The engine that powers one of UNM’s cogeneration machines to make power & heat for the university must be replaced. Solar turbines is the only vendor that can do this. UNM has a replacement engine in line but must get a PO to the vendor soonest. The inabi
Closed State & local contract opportunity Posted
- Solicitation number
- 50-U6900-24-EM086
- State
- New Mexico
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from spd.gsd.state.nm.us. Updated .
About this opportunity
The University of New Mexico (UNM) is procuring a sole source emergency contract with Solar Turbines to replace an engine that powers one of UNM's cogeneration machines used to generate power and heat for the university. The emergency condition is that the existing engine must be replaced immediately, as the inability to use the cogeneration machine would result in an additional annual cost of $1.25 million to the university for the purchase of external electrical power, and would also impair the university's ability to guarantee heat in the winter. The total estimated cost for the emergency procurement with Solar Turbines is $2,500,000. Additionally, the Mora Mutual Water and Sewer Works Association (MW & SWA) in New Mexico is seeking a sole source contract with Souder, Miller & Associates (SMA) for design and construction phase engineering services for a water system improvements project. The project includes the installation of a new water supply well to replace the system's failed Well 3. SMA was chosen due to their intimate knowledge of the Mora MW & SWA water system and their ability to provide design, bidding, construction, and construction observation services. The contract is valued at $330,959.02 before tax, with an estimated tax amount of $21,581.18, and the project completion is estimated to be approximately 365 calendar days from contract execution.
The UNM emergency procurement with Solar Turbines is a sole source contract, as Solar Turbines is the only vendor capable of replacing the engine. The Mora MW & SWA sole source contract with SMA is also justified due to SMA's existing knowledge of the water system and their ability to meet the necessary deadlines within the funding constraints of state-funded monies. No other businesses have been identified as capable of performing the required services for the Mora water system improvements project. The contract opportunities do not mention any set-aside designations or restrictions on the types of organizations that can respond, and there is no information provided about incumbent vendors or existing infrastructure/technology integration requirements. The value of the UNM contract is $2,500,000, while the value of the Mora MW & SWA contract is $330,959.02 before tax, with an estimated tax amount of $21,581.18.
Opportunity text
2 versions
Update #2 · Latest ·
The University of New Mexico (UNM) has issued an emergency procurement for the replacement of an engine that powers one of UNM's cogeneration machines. The engine is critical for producing power and heat for the university. Solar Turbines, identified as the only capable vendor, has been awarded a contract worth $2,500,000 for this emergency replacement. The procurement is justified by the potential annual cost increase of $1.25M for external electrical power and the risk to the university's ability to guarantee heat in winter. Separately, the Mora Mutual Water and Sewer Works Association (MW & SWA) has issued a sole source request for engineering services related to water system improvements, including the installation of a new water supply well. Souder, Miller & Associates (SMA) has been selected as the sole source contractor for this project, with a contract value of $330,959.02 before tax. The justification for the sole source selection is based on SMA's intimate knowledge of the Mora MW & SWA water system and their ability to meet project deadlines within funding constraints.
Update #1 ·
The Mora Mutual Water and Sewer Works Association (MW & SWA) in New Mexico is seeking a sole source contract with Souder, Miller & Associates (SMA) for design and construction phase engineering services for a water system improvements project. The project includes the installation of a new water supply well to replace the system's failed Well 3 on the same property. SMA has been chosen due to their intimate knowledge of the Mora MW & SWA water system and their ability to provide design, bidding, construction, and construction observation services. The contract is valued at $330,959.02 before tax, with an estimated tax amount of $21,581.18. The project completion is estimated to be approximately 365 calendar days from contract execution.