This document is Addendum 3 to Request for Proposal (RFP) PW-2025-04 issued by the Pagosa Springs Public Works Department in Colorado on March 11, 2024, related to the TOPS 2025 Geothermal Highway 160 Crossing Improvement Project. The addendum addresses multiple questions from potential bidders regarding a fusion machine procurement, specifically seeking an 8-inch capability machine for the project. The town would prefer to purchase the fusion machine for future installation but would also consider rental options.

The addendum clarifies several key details, including that there are no domestic requirements for the equipment, no specific preference for a rolling or tracked fusion machine, and an openness to bidders offering fusion services as a supplementary project option. The project is budget-limited, with functionality being a primary consideration during the selection process. Bidders are encouraged to propose fusing services that could potentially benefit the project's success, with the understanding that the largest pipe size requirement is 8 inches.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pagosa Springs Public Works Department

550 Pirate Drive PO Box 3249

Pagosa Springs, CO 81147 970-264-4151 ext. 400

March 11, 2024

Re: Addendum 3 RFP PW-2025-04

Question: In reference to this RFP, is the fusion machine request for a rental or purchase of the fusion machine? Also, what type of fusion will be allowed? Butt fusion or electrofusion?

Answer: Fusion machine is addressed in Amendment #2. TOPS would prefer to purchase the fusing machine for future installation, but a rental would be considered if listed as an option.

Question: Potential bidder had question on training and fusion work for projects?

Answer: If a potential bidder believes fusing services would benefit the success of the project, then bid your services as an option to be considered.

Question: Are there any domestic requirements?

Answer: None.

Question: Is there a preference for a rolling or tracked fusing machine?

Answer: No preference. Please note the project is budget limited, but functionality will be considered during the selection process.

Question: Is 8” the largest size the machine needs to be capable of fusing?

Answer: 8” would be the largest size.

Sincerely, Karl Johnson Public Works Director Town of Pagosa Springs