC is a Joint Use Airfield, so experience with FAA, General Aviation, and Commercial Aviation airfield design/construction projects are a plus.
3. PERFORMANCE (a) Recent past performance on contracts with DOD and private industry with respect to cost control, management, regulatory compliance, complexity/quality of work and compliance with performance schedules. Recent past performance on DOD contracts is preferred to private industry. (b) Incorporation and use of design Quality Control/Quality Assurance processes to assure fully coordinated, technically accurate plans, specifications, cost estimates and RFP documents.
4. LOCATION (a) Knowledge of probable site conditions and local requirements that can affect projects. (b) Knowledge of the local permitting processes and the ability to obtain required permits. (c) Geographic location of key personnel to ensure timely response to requests for on-site support. (d) Interested firms must be located within 150 miles driving distance of Joint Base Charleston, SC.
5. VOLUME OF DOD WORK (a) Firms will be evaluated on the volume of work previously awarded to the firm by DOD within the past 12 months with the objective of effecting an equitable distribution of contracts among qualified AE firms.
C. OTHER.
Ombudsman: An Ombudsman has been appointed to hear concerns from potential firms during the submittal development phase of this acquisition. The purpose of the Ombudsman is not to diminish the authority of the Contracting Officer, but to communicate contractor concerns, issues, disagreements, and recommendations to the appropriate Government personnel. When requested, the Ombudsman will maintain strict confidentiality as to the source of the concern. The Ombudsman does not participate in the evaluation of AE submittals or elsewhere in the acquisition process. Interested parties are invited to contact the appointed Agency Ombudsman:
Mrs. Susan Madison
AFICC OL AMC
510 POW/MIA
Scott AFB, IL 62225-5022
Phone: (618) 229-0267
Fax: (618) 256-5724
Email: susan.madison@us.af.mil
FA441821AREAF Department of the Air Force Air Mobility Command
Solicitation 1/1
2/26/21, 4:02 PM