TOPS 2025 Geothermal Hwy 160 Crossing Improvement Project
Awarded State & local contract opportunity Posted
- Solicitation number
- PW 2025 04
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Town of Pagosa Springs, in collaboration with the Colorado Department of Transportation (CDOT), is seeking proposals for the TOPS 2025 Geothermal Highway 160 Crossing Improvement Project (Solicitation No. 2025-PW-04). The procurement involves supplying 1,000 linear feet of 8-inch Performance Pipe Platinum Stripe 1800 PE-RT SDR 11 with Thermacore 2-inch Bonded Foam W/HDPE Jacket, 12 8-inch 45 Degree HDPE Bends, and an HDPE Fusing Machine compatible with 8-inch pipe sizing. The project aims to replace the main feed for the East Loop from S 5th St to Goodman Alley, with CDOT contractors performing excavation and TOPS staff handling installation. Proposals will be evaluated using a 100-point system, considering project approach, relevant experience, understanding, proposed project team, fee and lead time, and workload capacity. The proposal submission deadline is March 25, 2025, at 4 p.m., with electronic submissions required through the Rocky Mountain E-Purchasing System (BidNet). Potential bidders must register for free on the platform, and the Town reserves the right to accept, reject, or negotiate proposals as deemed most advantageous.
There are no specific set-aside designations or restrictions on responding organizations mentioned in the documents. The Town appears open to various bidders and has not indicated preferences for disadvantaged enterprises or specific vendor types. No incumbent vendors or current contractors are explicitly listed. The project involves integrating the new geothermal line infrastructure with existing CDOT highway reconstruction efforts, requiring precise engineering and installation specifications. While a specific budget range is not disclosed, the documents suggest the project is budget-limited, with functionality being a primary consideration during selection. The procurement includes flexibility, such as openness to fusion machine purchase or rental options, and no domestic requirements for equipment. The Town will award the contract to the most responsible contractor whose proposal provides the most advantageous terms, focusing on technical capabilities and project execution rather than strict financial constraints.
Opportunity text
Supply 8 inch Insulated HDPE piping, fittings, and fusing machine.
Files
| File | Type | Posted |
|---|---|---|
| RFP PW 2025 04 Addendum 3.pdf | ||
| RFP PW 2025 04 Addendum 1.pdf | ||
| TOPS Geothermal Line CDOT 21919.pdf | ||
| RFP PW 2025 04 Addendum 2.pdf | ||
| RFP PW 2025 04 Geo Piping CDOT 21919.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity