Port Of Bellingham

Bellingham, WA

UEI
NRYGMRVUBJA6
CAGE
0ZL10
Primary NAICS
926110 Administration of General Economic Programs
SAM.gov registration
Active through

Company facts

Self-certified in SAM.gov
  • U.S. Local Government
  • Local Government Owned
  • Port Authority
  • Airport Authority
Entity structure
U.S. Government Entity
NAICS codes registered in SAM.gov
SAM.gov registration date
Physical address
1801 Roeder Ave, Bellingham, WA 98225, USA
Website
portofbellingham.com
Founded
1920
Employees
51-250
Estimated annual revenue
$10M-$50M
Industry
  1. Industrials
  2. Transportation
  3. Airlines
SIC code
45 Transportation by Air
Profiles

Registration and certifications come from SAM.gov and the SBA; company details from public web sources. Updated .

Recent federal awards

About Port Of Bellingham

Port Of Bellingham, a municipal port authority headquartered in Bellingham, Washington, receives federal grants from transportation and environmental agencies to fund airport and maritime infrastructure improvements and emissions-reduction initiatives; the vendor operates exclusively as a grant recipient (100% of recent awards) and does not compete for federal contracts.

Port Of Bellingham's federal footprint is dominated by infrastructure development grants from the Federal Aviation Administration (FAA) and Maritime Administration (MARAD) targeting Bellingham International Airport and the Bellingham Shipping Terminal. The FAA has awarded the port approximately $20 million in cumulative grants across multiple project phases — including runway lighting reconstruction, runway pavement rehabilitation, taxiway reconfiguration, snow removal equipment building construction, aircraft rescue and firefighting equipment acquisition, and airfield safety improvements. The most recent FAA grants include $9.78 million (May 2026, CFDA 20.116 Airport Improvement Program) for Phase 2 runway lighting and pavement rehabilitation, $1.33 million (August 2025, CFDA 20.106) for Phase 1 design of runway rehabilitation, and $1.07 million (July 2024) for a 1,500-gallon aircraft rescue and firefighting vehicle. MARAD has awarded $17.931 million (September 2025, CFDA 20.819 Ballast Water Treatment Technologies) for design and construction of rail connections to reinstate on-dock rail service and direct BNSF mainline connectivity at the shipping terminal, and $812 thousand (April 2026, CFDA 20.117 Airport Infrastructure Grants) for Phase 2 runway infrastructure construction. The port also received $1.703 million (August 2024, CFDA 20.816 United States Marine Highway Grants) for design and construction of a portable barge ramp at the Bellingham Shipping Terminal to support the West Coast M-5 Coastal Connector barge service. Maritime infrastructure work includes a $6.656 million MARAD grant (August 2023, ultimate completion December 2029) for pier rehabilitation and dredging at the shipping terminal to repair structural components of berths 1 and 2 and remove mooring obstructions.

Environmental and climate resilience funding comes from the Environmental Protection Agency. The port received an Inflation Reduction Act grant from EPA Region 10 (December 2024, completion November 2028) for port-wide emissions inventory development, energy transition planning, and workforce engagement, with sub-awards to the National Renewable Energy Laboratory and Pacific Northwest National Laboratory for decarbonization analysis and strategic energy planning. A second EPA Region 10 grant (August 2024, completion July 2027) funds replacement of up to five older diesel-powered marine engines with EPA 2020-compliant engines across Whatcom County, with sub-awards to the Working Waterfront Coalition.

Recent annual award volume has been modest and stable — two awards each in 2025 and 2026, compared to five in 2024 and four in 2023 — with combined potential value across all 271 recent awards totaling $25.3 million against obligated federal funds of $180 million, indicating heavy draw-down on multi-year project grants. Three awards reach ultimate completion within the next twenty-four months. The port's single sub-award on record is a fiber broadband infrastructure grant from the Washington State Executive Office (January 2023) for approximately 47 miles of middle and last mile fiber deployment in north Whatcom County. A minor Transportation Security Administration contract ($9,535.89, September 2021, closed) for installation of security roll-up door and grill at Bellingham International Airport represents the only visible federal contract prime award in the footprint.

Quick answers

What is Port Of Bellingham's UEI?

Port Of Bellingham's Unique Entity ID (UEI) in SAM.gov is NRYGMRVUBJA6.

What is Port Of Bellingham's CAGE code?

Port Of Bellingham's CAGE code is 0ZL10.

What is Port Of Bellingham's primary NAICS code?

Port Of Bellingham's primary NAICS code is 926110 (Administration of General Economic Programs).

Where is Port Of Bellingham located?

Port Of Bellingham's physical address in SAM.gov is 1801 Roeder Ave, Bellingham, WA 98225, USA.

Is Port Of Bellingham registered in SAM.gov?

Yes. Port Of Bellingham's SAM.gov registration is active through March 10, 2027.

What is Port Of Bellingham's most recent federal award?

Port Of Bellingham's most recent federal grant award is Purpose: reconstruct terminal. Activities to be performed/expected outcomes: this project replaces the chilling units… (35300050772026), from Northwest Mountain Region, on July 22, 2026.

On GovTribe

See Port Of Bellingham's full federal record

  • Federal contract awards
  • IDV awards
  • Federal grant awards
  • Funding analysis by agency, NAICS and set-aside
  • Similar vendors