TDF Boiler
Closed State & local contract opportunity Posted
- Solicitation number
- 22-444DHS-MENTH-B-29066
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
Opportunity details come from bidbuy.illinois.gov. Updated .
About this opportunity
This state and local contract opportunity is for the procurement of a boiler system for the Illinois Department of Human Services' Treatment and Detention Facility located in Rushville, Illinois. The agency is seeking to acquire a Triad model GPS-900-SH-M boiler system equipped with a Power Flame JR30 on/off natural gas burner, or an equivalent. The required specifications include a UV flame sensor, high pressure gas train, low and high pressure switches, and standard equipment such as a forced draft burner, circulating pumps, and Honeywell control centers. The contract is for parts only, with no installation services required. Quotes must be submitted within 90 days of the bid opening date, and the winning vendor will be selected based on the lowest total bid. The agency reserves the right to reject all offers, award by item or group of items, and waive minor defects.
The contract opportunity is open to all qualified vendors, with no mention of any set-asides or incumbent contractors. Pricing details and funding information are not provided, but the agency indicates that all quoted prices must include shipping and handling charges, and no price increases will be accepted. The contract term is not specified, but may include renewal options. Vendors must comply with various state requirements, such as certifications related to civil rights, educational loans, collective bargaining, felony convictions, delinquent debt, environmental violations, and drug-free workplaces.
Opportunity text
Triad model GPS-900-SH-M equipped with a Power Flame JR30 on/off NG gas burner, or equivalent. Burner shall include UV flame sensor not flame rod, high pressure gas train 14in to 5PSI for JR30 burner, low and high pressure switches, JR30 burner pre-piped and pre-wired 120V. Standard equipment to include forced draft burner (UL listed) circulating pump, vessel water circulating pump, Honeywell control centers for SH and DHW, combination pressure/temperature gauge. Parts only no installation.
Files
| File | Type | Posted |
|---|---|---|
| Boiler Standard Certifications V.18.1.docx | DOCX document | |
| Boiler Standard Terms and Conditions v.20.1.pdf | ||
| Boiler Forms A Section V.18.1.docx | DOCX document | |
| Boiler Notice concerning additional Covid.docx | DOCX document | |
| RFQ Boiler Revised2~2.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity