Port Of Bremerton

Bremerton, WA

UEI
QDKNZNLEX967
CAGE
0N1D5
Primary NAICS
926120 Regulation and Administration of Transportation Programs
SAM.gov registration
Active through

Company facts

Self-certified in SAM.gov
  • U.S. Local Government
  • Municipality
  • Port Authority
Entity structure
U.S. Government Entity
NAICS codes registered in SAM.gov
SAM.gov registration date
Physical address
8850 WA-3, Bremerton, WA 98312, USA
Website
portofbremerton.org
Founded
1913
Employees
11-50
Estimated annual revenue
$1M-$10M
Industry
  1. Industrials
  2. Capital Goods
  3. Aerospace & Defense
SIC code
97 National Security & International Affairs
Profiles

Registration and certifications come from SAM.gov and the SBA; company details from public web sources. Updated .

Recent federal awards

About Port Of Bremerton

Port of Bremerton, a U.S. local government port authority based in Bremerton, Washington, operates as a federal grant recipient and occasional federal contractor for airport and maritime infrastructure management, environmental remediation, and facility services in the Pacific Northwest. The organization competes full-and-open (no set-asides) and acts exclusively as a prime recipient or contractor — no subcontract footprint appears in recent awards.

Port of Bremerton's federal footprint is heavily skewed toward grant funding rather than contracts. Recent grant work dominates the dollar exposure: a $15.74 million National Infrastructure Investments grant (CFDA 20.933) from the Maritime Administration, awarded April 15, 2026, funds design, engineering, environmental review, permitting, and construction of a replacement 1,500-foot public breakwater in Bremerton with heavy-duty concrete floats, upgraded mooring systems for approximately 60 vessels, higher-capacity guide piles engineered for extreme weather, electrical shore power infrastructure for fully electric transit fleets, and wet/dry standpipe fire suppression systems, with completion scheduled for February 15, 2029. Smaller FAA Airport Improvement Program grants include $466,572 for an airport master plan update (awarded August 12, 2025, due August 11, 2029) and two phases of environmental assessment grants totaling approximately $1.02 million for the proposed Eastside Development Area project at Bremerton National Airport (one phase awarded August 28, 2023, the second on May 13, 2024). An $800,000 EPA Brownfields Cooperative Agreement (CFDA 66.818) runs through September 30, 2028 for Phase I and II environmental assessments and remediation along the downtown Port Orchard waterfront. Additional FAA grants funded pandemic relief and airfield rehabilitation (taxiway reconfiguration, apron sealing and reconstruction, lighting systems) between 2021 and 2025.

Contract activity is minimal by comparison. Two purchase orders from GSA Region 6 Pacific Northwest and FAA Region 6 cover land rental at Bear Gulch ($20,400, July 7, 2025) and landing fees ($2,000, September 26, 2025), both without set-aside designation and representing routine operational expenses. The Port's customer base spans eight distinct federal agencies, though 84% of awards cluster within the Department of Transportation FAA (nineteen awards across Northwest Mountain and national FAA offices) and the Defense Logistics Agency (five awards). Recent award volume runs sparse — one to three awards annually between 2024 and 2026 — reflecting the Port's posture as a regional infrastructure steward dependent on episodic federal capital grants rather than sustained contract vehicles or recurring task order streams.

Quick answers

What is Port Of Bremerton's UEI?

Port Of Bremerton's Unique Entity ID (UEI) in SAM.gov is QDKNZNLEX967.

What is Port Of Bremerton's CAGE code?

Port Of Bremerton's CAGE code is 0N1D5.

What is Port Of Bremerton's primary NAICS code?

Port Of Bremerton's primary NAICS code is 926120 (Regulation and Administration of Transportation Programs).

Where is Port Of Bremerton located?

Port Of Bremerton's physical address in SAM.gov is 8850 WA-3, Bremerton, WA 98312, USA.

Is Port Of Bremerton registered in SAM.gov?

Yes. Port Of Bremerton's SAM.gov registration is active through October 29, 2026.

What is Port Of Bremerton's most recent federal award?

Port Of Bremerton's most recent federal grant award is Purpose: reseal/resurface runway; reseal/resurface taxiway. Activities to be performed/expected outcomes: this project… (35300070432026), from Northwest Mountain Region, on June 29, 2026.

On GovTribe

See Port Of Bremerton's full federal record

  • Federal contract awards
  • IDV awards
  • Federal grant awards
  • Funding analysis by agency, NAICS and set-aside
  • Similar vendors